Inquiry #1: Is there any chance that Caltrans would consider changing (Line Items 22-25) TWO-COMPONENT PAINT Traffic Stripe and Pavement Marking to PAINT (2-COAT) OR THERMOPLASTIC. This would allow more competitive bidding from Striping Subcontractors as there currently is only 1 contractor in California that has a truck for TWO-COMPONENT PAINT.
Inquiry submitted 12/03/2020

Response #1:Submitted for consideration.
Response posted 12/03/2020


Response #2:Attention is directed to Addendum No.1.
Response posted 12/10/2020




Inquiry #2: The number of corrective grinding segments seem insufficient for the substantial amount of crack fill present onsite. Historically, crack fill has caused issues with smoothness. CF tends to swell when HMA is laid over it. The swelling causes bumps large enough to be detected by profilograph adding ALRs to the job. We ask that the State increases the number of segment corrections to eliminate most of the existing the crack fill or advises otherwise on how they intend to handle.
Inquiry submitted 12/14/2020

Response #1:Your inquiry has been submitted for review.
Response posted 12/14/2020


Response #2: The corrective grinding segments shown on Sheet Q-3 were determined after an analysis of the inertial profiling data and are sufficiently identified in the plans.
The additional areas of cracking refence can be found on Sheet Q-4. These locations are proposed to be dugout and repaired as stated in the plans. These locations were also field verified during the development of the project and that was the pavement strategy recommended.
Please place your bid in accordance to the current contract documents
Response posted 12/15/2020




Inquiry #3: Caltrans has been misinformed by Bidder Inquiry No. 1 requesting substitution of Two-Component Paint to Painted Traffic Stripe which resulted in Addendum Number 1. There are at least two companies within a 100 mile radius with the capability of spraying Two-Component Traffic Stripe. Please reconsider the design engineers original intentions of utilizing the Two-Component paint. The use of this product will substantially reduce maintenance costs, while providing needed Wet-Night reflectivity and increased safety for the traveling public.
Inquiry submitted 12/15/2020

Response #1:Your inquiry has been taken under review and consideration. Due to the lateness of your inquiry please place your bid in accordance with the latest contract documents.
Response posted 12/15/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.