Submit new inquiry for this projectInquiry #1: Drainage System 3 shown on plan sht.D-2 [51/174] is a Reinforced Concrete Box - 6'W x 3' Ht. x 87.8 Lf. transversely crossing Rte. 36. Reviewing the "Stage Construction and Traffic Handling plan sht's. SC-2 & SC-4 [79 & 81/174] no attention is given to the construction of this major drainage component. We assume you would decide to follow the Staging indicated for the Ward Creek Bridge by lengthening the bridge construction detour by approximately 1,000 Lf. Additionally please provide a construction detail on how we are to build half of the Reinforced Concrete Box, Temporarily Shore between Stages and connect & pass the winter water flow into the remaining elliptical culvert to be replaced in a subsequent Stage?
Inquiry submitted 09/23/2024
Response #1:(BI#1) - Your inquiry has been received and is being reviewed.
Response posted 09/23/2024
Response #2:(BI#1) - Please direct your attention to Section 12-4.02C(7)(b), bid per current contract bid documents.
Response posted 09/25/2024
Inquiry #2: Please provide roadway cross sections.
Inquiry submitted 10/01/2024
Response #1:(BI#2) - Your inquiry has been received and is being reviewed.
Response posted 10/01/2024
Response #2:(BI#2) - “Direct your attention to Supplemental Info files provided for this project. The “Cross Sections” for this project are available in the file named “01-0J8904-Digital-Design-File.zip”. Bid per current contract bid documents.”
Response posted 10/02/2024
Inquiry #3: Is there a Drainage Summary Sheet available?
Inquiry submitted 10/07/2024
Response #1:(BI#3) - Your inquiry has been received and is being reviewed.
Response posted 10/07/2024
Response #2:(BI#3) - Please direct your attention to Addenda No. 1 posted on October 25, 2024.
Response posted 10/25/2024
Inquiry #4: Bid Item 85 - Ultra High Performance Concrete Mock-up with a quantity of 1 Ea. is shown on Sheet No. 159/174. Note 1 indicates 2 mock-up specimens are required. Since the Bid Item quantity is 1 Ea. we assume Note 1 is referring to the two concrete reinforced sides of one Mock-up Specimen. If Caltrans intent is to have two distinct UHPC Mock-ups then we would expect that Bid Item 85 would be extended and paid for as a quantity of 2 Ea. Please clarify?
Inquiry submitted 10/10/2024
Response #1:(BI#4) - Your inquiry has been received and is being reviewed.
Response posted 10/10/2024
Response #2:(BI#4) - Please direct your attention to Addenda No. 1 posted on October 25, 2024.
Response posted 10/25/2024
Inquiry #5: Bid item 0034 : Asbestos Compliance Plan. Special Provisions say to add Section 14-9.02 "The asbestos survey and sampling report for this project is included in the Information Handout." We see no such report. Please advise.
Inquiry submitted 10/14/2024
Response #1:(BI#5) - Your inquiry has been received and is being reviewed.
Response posted 10/14/2024
Response #2:(BI#5) - Please direct your attention to Addenda No. 1 posted on October 25, 2024.
Response posted 10/25/2024
Inquiry #6: Hot Mix Asphalt;
Why are you specifying Warm Mix Asphalt for Both for Hot mix Asphalt Items, When there are 3 Asphalt plants within 5 miles of the project. Just more expensive mix designs to deal with
Inquiry submitted 10/14/2024
Response #1:(BI#6) - Your inquiry has been received and is being reviewed.
Response posted 10/15/2024
Response #2:(BI#6) - “Bid per current contract bid documents.”
Response posted 10/15/2024
Inquiry #7: There are several duplicated bid item's within the pavement delineation scope. Item # 152 and 158 are the same, 159 and 163 are the same, and 161 and 162 are the same. I suggest the removal of items 152, 159 and 161. Replace with 158, 163, and 162 (these item descriptions match the descriptions provided in "pavement delineation quantities").
Inquiry submitted 10/15/2024
Response #1:(BI#7) - Your inquiry has been received and is being reviewed.
Response posted 10/15/2024
Response #2:(BI#7) - Please direct your attention to Addenda No. 1 posted on October 25, 2024.
Response posted 10/25/2024
Inquiry #8: Where and how is the contractor paid to remove the concrete floor and stem walls at DS #3? Plans simply reference remove Arch Culvert with no mention of concrete.
Drainage System #7 shows removing 18" RCP and replacing with 24" RCP. Why is RCP only specified and not HDPE or other acceptable pipe material?
Inquiry submitted 10/17/2024
Response #1:(BI#8) - Your inquiry has been received and is being reviewed.
Response posted 10/17/2024
Response #2:(BI#8) - Please direct your attention to Addenda No. 1 posted on October 25, 2024.
Response posted 10/25/2024
Inquiry #9: None of the proposed structural sections indicate AC Leveling, however, a review of the cross sections indicates otherwise. Please clarify.
Please clarify the depth of cold plane ac areas on "ML" line outside of the Conforms, GPI, Driveways, and section shown on sheet 46 of the plans.
Inquiry submitted 10/18/2024
Response #1:(BI#9) - Your inquiry has been received and is being reviewed.
Response posted 10/18/2024
Response #2:(BI#9) - Please direct your attention to Addenda No. 1 posted on October 25, 2024.
Response posted 10/25/2024
Inquiry #10: Is this project located in an environment subject to freeze-thaw or de-icing salts?
Inquiry submitted 10/23/2024
Response #1:(BI#10) - Your inquiry has been received and is being reviewed.
Response posted 10/23/2024
Response #2:(BI#10) - Bid per current contract bid documents.
Response posted 10/25/2024
Response #3:(BI#10) - Bid per current contract bid documents.
Response posted 10/25/2024
Inquiry #11: Page 103 of the Special Provisions, under section 52-6.03B, references epoxy-coated rebar. However, I do not see anywhere in the bridge plans indicating that epoxy-coated rebar is required. Where is epoxy-coated rebar required, if at all?
Inquiry submitted 10/23/2024
Response #1:(BI#11) - Your inquiry has been received and is being reviewed.
Response posted 10/23/2024
Response #2:(BI#11) - Structure Response: Epoxy coated reinforcement not shown on sheets 154 through 174 of the contract plans.
Response posted 10/25/2024
Inquiry #12: For Bid item # 0057 EROSION CONTROL (TYPE 3) is requiring 24" wood stakes Showing on Erosion control Legend ECL-1 . Do these stakes need to be 24" wedge stakes ?
Inquiry submitted 10/24/2024
Response #1:(BI#12) - Your inquiry has been received and is being reviewed.
Response posted 10/24/2024
Response #2:(BI#12) - Please direct your attention to Standard Specification 21-2.02R, bid per current contract bid documents.
Response posted 10/25/2024
Inquiry #13: Special Provision 51-4.02D(2) indicates "Preassemble the precast girders and precast abutment components before shipping to the job site. You must 1) Verify geometry and field conditions, and 2) Assemble PC elements in configuration shown". The precast abutments cannot be pre-assembled safely in the configurations shown in the contract DWGs prior to getting shipment to the job site; at the job sites the precast abutments will slide over pre-driven pile which will act as a safety net in terms of a psuedo internal brace, and will additionally be braced externally. Those conditions will not exist in the precast yard in order to safely stack the pieces. Please confirm the intent for how and/or if the Precast Abutments need to be pre-assembled prior to delivery.
Inquiry submitted 11/05/2024
Response #1:(BI#13) - Your inquiry has been received and is being reviewed.
Response posted 11/06/2024
Response #2:(BI#13) - Bid per current contract bid documents.
Response posted 11/07/2024
Response #3:(BI#13) - Structure response: Please refer to the portion of the paragraph in section 51-4.02D(2) of the special provisions that states:
“Preassemble the precast girders and precast abutment components before shipping to the job site. You must:
1. Verify geometry and field connections”
Also refer to the construction sequence on sheet 156 of 174 of the contract plans. Bid per the current contract bid documents.
Response posted 11/07/2024
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.