List of Bid Items

Note: This list is not updated when addenda are issued. For informational purposes only.
Contract Number 04-3G4544
Date Adv.: 10/07/2019


Item No. Item Code Item Description Unit of Measure Estimated Quantity
1080050PROGRESS SCHEDULE (CRITICAL PATH METHOD)LSLUMP SUM
2090100TIME-RELATED OVERHEAD (WDAY)WDAY810
3120100TRAFFIC CONTROL SYSTEMLSLUMP SUM
4128652PORTABLE CHANGEABLE MESSAGE SIGN (LS)LSLUMP SUM
5130100JOB SITE MANAGEMENTLSLUMP SUM
6130200PREPARE WATER POLLUTION CONTROL PROGRAMLSLUMP SUM
7130730STREET SWEEPINGLSLUMP SUM
8130900TEMPORARY CONCRETE WASHOUTLSLUMP SUM
9(F)046870STRUCTURAL CONCRETE, BRIDGE (REPAIR)CY23
10511106DRILL AND BOND DOWELLF165
11511111DRILL AND BOND DOWEL (CHEMICAL ADHESIVE) (LF)LF2,639
12(F)520102BAR REINFORCING STEEL (BRIDGE)LB2,458
13(F)046871WELDED WIRE REINFORCEMENT (STAINLESS STEEL)SQFT3,666
14046872GALVANIC ANODEEA17,641
15046873PAINT BRIDGE IDENTIFICATION NUMBEREA793
16600003INJECT CRACK (EPOXY)LF487
17600013REPAIR SPALLED SURFACE AREASQFT26,184
18600114BRIDGE REMOVAL (PORTION)LSLUMP SUM
19999990MOBILIZATIONLSLUMP SUM