Inquiry #1: Plans for this project will not open after download. I believe the file may be damaged? Can you please re-upload the Plans PDF file? Thank you.
Inquiry submitted 01/09/2023

Response #1:The plan sheets are re-uploaded and available to download.
Response posted 01/09/2023




Inquiry #2: Based on our conversations with the manufacturer as it relates to the dampers, is it the intention to have all the dampers shipped back to NY for painting and then shipped back for re-installation since there isn't any local vendor that can perform this work?


Inquiry submitted 02/03/2023

Response #1:Refer to section 60-3.05G in the special provisions regarding the requirements for the painting of the dampers. Please bid per the current contract bid documents.
Response posted 02/07/2023




Inquiry #3: Based on our conversations with the manufacturer as it relates to the dampers, is it the intention to have all the dampers shipped back to NY for painting and then shipped back for re-installation since there isn't a local vendor that can perform this work?
Inquiry submitted 02/06/2023

Response #1:Refer to section 60-3.05G in the special provisions regarding the requirements for the painting of the dampers. Please bid per the current contract bid documents.
Response posted 02/07/2023




Inquiry #4: Are all 8 dampers allowed to be removed at once so they can be shipped to the enclosed shop for coating at the same time?
Inquiry submitted 02/08/2023

Response #1:Please bid per the current contract bid documents
Response posted 02/09/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.