Submit new inquiry for this projectInquiry #1: The new addendum released for this project shows a total of 39 cameras and 334LS cabinets to be installed, but the plans show 37 total locations for install. Can Caltans please confirm if it is 39 location or 37 locations.
Inquiry submitted 11/07/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/07/2024
Response #2:The total cameras is 76. EQ-1 shows 22 cameras (E-2 to E-23). EQ-2 shows 54 cameras (E-24 to E-39). Note that E-39 has 39 cameras.
Response posted 11/08/2024
Inquiry #2: Do all location where new 334LS are to be installed, require the removal of existing foundation and installation of new foundation?
Inquiry submitted 11/07/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/07/2024
Response #2:Bid per contract documents.
Response posted 11/08/2024
Inquiry #3: Does Caltrans require all of the work for this project to be done at night?
Inquiry submitted 11/07/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/07/2024
Response #2:Follow the lane closure charts in the Special Provisions.
Response posted 11/08/2024
Inquiry #4: Does this project require cozeep, and if so, will Caltrans pay for this? Or is contractor to pay for this?
Inquiry submitted 11/07/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/07/2024
Response #2:Please reference Sec 12-4.02 of Standard Specifications.
Response posted 11/08/2024
Inquiry #5: Does this project require stamped traffic control plans by an P.E? Does this project require an encroachment permit for Caltans right of ways
Inquiry submitted 11/07/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/07/2024
Response #2:Follow the Traffic Handling Plan and Traffic Handling Details. All work is within Caltrans right of ways.
Response posted 11/08/2024
Inquiry #6: Could you please confirm that electrical sheet E-39 shows an additional 39 locations worth of work separate from the locations shown in pages E-2 through E-38?
Inquiry submitted 11/08/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/08/2024
Response #2:E-39 has an additional 39 construction locations which are different from E-2 through E-38.
Response posted 11/08/2024
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.