Submit new inquiry for this projectInquiry #1: On plan sheet E-2, note 6 directs the contractor to install a new 3" conduit; however, on the plan sheet this run is shown as existing to an existing SP w/existing pull boxes. Can Caltrans confirm this run is new? Conduit run #1 is new; however, on the conductor schedule no conduit size is shown. According to the plan sheet there is an existing pull box shown in front of the new controller location with a note of BC. Can Caltrans confirm this is an existing box or a new box to be installed in existing conduit run?
On plan sheet E-3, the conduit/conductor size is unclear for the new conduit run between the pull boxes for pole A & F (SE corner)
On plan sheet E-4, the pole/equipment schedule shows pole F & G to be installed. It is assumed this is the luminaire on the NE and SW corner; however, there is no note specifying the actual locations for pole F & G. The conduit/conductor size is unclear for the new conduit run between the pull boxes for pole A & (F or G), B & E, C & (F or G).
On plan sheet E-5, note 1 references SES-Y, note 2 references SES-X and note 3 references SES-X. There is no SES-X or SES-Y detail provided.
On plan sheet E-2 (note 11), E-3 (note for controller assy), E-4 (note for controller assy) references plan sheet ED-2 for the installation details for the 2070 controller assembly/BBS. ED-2 is the detail provided for APS location.
Inquiry submitted 10/24/2024
Response #1:Your inquiry has been received and submitted for consideration.
Response posted 10/24/2024
Response #2:Please see the revised plan sheets in Addendum 2.
Response posted 10/31/2024
Inquiry #2: On plan sheet E-6 the scale of 1"=50' appears to be incorrect. For example, run 4 across Solano Avenue measures approx 210' per plan. However this run is realistically +/- 90'.
Inquiry submitted 10/25/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 10/25/2024
Response #2:See revised plan sheet E-6. The scale is 1"=20'.
Response posted 10/30/2024
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.