Inquiry #1: Roadway quantities on sheet Q-2 reflect 351.8 CY for Digouts, but bid item 67: Replace Asphalt Concrete Surfacing has a quantity of 65 CY. Please clarify.
Inquiry submitted 01/09/2023

Response #1:Submitted for consideration.
Response posted 01/09/2023


Response #2:These are two different items:
Quantity of 351.8 CY on Q-2 is for Roadway Excavation.
Item "Replace AC Surfacing" appears on Curb Ramp Quantities Table on Q-7.


Response posted 01/10/2023




Inquiry #2: There doesn't seem to be any staging for Contractors use areas on the project. Could Caltrans please identify where we will be allowed to stage
Inquiry submitted 01/11/2023

Response #1:Submitted for consideration.
Response posted 01/11/2023


Response #2:Please bid per the current contract documents.
Response posted 01/26/2023




Inquiry #3: Compost application rate is 67 LBS/Ac or 67 CY/ Ac. Please clarify.

Inquiry submitted 01/11/2023

Response #1:Submitted for consideration.
Response posted 01/11/2023


Response #2:Please refer to Addendum #3 issued on February 8, 2023.
Response posted 02/08/2023




Inquiry #4: Please clarify if Item #122 - MGS (8' Wood Post) is correct and not 7' Wood Post. 10" x 10" x 8' Wood Post is typically used to strengthen the line post section of MGS that protects any fixed object while the 8" x 8" x 7' Wood Post is used for narrow roadway installation.
Inquiry submitted 01/11/2023

Response #1:Submitted for consideration.
Response posted 01/11/2023


Response #2:Please bid per the current contract documents.
Response posted 01/26/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.