Inquiry #1: Section 12-3.11C(3) states that 2 96 by 60 inch construction funding signs are required. The plans, sheet CS-1 (Page 37), only requires 1 sign. Does Caltrans want 2 signs or just 1? Please remedy via addendum.
Inquiry submitted 03/06/2019

Response #1:Submitted for consideration.
Response posted 03/07/2019


Response #2:Please refer to Addendum No. 1, dated March 15, 2019.
Response posted 03/15/2019




Inquiry #2: Section 7-1.02K(6)(j)(iii), 3rd paragraph states "Lead at unregulated concentrations is found at a depth of 2.5 feet below existing grade to the total depth of excavation throughout the job site. Reuse all of this excavated material on the right-of-way."

Section 14-11.08 addresses materials from 0 feet to 2.5 feet below existing grade outside of the traveled way.

Please confirm that Caltrans will only pay for Type Z-2 Aerially deposited Lead Roadway Excavation per section 12-11.08 and confirm that Caltrans will pay standard Roadway Excavation quantity for all excavated material below 2.5 feet from existing grade to the total depth of excavation per the plans.


Inquiry submitted 03/07/2019

Response #1:Submitted for consideration.
Response posted 03/07/2019


Response #2:Please bid per current contract documents.
Response posted 03/15/2019




Inquiry #3: Sheet C-2, detail case 2, shows concrete barrier with a total height of 6'3". Can this be placed in two separate pours, with a construction joint?
Inquiry submitted 03/14/2019

Response #1:Submitted for consideration.
Response posted 03/14/2019


Response #2:As long as the rebar configuration is preserved, this can be placed in two separate pours.
Response posted 03/18/2019




Inquiry #4: Can you please confirm the asphalt binder grade. Specs state, "The grade of asphalt binder for Type A HMA must be A."


Inquiry submitted 03/14/2019

Response #1:Submitted for consideration.
Response posted 03/15/2019


Response #2:Please refer to Addendum No. 1, dated March 15, 2019.
Response posted 03/15/2019




Inquiry #5: Portions of the existing traffic handling conditions onsite are not accurately depicted in the project plans. Currently, the right shoulder is being used as a temporary bike path from approximately Station 1420+00 to 1436+00. The site contains k-rail on the right shoulder and a re-striped mainline to accommodate this temporary bike path. Additionally, new HMA was placed onsite connecting the existing and temporary bike path. Will these improvements be removed and the project returned to the original conditions per plan prior to the start of work?


Inquiry submitted 03/20/2019

Response #1:Submitted for consideration.
Response posted 03/20/2019


Response #2:These improvements will be removed and the project will return to the conditions shown on the plans prior to the start of work.


Response posted 03/20/2019




Inquiry #6: Portions of the existing contour grades are different from those depicted in the project plans. A new colored concrete ditch was installation at the right edge of the project limits from Station 1430+00 to 1436+00 by an adjacent project. To accommodate this new ditch, the right dirt shoulder was cut and re-graded to a steeper contour. Will these improvements be removed and the site re-graded to the original conditions per plan prior to the start of work?



Inquiry submitted 03/20/2019

Response #1:Submitted for consideration.
Response posted 03/20/2019


Response #2:No, the ditch and the grading was constructed by the adjacent project and is correctly shown on the plans and cross sections. Please bid per the current contract documents.


Response posted 03/21/2019




Inquiry #7: Plan sheets 63 through 65 detail the plant removal plan. Specifically the note on page 63 direct the Contractor to remove “dead tree stumps and fallen branches”. However, upon visiting the site, there are a number of full height trees which conflict with the project improvements. These trees have been identified onsite with a white ribbon and white “x”. Are these trees to be removed?



Inquiry submitted 03/20/2019

Response #1:Submitted for consideration.
Response posted 03/20/2019


Response #2:Yes, all trees marked with white "X" and flagging are to be removed.
Plan sheets 25 to 27 / G-1 to G-3 are within Bid Item #26: CLEARING AND GRUBBING (LS).
Plan sheets 63 to 65 / PR-1 to PR-3 are within Bid Item #30: ROADSIDE CLEARING.
Response posted 03/20/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.