Inquiry #1: Regarding the whopping 250 CY of Structure Backfill (Slurry Cement) shown @ Location 8 (Paularino)..... is this meant to be 250 CF, not CY?
Inquiry submitted 01/17/2023

Response #1:Pending
Response posted 01/17/2023


Response #2:Yes CF
Response posted 01/18/2023




Inquiry #2: I have two bid inquiries. First question. Does the Newport Beach Channel Br. 55-0035 have access under the east side of bridge for staging equipment?
Second question. Are there any height restrictions for placing access under Newport Beach Channel Br. 55-0035?

Inquiry submitted 01/24/2023

Response #1:Pending
Response posted 01/24/2023


Response #2:First question. Does the Newport Beach Channel Br. 55-0035 have access under the east side of bridge for staging equipment?
There is no access under the east side of the bridge for staging equipment. Caltrans diver boat was launched from the Newport beach Boat Launch Ramp located in the Newport Dunes Waterfront Resort and marina near Jamboree Blvd and Bay Drive, Newport Beach.

Second question. Are there any height restrictions for placing access under Newport Beach Channel Br. 55-0035?
There is no height restriction for placing access under (middle span where the steel girder needs to be painted).

Response posted 01/24/2023




Inquiry #3: Can as-built plans for bridge 55-0899 be provided?
Inquiry submitted 02/06/2023

Response #1:Pending
Response posted 02/06/2023


Response #2:Yes. The as-built plans for bridge 55-0899 can be provided.
Please submit a request to the Office of Structure Maintenance and Investigations electronic mailbox address BIRIS@dot.ca.gov

Response posted 02/06/2023


Response #3:Structure Response: Refer to the 8th paragraph in section 2-1.06B, “Supplemental Project Information, “ of the Standard Specifications
Response posted 02/06/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.