Search Results: Planholders

Listing for all primes seeking assistance with project 07-311904.

5 records found



Contractor: DBX, INC. Contact: JAMES C. PERRY
Address: 42024 AVENIDA ALVARADO, SUITE A TEMECULA, CA 92590
Phone: 951-296-9909 Fax: 951-296-9978 Email: dbxinc@hotmail.com
Services needed: DBX, Inc. is requesting quotes from qualified subcontractors and suppliers included certified DBE firms for the following: LEAD COMPLIANCE PLAN; CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM; JOB SITE MANAGEMENT; WATER POLLUTION CONTROL PROGRAM; ELECTRICAL MATERIALS
Requirements: DBX, Inc. is an Equal Opportunity Employer. If you have any questions, need assistance in obtaining bonding, lines of credit or insurance, technical assistance or information related to the plans, specifications and requirements for the work, or in obtaining necessary equipment, supplies, materials or related assistance or services, please contact our office. Non-DBE subs/suppliers: Indicate 2nd tier DBE participation offered on your quotation as it will be evaluated with your price. We will work with interested subs/suppliers to identify opportunities to break down items into economically feasible units to facilitate DBE participation. Plans and specifications are available to be viewed in our office between 8:00 am and 4:00 pm Monday through Friday and are also available on the Caltrans website at: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=07-311904 Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting Caltrans’ requirements and will be required to sign the standard DBX, Inc. Subcontract Agreement
Date posted: 09/03/2019
Contractor: Comet Electric, Inc Contact: Chelsy Lovan
Address: 21625 Prairie Street, Chatsworth CA
Phone: 818-340-0965 Fax: 818-340-4033 Email: chelsylovan@cometelectric.com
Services needed: LEAD COMPLIANCE, PROGRESS SCHEDULE( CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (WDAY), CONTROL AREA SIGNS, TRAFFIC CONTROL SYSTEM, PREPARE WATER POLLUTION CONTROL PROGRAM, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION.
Requirements:
Date posted: 09/03/2019
Contractor: Sturgeon Electric California, LLC Contact: Mike Heffernan
Address: 13501 Benson Avenue Chino, CA 91710
Phone: 909-591-0000 Fax: 909-591-0001 Email: mheffernan@myrgroup.com
Services needed: 1 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 2 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS LUMP SUM 3 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 375 4 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 5 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 6 130100 JOB SITE MANAGEMENT LS LUMP SUM 7 130200 PREPARE WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 8 870009 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION LS LUMP SUM
Requirements:
Date posted: 09/03/2019
Contractor: International Line Builders Contact: Curt Rusick
Address: 3955 Temescal Canyon Road Corona, CA 92883
Phone: 951-682-2982 Fax: 951-346-3180 Email: Curt.Rusick@ilbinc.com
Services needed: Lead Compliance Plan, Progress Schedule (Critical Path Method), Time-Related Overhead (WDAY), Construction Area Signs, Traffic Control System, Job Site Management, Prepare Water Pollution Control Program, Maintaining Existing Traffic Management System Elements During Construction, Mobilization
Requirements: Union Signatory & DBE.
Date posted: 09/09/2019
Contractor: Select Electric, Inc. Contact: Estimating Department
Address: 2790 Business Park Drive Vista, CA 92081
Phone: 619-460-6060 Fax: 619-460-6069 Email: estimating@selectelectricinc.com
Services needed: Lead Compliance Plan, Progress Schedule (Critical Path Method), Time-Related Overhead (WDAY), Construction Area Signs, Traffic Control System, Job Site Management, Prepare Water Pollution Control Program, Maintaining Existing Traffic Management System Elements During Construction, Mobilization
Requirements:
Date posted: 09/11/2019