01-0E0304
Erosion control with RSP,plant establishment and branch packing.
01-Hum-299-R16.1/R26.6 * Date Advertised 09/23/2019
Bids Opening in Sacramento * Bids Open 10/30/2019
Estimate: $1,700,000
In Humboldt County At Various Locations From 5.1 Miles East Of North Fork Mad River Bridge To 4.3 Miles East Of Redwood Creek Bridge
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-12, C-8.
315 Working Days * 3% DVBE Requirement

01-362704
Hot mix asphalt overlay.
01-Men-1-62.2/R78.9 * Date Advertised 09/23/2019
Bids Opening in Sacramento * Bids Open 10/31/2019
Estimate: $14,600,000
In Mendocino County Near Fort Bragg From 0.1 Mile North Of Pudding Creek Bridge To 0.6 Mile North Of Wages Creek Bridge
The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.
105 Working Days * 16% DBE Requirement *


02-1H9704
Curve realignment and HMA paving.
02-Teh-36-12.6/13.1 * Date Advertised 09/30/2019
Bids Opening in Sacramento * Bids Open 10/31/2019
Estimate: $2,710,000
In Tehama County About 16 Miles East Of Platina From 2.3 Miles East To 2.8 Miles East Of Dry Creek Bridge
The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.
75 Working Days * 16% DBE Requirement *


03-0A5704
This project has a mandatory pre-bid meeting
Construct bridge, realign curve, widen shoulders and culvert work.
03-Yub-20-13.3/R18.2 * Date Advertised 09/30/2019
Bids Opening in Sacramento * Bids Open 11/20/2019
Estimate: $47,000,000
In Yuba County From Marysville Road To The Yuba River Bridge
The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.
700 Working Days * 13% DBE Requirement *


04-0J6424
Crack, seat and overlay with RHMA and HMA, and replace culverts.
04-Son-101-32.8/R54.2 * Date Advertised 09/23/2019
Bids Opening in Sacramento * Bids Open 11/14/2019
Estimate: $67,000,000
In Sonoma County At Various Locations From Limerick Lane Overcrossing To Route 101/128 Separation
The Contractor must have either a Class A license or a combination of Class C licenses which constitutes a majority of the work.
550 Working Days * DVBE participation incentive up to $250,000 *


04-1A2104
Place jointed plain concrete pavement and modify electrical system.
04-Son-37-2.6 * Date Advertised 09/30/2019
Bids Opening in Sacramento * Bids Open 10/24/2019
Estimate: $1,910,000
In Sonoma County Near Novato At 0.6 Mile East Of Lakeville Highway
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-10, C-12, C-8.
60 Working Days * 14% DBE Requirement *


04-3J1904
Install accessible pedestrian signal and re-stripe crosswalk.
04-Ala-185, 238, 262-Var * Date Advertised 09/23/2019
Bids Opening in Sacramento * Bids Open 10/15/2019
Estimate: $2,820,000
In Alameda County At Various Locations
The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-10, C-12, C-32.
100 Working Days * 13% DBE Requirement *


04-4G8204
Place CISS conc pile, PCPS conc slab & replace structural conc bridge.
04-Mrn-101-10.6/10.8 * Date Advertised 09/23/2019
Bids Opening in Sacramento * Bids Open 11/13/2019
Estimate: $11,500,000
In Marin County, In San Rafael From Route 101 Northbound Off-ramp To 2nd Street
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-8, C-12, C-61D30.
200 Working Days * 19% DBE Requirement *


05-1F6304
Construct ADA pathways and ramps, drainage systems and signals.
05-SLO-41-14.2/15.9 * Date Advertised 09/23/2019
Bids Opening in Sacramento * Bids Open 10/29/2019
Estimate: $4,700,000
In San Luis Obispo County In Atascadero From San Gabriel Road To Route 101/41 Separation
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-8, C-12.
140 Working Days * 14% DBE Requirement *


07-299104
Replace roadside sign and pavement marking, and const catch basin.
07-LA-1-3.5 * Date Advertised 09/30/2019
Bids Opening in Sacramento * Bids Open 10/23/2019
Estimate: $550,000
In In Los Angeles County In Long Beach At Los Alamitos Traffic Circle
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-31, C-32.
60 Working Days * 5% DVBE Requirement


07-306504
Replace curb ramps and electrical systems.
07-LA-66-0.0/3.2 * Date Advertised 09/30/2019
Bids Opening in Sacramento * Bids Open 10/22/2019
Estimate: $2,210,000
In Los Angeles County In La Verne, Pomona And Claremont From Baseline Road To Town Avenue
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-8, C-10.
150 Working Days * 15% DBE Requirement *


07-311404
Place rock blanket, plant establishment and modify irrigation system.
07-LA-101-1.7/6.8 * Date Advertised 09/30/2019
Bids Opening in Sacramento * Bids Open 11/05/2019
Estimate: $4,700,000
In Los Angeles County In Los Angeles From Beaudry Avenue Undercrossing To 0.1 Mile South Of Gower Street Undercrossing
The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-27.
1000 Working Days * 13% DBE Requirement *


07-312004
Modify traffic communication and electrical systems.
07-LA-2,5,101,105,110-Var * Date Advertised 09/30/2019
Bids Opening in Sacramento * Bids Open 11/06/2019
Estimate: $25,000,000
In Los Angeles County At Various Locations
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-7, C-10.
500 Working Days *


08-0K1214
This project has a mandatory pre-bid meeting
Replace PCC pavement with JPCP and precast jointed concrete pavement.
08-SBd-15-12.5/14.8 * Date Advertised 09/30/2019
Bids Opening in Sacramento * Bids Open 11/21/2019
Estimate: $22,900,000
In San Bernardino County In Fontana And Near Devore From 0.3 Mile South Of Sierra Avenue Undercrossing To Glen Helen Parkway Undercrossing
The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-8, C-12.
160 Working Days * 16% DBE Requirement *


08-0R1504
This project has a mandatory pre-bid meeting
Regrade median cross slopes.
08-SBd-40-R75.0/R100.0 * Date Advertised 09/30/2019
Bids Opening in Sacramento * Bids Open 11/13/2019
Estimate: $22,200,000
In San Bernardino County From 3.2 Miles West Of Kelbaker Road Undercrossing To Essex Road Overcrossing
The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.
375 Working Days * 17% DBE Requirement *


08-1C9304
Pipe lining.
08-SBd-173-10.8/23.0 * Date Advertised 09/30/2019
Bids Opening in Sacramento * Bids Open 10/22/2019
Estimate: $480,000
In San Bernardino County At Various Locations From Big Pines Creek To Route 18
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-32, C-42.
40 Working Days * 5% DVBE Requirement


12-0N6604
Install railings, barriers, drainage systems, and electroliers.
12-Ora-133-R3.9/13.6 * Date Advertised 09/30/2019
Bids Opening in Sacramento * Bids Open 11/07/2019
Estimate: $10,100,000
In Orange County In Laguna Beach And Irvine From 0.1 Mile South Of Route 73/133 Separation To Route 133/241 Separation
The Contractor must have either a Class A license or a combination of Class C licenses which constitutes a majority of the work.
250 Working Days *