Search Results: Planholders

Listing for all primes seeking assistance with project 11-420104.
2 results found.

Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Plastic Traffic Drums, Portable Changeable Message Sign (Ea), Temporary Railing (Type K), Temporary Alternative Crash Cushion System, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Temporary Landscape Protection Area Fence (Rope), Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Type Z-2) (Aerially Deposited Lead), Imported Borrow (Cy), Roadside Clearing, Weed Germination, Cultivation, Packet Fertilizer, Plant (Group A), Plant (Group B), Plant (Group U),Sod, Plant Establishment Work, Wood Mulch, Remove Irrigation Facility, Test And Modify Control Conductors, Control And Neutral Conductors, 1" Remote Control Valve, 1 1/2" Remote Control Valve, Modify Irrigation Controller '55e', Recycled Water Identification And Warning Signs, Tree Well Sprinkler Assembly, Riser Sprinkler Assembly (Gear Driven), Pop-Up Sprinkler Assembly (Gear Driven), Replace Valve Box Cover, 2" Gate Valve, 4" Gate Valve, 1" Plastic Pipe (Schedule 40) (Supply Line), 1 1/4" Plastic Pipe (Schedule 40) (Supply Line), 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Schedule 40) (Supply Line), 2 1/2" Plastic Pipe (Schedule 40) (Supply Line), 4" Plastic Pipe (Class 315) (Supply Line), Temporary Irrigation (Supply Line), 8" Corrugated High Density Polyethylene Pipe Conduit, Move-In/Move-Out (Erosion Control), Hydroseed, Compost (Cy), Incorporate Materials, Class 2 Aggregate Base (Cy), Asphaltic Emulsion (Fog Seal Coat), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Jointed Plain Concrete Pavement, Joint Seal (Silicone), Isolation Joint Seal (Silicone), Grind Existing Concrete Pavement, 16" Cast-In-Drilled-Hole Concrete Piling (Barrier), 60" Cast-In-Drilled-Hole Concrete Pile (Sign Foundation), Structural Concrete, Drainage Inlet, Minor Concrete (Minor Structure), Furnish Sign Structure (Truss), Install Sign Structure (Truss), Remove Sign Structure (Ea), 18" Alternative Pipe Culvert, 24" Alternative Pipe Culvert, 24" Alternative Pipe Culvert (Type C), Grated Line Drain, Abandon Culvert (Ea), Remove Inlet, Cap Inlet, Sand Backfill, Concrete (Ditch Lining), Miscellaneous Iron And Steel, Chain Link Fence (Type Cl-6),Remove Chain Link Fence, Guard Railing Delineator, Pavement Marker (Retroreflective), Remove Roadside Sign, Furnish Laminated Panel Sign (1"-Type A) For Retroreflective Sheeting (Type Xi), Furnish Laminated Panel Sign (1"-Type B) For Retroreflective Sheeting (Type Xi), Furnish Single Sheet Aluminum Sign (0.080"-Unframed) For Retroreflective Sheeting (Type Xi), Furnish Single Sheet Aluminum Sign (0.063"-Framed) For Retroreflective Sheeting (Type Xi), Retroreflective Sheeting (Type Xi), Roadside Sign - Two Post, Install Roadside Sign (Laminated Wood Box Post), Midwest Guardrail System, Transition Railing (Type Wb-31), Alternative In-Line Terminal System, Concrete Barrier (Type 60ms), Concrete Barrier (Type 736sv Modified) (Colored Concrete), Remove Guardrail, Contrast Stripe, Paint Traffic Stripe (2-Coat), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3), Remove Painted Traffic Stripe, Remove Thermoplastic Traffic Stripe, 8" Traffic Stripe Tape With Black Film (Warranty), 6" Traffic Stripe Tape With Black Film (Broken 36-12) (Warranty), Subsurface Locator, Fiber Optic System, Modifying Existing Electrical System. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting Caltrans’ requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 02/04/2019
Contractor: SEMA Construction, Inc. Contact: Estimating
Address: 42690 Rio Nedo Ste. G Temecula, Ca 92590
Phone: 303-627-2600 Fax: 951-296-6448 Email: estimating.ca@semaconstruction.com
Services needed: INVITATION TO BID FROM: SEMA Construction, Inc. 42690 Rio Nedo Ste. G Temecula, Ca 92590 Phone: (303) 627-2600 Fax:(951) 296-6448 Bid Information: PROJECT NAME: Caltrans 11-420104 Route 5/52 Separation Auxiliary Lane Construction OWNER’S BID DATE: 3/27/2019 LOCATION: San Diego, Ca SEMA Construction is requesting subcontractor and material supply quotes from DBE subcontractors and material suppliers to meet the 18.0% DBE goal. All DBE firms are encouraged to participate. All NON- DBE firms are encouraged to utilize DBE firms as part of their quotes. Please contact SEMA if you require assistance obtaining: bonding, lines of credit, insurance, equipment, supplies, materials or related services. EOE. Submit quotes to: SEMA Construction, 42690 Rio Nedo Ste. G Temecula, Ca 92590 Phone: (303) 627-2600 – Fax: (951) 296- 6448 – Email: estimating.ca@semaconstruction.com NOTE: *** Please clearly indicate on your quote if you are a DBE firm. *** *** If you are a NON- DBE firm, please list ALL 2nd TIER DBE firm names, work scope, and value of work DBE firm will be performing or supplying clearly on your quote. *** Project Description: Major items for the project include: Subcontractors / Installation: LEAD COMPLIANCE PLAN,PROGRESS SCHEDULE (CRITICAL PATH METHOD),TIME-RELATED OVERHEAD (WDAY),DEVELOP WATER SUPPLY,CONSTRUCTION AREA SIGNS,TRAFFIC CONTROL SYSTEM,PLASTIC TRAFFIC DRUMS,PORTABLE CHANGEABLE MESSAGE SIGN (EA),TEMPORARY RAILING (TYPE K),TEMPORARY ALTERNATIVE CRASH CUSHION SYSTEM,JOB SITE MANAGEMENT,PREPARE STORM WATER POLLUTION PREVENTION PLAN,RAIN EVENT ACTION PLAN,STORM WATER SAMPLING AND ANALYSIS DAY,STORM WATER ANNUAL REPORT,MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL),TEMPORARY HYDRAULIC MULCH,TEMPORARY CHECK DAM,TEMPORARY DRAINAGE INLET PROTECTION,TEMPORARY FIBER ROLL,TEMPORARY CONSTRUCTION ENTRANCE,STREET SWEEPING,TEMPORARY CONCRETE WASHOUT,TREATED WOOD WASTE,TEMPORARY LANDSCAPE PROTECTION AREA FENCE (ROPE),CLEARING AND GRUBBING (LS),ROADWAY EXCAVATION,ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD),IMPORTED BORROW (CY),ROADSIDE CLEARING,WEED GERMINATION,CULTIVATION,PACKET FERTILIZER,PLANT (GROUP A),PLANT (GROUP B),PLANT (GROUP U),SOD,PLANT ESTABLISHMENT WORK,WOOD MULCH,REMOVE IRRIGATION FACILITY,TEST AND MODIFY CONTROL CONDUCTORS,CONTROL AND NEUTRAL CONDUCTORS,1" REMOTE CONTROL VALVE,1 1/2" REMOTE CONTROL VALVE,MODIFY IRRIGATION CONTROLLER '55E',RECYCLED WATER IDENTIFICATION AND WARNING SIGNS,TREE WELL SPRINKLER ASSEMBLY,RISER SPRINKLER ASSEMBLY (GEAR DRIVEN),POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN),REPLACE VALVE BOX COVER,2" GATE VALVE,4" GATE VALVE,1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE),1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE),1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE),2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE),2 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE),4" PLASTIC PIPE (CLASS 315) (SUPPLY LINE),TEMPORARY IRRIGATION (SUPPLY LINE),8"CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT,MOVE-IN/MOVE-OUT (EROSION CONTROL),HYDROSEED,COMPOST (CY),INCORPORATE MATERIALS,CLASS 2 AGGREGATE BASE (CY),ASPHALTIC EMULSION (FOG SEAL COAT),HOT MIX ASPHALT (TYPE A),PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA),TACK COAT,JOINTED PLAIN CONCRETE PAVEMENT,JOINT SEAL (SILICONE),ISOLATION JOINT SEAL (SILICONE),GRIND EXISTING CONCRETE PAVEMENT,16" CAST-IN-DRILLED-HOLE CONCRETE PILING (BARRIER),60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION),STRUCTURAL CONCRETE, DRAINAGE INLET,MINOR CONCRETE (MINOR STRUCTURE),FURNISH SIGN STRUCTURE (TRUSS),INSTALL SIGN STRUCTURE (TRUSS),REMOVE SIGN STRUCTURE (EA),18" ALTERNATIVE PIPE CULVERT,24" ALTERNATIVE PIPE CULVERT,24" ALTERNATIVE PIPE CULVERT (TYPE C),GRATED LINE DRAIN,ABANDON CULVERT (EA),REMOVE INLET,CAP INLET,SAND BACKFILL,CONCRETE (DITCH LINING),MISCELLANEOUS IRON AND STEEL,CHAIN LINK FENCE (TYPE CL-6),REMOVE CHAIN LINK FENCE,GUARD RAILING DELINEATOR,PAVEMENT MARKER (RETROREFLECTIVE),REMOVE ROADSIDE SIGN,FURNISH LAMINATED PANEL SIGN (1"-TYPE A) FOR RETROREFLECTIVE SHEETING (TYPE XI),FURNISH LAMINATED PANEL SIGN (1"-TYPE B) FOR RETROREFLECTIVE SHEETING (TYPE XI),FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI),FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI),RETROREFLECTIVE SHEETING (TYPE XI),ROADSIDE SIGN - TWO POST,INSTALL ROADSIDE SIGN (LAMINATED WOOD BOX POST),MIDWEST GUARDRAIL SYSTEM,TRANSITION RAILING (TYPE WB-31),ALTERNATIVE IN-LINE TERMINAL SYSTEM,CONCRETE BARRIER (TYPE 60MS),CONCRETE BARRIER (TYPE 736SV MODIFIED) (COLORED CONCRETE),REMOVE GUARDRAIL,CONTRAST STRIPE,PAINT TRAFFIC STRIPE (2-COAT),6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY),8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY),8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3),REMOVE PAINTED TRAFFIC STRIPE,REMOVE THERMOPLASTIC TRAFFIC STRIPE,8" TRAFFIC STRIPE TAPE WITH BLACK FILM (WARRANTY),6" TRAFFIC STRIPE TAPE WITH BLACK FILM (BROKEN 36-12) (WARRANTY),SUBSURFACE LOCATOR,FIBER OPTIC SYSTEM,MODIFYING EXISTING ELECTRICAL SYSTEM,MOBILIZATION Material Supply Only: aggregates and riprap, geotextiles, steel piling, MSE wall supplies, bearing & expansion devices, concrete ready mix (B, D, H), rebar, pipe (RCP, PVC, inlets, manholes), and concrete girders. A FOLLOW-UP CALL WILL BE MADE TO YOUR COMPANY IF WE DO NOT RECEIVE A RESPONSE.
Requirements:
Date posted: 02/11/2019

Contracting Information

Statewide Alerts and Other Information