Submit new inquiry for this projectInquiry #1: I'm having trouble locating the roadway type for the LED Luminaires on E-1 to E-5. Can you confirm the roadway type per electrical sheet? Thanks!
Inquiry submitted 08/15/2023
Response #1:Submitted for consideration.
Response posted 08/15/2023
Response #2:Use Luminaire Type Roadway 12 on sheets E-1, E-2, E-4, and EQ-1.
Use Luminaire Type Roadway 11 on sheets E-7, E-8, and EQ-2.
Response posted 08/17/2023
Inquiry #2: Please review quantity of Rubberized Hot Mix Asphalt-BWC shown on Q-2 for the Park N Ride. Based on the cold plane quantity, the quantity for RHMA-BWC (1,331.55) appears to be greatly overstated for 0.1' thickness shown in the Construction Details C-6.
Inquiry submitted 09/26/2023
Response #1:Submitted for consideration.
Response posted 09/26/2023
Response #2:Please refer to Addendum #1 dated September 28, 2023.
Response posted 09/28/2023
Inquiry #3: BWC, primarily due to the specialized pavers and materials used, is intended to be placed on straight freeway or roadway lanes and is not intended for use on ramps that have drop lanes and narrow shoulders. Per guidelines reflected in section 39-2.05A(3)(d), methods for Placing and Compacting reflect that spray paver must pave the tapers, gores and drop lanes prior to the top layer of the through lane, due to the oil being spread directly in front of the head of material being placed. These methods are in conflict and contrary to methods in section 39-2.01C(7), which reflect that the through lane be paved first and the tapers, gores and drop lanes be paved to match. Paving the through lanes first is the best paving practice to meet smoothness requirements. Based on the mechanics and design of the specialized paver, the top layer can not be paved as specified and best paving practices can not be utilized making pavement smoothness requirements unachievable. Will pavement smoothness requirements be waived on the BWC top layer?
Inquiry submitted 09/27/2023
Response #1:Submitted for consideration.
Response posted 09/27/2023
Response #2:Pavement smoothness requirements will not be waived on the top BWC top layer. Please bid per Contract Documents.
Response posted 10/02/2023
Inquiry #4: K rail ends at Sta 1332+60, Pavement extends to 1336+00. This leaves an unprotected work area. Please Revise
Inquiry submitted 09/28/2023
Response #1:Submitted for consideration.
Response posted 09/28/2023
Response #2:K-Rail on Stage 3 (Sheet SC-18) covers the pavement work from station 1332+60 to station 1336+00.
Response posted 09/29/2023
Inquiry #5: Refer to section 87-1.03X and Bid Item 210. Please confirm we are to only locate existing electrical subsurface facilities and electrical underground conduit systems, as shown existing on the plans, that would interfere with the proposed subsurface electrical work using the methods described in this section to comply with the scope for this bid item. If not, please clarify.
Inquiry submitted 09/29/2023
Response #1:Submitted for consideration.
Response posted 09/29/2023
Response #2:Please bid per the contract documents including Special Provisions Sections 86-1.01C (1), 87-1.03X(1), 87-1.03X(2), & 87-1.03X(3).
Response posted 09/29/2023
Inquiry #6: Refer to sections 87-19.01C(2)(b)(i), 87-19.02B, 87-19.03B, and 87-19.03I(2) for Multi Duct Conduit Systems. Please clarify the prevailing requirements that are to be used for the construction of the work since they overlap.
Inquiry submitted 09/29/2023
Response #1:Submitted for consideration.
Response posted 09/29/2023
Response #2:Please bid per the current contract documents.
Response posted 09/29/2023
Inquiry #7: In stage 3, plan sheet SC-18, it shows K-Rail connecting and extending from K-Rail already in place at STA 1332+00 “A” line. Is this correct? All K-Rail from stage 2 disappears from the SC pages after stage 2 is complete in stage 2B. in stage 3, 805 NB “A” line k-Rail reappears on plan sheet SC-17. Is this correct?
Inquiry submitted 09/29/2023
Response #1:Submitted for consideration.
Response posted 09/29/2023
Response #2:The K-rail on Stage 3 on Sheet SC-18 is joined and extended from the end of K-Rail on Stage 2 at Station 1332+00.
Response posted 10/02/2023
Inquiry #8: is bid item 29, temp reinforced silt fence type 1 or type 2?
Inquiry submitted 09/29/2023
Response #1:Submitted for consideration.
Response posted 10/02/2023
Response #2:Temporary Silt Fence Type 2. Please bid per the current contract plans.
Response posted 10/02/2023
Inquiry #9: Regarding the soffits on this project, the last paragraph on the sheets 162-164 of the specs advises to match the fixture design and dimensions as to the work to replace existing fixtures and plates. Without us knowing what the existing unit is, it will be impossible to do. Are you able to get us information as to just what is existing? Please advise.
Inquiry submitted 10/02/2023
Response #1:Submitted for consideration.
Response posted 10/02/2023
Response #2:Please bid per the current contract plans.
Response posted 10/03/2023
Inquiry #10: will you push the bid date 2 weeks?
Inquiry submitted 10/03/2023
Response #1:Submitted for consideration.
Response posted 10/03/2023
Response #2:The bid opening date will not be postponed. Please bid per the current contract documents.
Response posted 10/03/2023
Inquiry #11: Please identify sprinkler types indicated with numbers 5 and 6 on irrigation drawing IP-3 with corresponding sprinkler types on sprinkler schedule.
Inquiry submitted 10/03/2023
Response #1:Submitted for consideration.
Response posted 10/04/2023
Response #2:Please bid per the current contract documents.
Response posted 10/04/2023
Inquiry #12: Refer to Irrigation Sheet #IP-3 where an existing 4" pipe across the Governor Drive bridge crossing was previously installed. Bid item #63 relates to installation of this 4" pipe. Advise if this is to be included for this contract or if this scope item is duplicated and will not be a part of the proposed improvements.
Inquiry submitted 10/03/2023
Response #1:Submitted for consideration.
Response posted 10/04/2023
Response #2:Please bid per the current contract documents.
Response posted 10/04/2023
Inquiry #13: The CA High Design Manual Section 850-34 dated December 30th, 2015 warns against specifying plastic pipe in areas with a potential for fire. This project lists Alternative Pipe Culvert in the Bid Schedule. Will Caltrans still allow for plastic pipe to be used on this project?
Inquiry submitted 10/05/2023
Response #1:Submitted for consideration.
Response posted 10/05/2023
Response #2:Please bid per the current contract documents.
Response posted 10/05/2023
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.