Note: This list is not updated when addenda are issued. For informational purposes only.
Contract Number 08-0N6704
Date Adv.: 12/10/2018

Item No.Item
Code
Item Description Unit of
Measure
Estimated
Quantity
1070030LEAD COMPLIANCE PLANLSLUMP SUM
2080050PROGRESS SCHEDULE (CRITICAL PATH METHOD)LSLUMP SUM
3090100TIME-RELATED OVERHEAD (WDAY)WDAY340
4100100DEVELOP WATER SUPPLYLSLUMP SUM
5120090CONSTRUCTION AREA SIGNSLSLUMP SUM
6120100TRAFFIC CONTROL SYSTEMLSLUMP SUM
7120110FLASHING ARROW SIGNEA4
8120120TYPE III BARRICADEEA50
9120149TEMPORARY PAVEMENT MARKING (PAINT)SQFT75
10120159TEMPORARY TRAFFIC STRIPE (PAINT)LF18,500
11120165CHANNELIZER (SURFACE MOUNTED)EA500
12120198PLASTIC TRAFFIC DRUMSEA530
13120300TEMPORARY PAVEMENT MARKEREA240
14036949RETROREFLECTIVE SHEETING, TYPE XI FOR CONSTRUCTION AREA SIGNSQFT860
15124000TEMPORARY PEDESTRIAN ACCESS ROUTELSLUMP SUM
16128652PORTABLE CHANGEABLE MESSAGE SIGN (LS)LSLUMP SUM
17130100JOB SITE MANAGEMENTLSLUMP SUM
18130300PREPARE STORM WATER POLLUTION PREVENTION PLANLSLUMP SUM
19130310RAIN EVENT ACTION PLANEA40
20130320STORM WATER SAMPLING AND ANALYSIS DAYEA26
21130330STORM WATER ANNUAL REPORTEA3
22130560TEMPORARY SOIL BINDERSQYD68,000
23130570TEMPORARY COVERSQYD1,000
24130620TEMPORARY DRAINAGE INLET PROTECTIONEA190
25130640TEMPORARY FIBER ROLLLF2,500
26130650TEMPORARY GRAVEL BAG BERMLF43,700
27130680TEMPORARY SILT FENCELF8,300
28130900TEMPORARY CONCRETE WASHOUTLSLUMP SUM
29141103REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE)LF133,000
30141104REMOVE YELLOW THERMOPLASTIC PAVEMENT MARKING (HAZARDOUS WASTE)SQFT420
31141120TREATED WOOD WASTELB8,250
32146002CONTRACTOR-SUPPLIED BIOLOGIST (LS)LSLUMP SUM
33153121REMOVE CONCRETE (CY)CY59
34170103CLEARING AND GRUBBING (LS)LSLUMP SUM
35180106DUST PALLIATIVELSLUMP SUM
36190101ROADWAY EXCAVATIONCY30,800
37190123ROADWAY EXCAVATION (TOPSOIL)CY52
38192502SAND BEDDINGCY79
39(F)193006STRUCTURE BACKFILL (SLURRY CEMENT)CY161
40(F)193118CONCRETE BACKFILLCY4
41200114ROCK BLANKETSQFT48
42202006SOIL AMENDMENTCY140
43202037ORGANIC FERTILIZERLB1,140
44204030TRANSPLANT TREEEA8
45204035PLANT (GROUP A)EA4,500
46204036PLANT (GROUP B)EA49
47204096MAINTAIN EXISTING PLANTED AREASLSLUMP SUM
48204099PLANT ESTABLISHMENT WORKLSLUMP SUM
49205035WOOD MULCHCY79
50206400CHECK AND TEST EXISTING IRRIGATION FACILITIESLSLUMP SUM
51206402OPERATE EXISTING IRRIGATION FACILITIESLSLUMP SUM
52208447POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN)EA27
53(F)2085943/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)LF360
54(F)2085951" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)LF100
55(F)2085961 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)LF120
56(F)208690PVC PIPE CONDUIT (SLEEVE)LF40
57210010MOVE-IN/MOVE-OUT (EROSION CONTROL)EA6
58210121DUFF (ACRE)ACRE0.1
59210430HYDROSEEDSQFT290,000
60210610COMPOST (CY)CY2,960
61210630INCORPORATE MATERIALSSQFT387,000
62260203CLASS 2 AGGREGATE BASE (CY)CY16,000
63390100PRIME COATTON40
64390132HOT MIX ASPHALT (TYPE A)TON60,100
65390137RUBBERIZED HOT MIX ASPHALT (GAP GRADED)TON13,000
66394075PLACE HOT MIX ASPHALT DIKE (TYPE D)LF1,560
67394090PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA)SQYD8
68397005TACK COATTON73
69398000REMOVE ASPHALT CONCRETE PAVEMENT (CY)CY11,000
70398200COLD PLANE ASPHALT CONCRETE PAVEMENTSQYD39,800
71(F)510090STRUCTURAL CONCRETE, BOX CULVERTCY134
72(F)510092STRUCTURAL CONCRETE, HEADWALLCY47
73(F)510094STRUCTURAL CONCRETE, DRAINAGE INLETCY327
74(F)510502MINOR CONCRETE (MINOR STRUCTURE)CY150
75(F)520101BAR REINFORCING STEELLB26,700
7661010312" ALTERNATIVE PIPE CULVERTLF110
7761010818" ALTERNATIVE PIPE CULVERTLF3,890
7861011224" ALTERNATIVE PIPE CULVERTLF8,270
7961012136" ALTERNATIVE PIPE CULVERTLF120
8066502224" CORRUGATED STEEL PIPE (.064" THICK)LF170
8166503130" CORRUGATED STEEL PIPE (.079" THICK)LF89
82700617DRAINAGE INLET MARKEREA22
8370530712" ALTERNATIVE FLARED END SECTIONEA4
8470531524" ALTERNATIVE FLARED END SECTIONEA7
8570711736" PRECAST CONCRETE PIPE INLETLF3
86710132REMOVE CULVERT (LF)LF460
87710144REMOVE REINFORCED CONCRETE BOX CULVERT (LF)LF60
88710150REMOVE INLETEA4
89710152REMOVE HEADWALLEA6
90710212ADJUST MANHOLE TO GRADEEA9
91710214ADJUST VALVE BOX FRAME AND COVER TO GRADEEA8
92721430CONCRETE (CHANNEL LINING)CY88
93723050ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY)CY88
94723070ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY)CY48
95723095ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY)CY7
96729011ROCK SLOPE PROTECTION FABRIC (CLASS 8)SQYD38
97730020MINOR CONCRETE (CURB) (CY)CY1,650
98730045MINOR CONCRETE (GUTTER) (CY)CY220
99730070DETECTABLE WARNING SURFACESQFT220
100731502MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION)CY24
101731504MINOR CONCRETE (CURB AND GUTTER)CY1,430
102731516MINOR CONCRETE (DRIVEWAY)CY19
103731519MINOR CONCRETE (STAMPED CONCRETE)SQFT253,000
104731521MINOR CONCRETE (SIDEWALK)CY110
105731623MINOR CONCRETE (CURB RAMP)CY20
106731760REMOVE CONCRETE CURB AND SIDEWALK (SQYD)SQYD1,880
107733000PRE/POST CONSTRUCTION SURVEYSEA8
108(F)750001MISCELLANEOUS IRON AND STEELLB53,300
109780230SURVEY MONUMENT (TYPE D)EA75
110036950WILDLIFE FENCELF4,860
111810120REMOVE PAVEMENT MARKEREA6,600
112810170DELINEATOR (CLASS 1)EA41
113810230PAVEMENT MARKER (RETROREFLECTIVE)EA12,500
114820141OBJECT MARKER (TYPE K-1)EA60
115820250REMOVE ROADSIDE SIGNEA55
116820610RELOCATE ROADSIDE SIGNEA14
117820750FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED)SQFT640
118820760FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED)SQFT190
119820780FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED)SQFT94
120820790FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED)SQFT47
121036951RETROREFLECTIVE SHEETING, TYPE XI (FOR ROADSIDE SIGN)SQFT520
122820840ROADSIDE SIGN - ONE POSTEA130
123820850ROADSIDE SIGN - TWO POSTEA7
124832005MIDWEST GUARDRAIL SYSTEMLF1,360
125(F)833085PIPE HANDRAILINGLF50
126(F)839521CABLE RAILINGLF44
127839543TRANSITION RAILING (TYPE WB-31)EA3
128839581END ANCHOR ASSEMBLY (TYPE SFT)EA4
129839584ALTERNATIVE IN-LINE TERMINAL SYSTEMEA7
130839640CONCRETE BARRIER (TYPE 60M)LF300
131839752REMOVE GUARDRAILLF300
132840516THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY)SQFT9,830
1338460076" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY)LF267,000
1348460098" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY)LF25,200
135846030REMOVE THERMOPLASTIC TRAFFIC STRIPELF128,000
136846035REMOVE THERMOPLASTIC PAVEMENT MARKINGSQFT13,100
137870700FLASHING BEACON SYSTEMLSLUMP SUM
138872130MODIFYING EXISTING ELECTRICAL SYSTEMLSLUMP SUM
139872140REMOVING EXISTING ELECTRICAL SYSTEMLSLUMP SUM
140999990MOBILIZATIONLSLUMP SUM