Viewing inquiries for 10-3A7214

Submit new inquiry for this project


Inquiry #1: Bid item 25 and 26, quantity of 1.5" and 2" remote control valve seems to have the wrong quantity. In bid item 25, quantity of 1.5" remove control valve should be 38 each and in bid item 26 quantity of 2" remote control valve should be 3 each. See irrigation plans IP1 through 4. Please revise the bid items 25 and 26 and irrigation quantities sheet IQ-1 to show the correct remote-control quantities.
Inquiry submitted 10/12/2022

Response #1:Your Inquiry has been submitted for review.
Response posted 10/12/2022


Response #2:Attention is directed to Addendum #01 dated 10/13/2022.
Response posted 10/14/2022




Inquiry #2: Item 50 Building Work (Irrigation Booster Pump):
The Contract Documents specify a Booster Pump Setup for the irrigation system with a separate freestanding "Electrical Equipment Enclosure". This set up is outdated and an unnecessary complicated. A more cost efficient and easier to maintain setup would be the 'all-in-one' packaged pump skid. All component in one enclosure and on smaller concrete pad made and serviced by one company. These "Pump Skids" have been installed and successfully used on many CalTrans Projects all over Northern California for many years now.

Inquiry submitted 10/12/2022

Response #1:Your Inquiry has been submitted for review.
Response posted 10/12/2022


Response #2:Please see sections 99 for the requirements of item 50 Building Work. Please see section 6-1.05 for information regarding substitutions. Substitutions will only be considered after the contract has been awarded. Please bid per the current contract documents.
Response posted 10/14/2022




Inquiry #3: Is the booster pump being paid under Building work item 50? Please provide a model or type of pump required?
Inquiry submitted 10/12/2022

Response #1:Your Inquiry has been submitted for review.
Response posted 10/12/2022


Response #2:Yes the booster pump specification is part of section 99 and will be paid for as part of item 50, building work. Please see section 99-010000 part 1.1, item B.

Please see plan sheet 54 (M-1) and section 99-15050 for the booster pump requirements. Please bid per the current contract documents.

Response posted 10/14/2022




Inquiry #4: What bid item is supposed to cover the related cost to booster pump shown on sheet IP-1?
Also, please provide a model and detail for booster pump.

Inquiry submitted 10/13/2022

Response #1:Your inquiry has been submitted for review.
Response posted 10/14/2022


Response #2:The booster pump is part of Section 99 and will be paid as part of Item #50 “Building work”. Booster pump details are shown on Plan sheets 45 through 58. No exact model of pump was specified. Please Place your bid per the current contract documents
Response posted 10/18/2022




Inquiry #5: What items are or shall be included in bid item no.50 Building work?
Inquiry submitted 10/13/2022

Response #1:Your inquiry has been submitted for review.
Response posted 10/14/2022


Response #2:Please see plan sheet numbers 45 through 58. Please see the specifications in section 99. Please bid per the current contract documents.


Response posted 10/17/2022




Inquiry #6: Clarify if 8" HDPE conduits shown on sheet IP-1 through IP-4 are existing or new. If they are new conduits, please provide a bid item for it and advise if saw-cutting and open trench method can be used for conduits installation under existing roadway since HDPE pipe cannot be bored. Also, provide a detail for trench repair at existing roadway.
Inquiry submitted 10/13/2022

Response #1:Your inquiry has been submitted for review.
Response posted 10/14/2022


Response #2:HDPE Conduits shown are existing (as depicted by dashed symbol per Standard Plan H1). Please bid per current contract documents.
Response posted 10/20/2022




Inquiry #7: Refer to sheet IQ-3, is 3" Galvanized Steel Pipe installed from water meter to backflow preventer?
Inquiry submitted 10/13/2022

Response #1:Your inquiry has been submitted for review.
Response posted 10/14/2022


Response #2:Attention is directed to Addendum #03 dated 10/20/2022.
Response posted 10/20/2022




Inquiry #8: Refer to sheet IP-1, new wire symbols are shown along mainline. However, no new wire symbols are shown on sheet IP-2 to sheet IP-4 . Please advise.
Inquiry submitted 10/13/2022

Response #1:Your inquiry has been submitted for review.
Response posted 10/14/2022


Response #2:Attention is directed to Addendum #03 dated 10/20/2022.
Response posted 10/20/2022




Inquiry #9: Please advise which type ( Type 1 or Type 2) of temporary construction entrance ( Bid iem#8) shall be used.
Inquiry submitted 10/13/2022

Response #1:Your inquiry has been submitted for review.
Response posted 10/14/2022


Response #2:Please See Section 13-7.03 of the Standard Specifications and Standard Plans List. Please bid in accordance with current contract documents.


Response posted 10/19/2022




Inquiry #10: Please advise which type of temporary drainage inlet protection (Bid item#7) shall be used since there are 9 types provided in standard specifications.
Inquiry submitted 10/13/2022

Response #1:Your inquiry has been submitted for review.
Response posted 10/14/2022


Response #2:Please See Section 13-6.03C of the Standard Specifications and Standard Plans List. Please bid in accordance with current contract documents.
Response posted 10/19/2022




Inquiry #11: Refer to sheet ISS-1, is it possible to provide the exact GPM for pop-up sprinkler assembly and riser sprinkler assembly for bidding purpose instead of range in order to calculate more accurate cost for bid item no. 52-Irrigation water service charges?
Also, provide a watering schedule to show the required watering frequencies and water usage amount for each time of watering during construction and maintenance period, so all the bidders can bid bit this bid item equally.

Inquiry submitted 10/13/2022

Response #1:Your inquiry has been submitted for review.
Response posted 10/14/2022


Response #2:Attention is directed to Addendum #03 dated 10/20/2022.
Response posted 10/20/2022




Inquiry #12: Please confirm the information shown on water service charges chart are correct.
Typically what is shown under amount of water shall be shown in Hundred Cubic Feet (HCF).

Inquiry submitted 10/13/2022

Response #1:Your inquiry has been submitted for review.
Response posted 10/14/2022


Response #2:The information shown in SSPs section 5-1.20F is correct. Please bid per the current contract documents.
Response posted 10/18/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.