Inquiry #1: Please refer to IR-4 for pressure mainline removals at Lincoln Ave. 55 NB on-ramp and IP-4 proposed mainline and 10" Welded Steel Pipe irrigation crossover. It seems this crossover could be eliminated as connections for proposed stations A-7 through A-9 will not change location and proposed stations A-5 and A-6 are also at the same location where existing valves are proposed to be removed. With the exception of proposed station A-25 being added, this crossover and the section of new 3" mainline could be eliminated by extending the 3" mainline at the uppermost section where the 3" mainline extends on Lincoln Avenue towards Tustin Avenue. Also, advise if the conductor for proposed control valve A-25 will need to be routed to ICC-A




Please advise.

Inquiry submitted 06/22/2020

Response #1:Submitted for consideration
Response posted 06/25/2020


Response #2:Please bid as you see it
Response posted 06/30/2020




Inquiry #2: Hello,
We are interested in bidding for bid item#130100: job site management among other items but we are unsure of what this item represents. We would like to request a description of what this item entails for this project. Is there a complete item description for job site management? Thank you.
-Bancroft Construction Services

Inquiry submitted 06/29/2020

Response #1:Pending
Response posted 06/30/2020


Response #2:Please see Standard Specification 2018 section 13-4 Job Site Management.
Response posted 06/30/2020




Inquiry #3: Irrigation Plan IP-4 shows 2" recycled water meter. Should the irrigation material such as pipes, remote control valves and sprinklers have purple color, purple warning tags or purple caps?
Inquiry submitted 07/01/2020

Response #1:Pending
Response posted 07/01/2020


Response #2:Please bid as you see it
Response posted 07/02/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.