Bidder Inquiries

Caltrans Bidding Connect Account:

Sign In (Sign in is required to access Project Plans)

Create Account (Click here to create a Caltrans Bidding Connect Account)


Viewing inquiries for 12-0Q2704

Submit new inquiry for this project


Inquiry #1: Bid Item 32 - 560218 Furnish Sign Structure (Truss) - on drawing SD-1 sheet 28 of 69 - Does this overhead structure require a walkway? Details do not call out if one is required or not - the standard drawings still have details for walkways however a directive issued by Caltrans does not require walkways when class XI reflective sheeting is used (which is being used on this structure) but has to be clarified job-by-job what is required.

Inquiry submitted 09/19/2022

Response #1:No walkway.
Response posted 09/19/2022




Inquiry #2: For Item 48 - Remove Culvert, what is the size and type of culvert being removed?
Inquiry submitted 09/27/2022

Response #1:24" RCP
Response posted 09/27/2022




Inquiry #3: Please provide a joint layout and dowel bar requirements for the various JPCP areas that are not typical freeway lane construction (Decanting Pad, Settling Basin, Maintenance Vehicle Turning Pad).
Inquiry submitted 09/27/2022

Response #1:1)Decanting pad should be constructed per details provided in sheet C-3.
2)Bid as you see for Settling basin and Turning pad.

Response posted 09/28/2022




Inquiry #4: The project site currently has a significant amount of debris leftover from the previous occupant. Will this be removed prior to the beginning of the project or should the contractor anticipate removing the debris as part of this contract?
Inquiry submitted 09/30/2022

Response #1:Pending
Response posted 10/03/2022


Response #2:Site will be cleared
Response posted 10/03/2022




Inquiry #5: On page 8 of the plans, note 2 states that all "metal" to be galvanized steel. Does rebar need to be galvanized and if so does this include the rebar in all bid items?
Inquiry submitted 10/03/2022

Response #1:Pending
Response posted 10/03/2022


Response #2:Notes on sheet C-3 are applicable to Sheet C-3 only
Response posted 10/03/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.