Contractor: A. Teichert & Sons, Inc. dba Teichert Construction Contact: Jay Maniyar
Address: 400 Sunrise Avenue, Suite 300 Roseville, CA 95661
Phone: 916-757-6400 Fax: 916-757-6499 Email: estimating@teichert.com
Services needed: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: all materials, labor and equipment for CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM RESET, ADJUST ROADWAY ITEMS CLEARING & GRUBBING DUST PALLIATIVE ROADWAY EXCAVATION IMPORTED BORROW HYDROSEEDING EROSION CONTROL TEMPORARY EROSION CONTROL AGGREGATE BASE ASPHALT CONCRETE PAVING ASPHALT (ASPHALT CONCRETE) PLACE ASPHALT CONCRETE DIKE & MISC PORTLAND CEMENT & CONCRETE PAVEMENT CONCRETE STRUCTURE MINOR CONCRETE STRUCTURE REINFORCING STEEL ROADSIDE SIGN REINFORCED CONCRETE PIPE FILTER FABRIC PERMEABLE MATERIAL ROCK SLOPE PROTECTION MISC IRON & STEEL FRAME, COVER & GRATE SAW CUTTING FENCING TEMPORARY FENCING METAL BEAM GUARD RAILING METAL RAILING CONCRETE BARRIER METAL BEAM BARRIER THERMOPLASTIC TRAFFIC STRIPING & MARKING PAINTED TRAFFIC STRIPING & MARKING PAVEMENT MARKING SIGNAL & LIGHTING MESSAGE SIGNS, LIGHTING & SIGN ILLUMINATION SPEED MONITORING STATION LAND SURVEYING LANDSCAPING CONTRACTOR CONSTRUCTION EQUIPMENT RENTAL HEAVY EQUIPMENT RENTAL SAFETY EQUIPMENT SUPPLIER ASPHALT SUPPLIER(BULK ITEM) CONCRETE & CEMENT SUPPLIER(BULK ITEM) REINFORCING BAR SECTION SUPPLIER STEEL SUPPLIER PIPE SUPPLIER DRAINAGE SYSTEMS SUPPLIER STORM WATER SYSTEMS SUPPLIER ENVIRONMENTAL ENGINEER MATERIAL TESTING SERVICES TRAFFIC MANAGEMENT OPERATIONS LEAD COMPLIANCE SWPPP PLANNING BOTTOM DUMP TRUCK TRANSFER DUMP TRUCK SUPER 10 DUMP TRUCK FLAT BED TRUCKING WATER TRUCK END DUMP TRUCK ASPHALT OIL TANKERS STREET SWEEPING TRUCK TRUCK RENTAL TRUCKER BROKER and TRUCKER.
Requirements: Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. Plans and specifications are available from the municipality listed above and the Teichert’s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DBE's available from: *** All Subcontractor Quotes must have the Department of Industrial Relations # to be ACCEPTED.
Date posted: 10/17/2024
Contractor: Serafix Engineering Contractors, Inc Contact: Estimating Dept
Address: 7 Crow Canyon Court, Suite 250 San Ramon, CA 94583
Phone: 925-552-8253 Fax: 925-552-8254 Email: estimating@secontractors.com
Services needed: Serafix Engineering Contractors, Inc. (SEC) is soliciting quotes from certified DBE Subcontractors and Suppliers for the following categories of work (including but not limited to): LEAD COMPLIANCE PLAN, DRD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS, CAS, TRAFFIC CONTROL SYSTEM, CHANNELIZER (SURFACE MOUNTED), TEMP BARRIER SYSTEM, PCMS, TEMP CRASH CUSHION TL-3, TEMP RADAR SPEED FEEDBACK SIGN SYSTEM, SWPPP, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMP EROSION CONTROL), TEMP HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP LARGE SEDIMENT BARRIER, TEMP CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, TEMP CREEK DIVERSION SYSTEMS, TEMP HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING, STRUCTURE BACKFILL (SLURRY CEMENT), SLOPE REPAIR, ROADSIDE CLEARING, PLANT (GROUP H), PLANT ESTABLISHMENT WORK, MOVE-IN/MOVE-OUT (EROSION CONTROL), ROLLED EROSION CONTROL PRODUCT (NETTING), FIBER ROLLS, HYDROSEED, COMPOST, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE E), TACK COAT, STRUCTURAL CONCRETE, HEADWALL, MINOR CONCRETE (MINOR STRUCTURE), BAR REINFORCING STEEL, RAPID SETTING CONCRETE (PATCH), REPAIR SPALLED SURFACE AREA, 18" REINFORCED CONCRETE PIPE, 24" REINFORCED CONCRETE PIPE TRENCHLESS INSTALLATION METHOD, 24" REINFORCED CONCRETE PIPE, 30" REINFORCED CONCRETE PIPE, 36" REINFORCED CONCRETE PIPE, 36" REINFORCED CONCRETE PIPE TRENCHLESS INSTALLATION METHOD, 24" STEEL FLARED END SECTION, 24" CONCRETE FLARED END SECTION, 30" CONCRETE FLARED END SECTION, 36" CONCRETE FLARED END SECTION, 48" PRECAST CONCRETE PIPE MANHOLE (EA), ABANDON CULVERT, REMOVE CULVERT, REMOVE DOWNDRAIN, REMOVE INLET, REMOVE HEADWALL, REMOVE MANHOLE, REMOVE FLARED END SECTION (EA), SAND BACKFILL, 30" CURED-IN-PLACE PIPELINER, ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B), ROCK SLOPE PROTECTION (GRAVEL FILTER), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MISC. IRON AND STEEL, FENCE (TYPE BW, WOOD POST), REMOVE FENCE (TYPE BW), GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (INERT MATERIAL), END CAP (TYPE TC), END ANCHOR ASSEMBLY (TYPE SFT-M), CONCRETE BARRIER (TYPE 60MC), CONCRETE BARRIER TRANSITION, REMOVE GUARDRAIL, REMOVE CONCRETE BARRIER, 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 6" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT). Work will be broken down to accommodate subcontractor quotes. PLEASE SUBMIT A COPY OF YOUR CURRENT DBE CERTIFICATION WITH YOUR PROPOSAL.
Requirements: SEC adheres to the requirement for Affirmative Action to ensure Equal Employment Opportunity according to Executive Order 11246, and requires proof from all subcontractors that they are in accordance. 100% Performance and Payment Bonds with a surety company thereof, subject to the approval of SEC, will be required of all subcontractors. SEC will pay bond premium up to 1.5%. Please contact SEC for assistance with bonding, insurance, or lines of credit. All subcontractors are expected to sign a standard contract, which can be viewed at our location. Any bid provided by a Subcontractor constitutes an acceptance on each and every term of the general contractor’s standard contract. Subcontractor will be deemed to understand and accept those terms by providing a bid. Any attempt by a Subcontractor to revise or limit those terms will be null and void and not recognized by SEC. Prevailing wages must be met. Subcontractor must possess current insurance and workers compensation coverage meeting SEC’s insurance requirements. Insurance waiver of subrogation is also required. SEC is a Union Contractor. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.
Date posted: 10/17/2024
Contractor: GRANITE CONSTRUCTION COMPANY Contact: Amir Mutwakil or Patricia Arnett
Address: 580 West Beach Street Watsonville, CA 95076
Phone: 831-763-5516 Fax: 408-327-7090 Email: patricia.arnett@gcinc.com
Services needed: Granite Construction Company (Granite) is requesting quotes on this project from all qualified subcontractors and suppliers including certified DBE firms for any portion of the work, but specifically the following suggested items: Lead compliance plan; SWPP Plan; Stormwater sampling/analysis & reporting; Water quality sampling/analysis and monitoring reports; Construction area signs; Traffic control; Temporary barrier system; PCMS; Temporary crash cushions & radar speed feedback signs; Erosion control including temporary measures, fiber rolls, gravel bags, sediment barrier, rolled erosion control netting, fiber rolls, hydroseeding & compost; Temporary high-visibility fence; Temporary creek diversion system; Clearing & grubbing; Roadside clearing/tree removals; Street sweeping; Slurry cement structure backfill; All planting, including plant establishment period; HMA asphalt oil supply and delivery; HMA dike; Tack coat; Concrete structure items; Rapid-setting concrete patch; Pipe & drainage materials; Sawcutting for removals; Cured-in-place pipeliner; Rock slope protection; RSP gravel filter; RSP fabric; Misc. iron & steel; All fencing items; All guard rail items, including removals; Concrete barrier & barrier transition items; Striping & marking; Rumble Strip; Hauling of construction materials and Hauling of export from the site. Please contact our office if there are additional items, or portions of items, your firm is interested in bidding. Granite Construction will break down items of work to facilitate DBE participation on this project. All non-DBE subcontractors are also encouraged to utilize DBE suppliers for their work, where possible.
Requirements: Granite Construction Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite Construction will assist with bonding costs for subcontractors. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors# Subcontractors must possess a current contractor’s license and current DIR number. All quotes are subject to the terms of Granite Construction Company’s applicable standard form agreement which is available through the following link: https://www.graniteconstruction.com/ca-resources/quote-solicitation
Date posted: 10/22/2024
Contractor: Granite Rock Company Contact: Randy Bonino
Address: 5225 Hellyer Avenue, Suite 220 San Jose, CA 95138
Phone: 408-574-1400 Fax: 408-365-9548 Email: estimating@graniterock.com
Services needed: Certified DBE firms are encouraged to provide a quote to Graniterock for all items of work listed on the bid list, particularly these: Lead Compliance Plan, Construction Area Signs, Traffic Control, Temporary Barrier System, PCMS, Temporary Radar Speed Feedback Sign, SWPPP, Erosion Control, Street Sweeping, Clearing & Grubbing, Slope Repair, Hydroseed, AC Dike, Tack Coat, Minor Concrete, Rebar, Rapid Set Concrete Patch, Reinforced Concrete Pipe, Bore and Jack RCP Pipe, Cured In Place Pipeliner, Adjust Utilities, Rock Slope Protection, Misc. Iron & Steel, Fencing, Pavement Marker, Midwest Guardrail System, Vegetation Control, Rumble Strip, Concrete Barrier, Remove Concrete Barrier, Striping, and Trucking
Requirements: Granite Rock Company 'Graniterock' is signatory to Operating Engineers, Laborers, Teamsters, Carpenters and Cement Masons unions. 100% performance and payment bonds will be required from a qualified surety company for the full amount of the subcontract price. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Plans and specifications can be downloaded on-line with Caltrans, or at our offices, but please contact our estimating office for assistance. Subcontractors must possess a current contractor's license, DIR number, insurance and worker's compensation coverage. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work category code(s) that apply to the scope of work they are quoting. Items of work can be broken down to facilitate DBE participation. Graniterock intends to work cooperatively with all qualified firms seeking work on this project. Granite Rock Company is an equal opportunity employer.
Date posted: 10/25/2024
Contractor: Cal Valley Construction, Inc. Contact: Bobby Watkins
Address: 5125 North Gates Avenue, Suite 102 Fresno, Ca 93722
Phone: 559-274-0300 Fax: 559-274-0311 Email: estimating@calvalleyconstruction.com
Services needed: Cal Valley Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Provide Aggregates, Provide HMA Binder, Provide HMA, Provide RSP, Prepare Lead Compliance Plan, Prepare WPCP, Prepare SWPPP, Construction Area Signs, Temporary Barrier, Temporary Crash Cushion, Erosion Control, Temporary Hydraulic Mulch, Landscaping, Hydroseeding, Structural Concrete, Minor Concrete, RCP, Bore & Jack, Steel & Concrete Flared Ends, Demolition, Cured-In-Place-Pipeliner, Fencing, Steel Post Guardrailing, Concrete Barrier, Striping & Markers, Rumble Strip, Sawcut & Trucking of All Types Quotations will be broken down into comparable packages as reasonably necessary. Cal Valley will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed. Plans and specifications are available at your local Builders Exchange and/ or at the Primary City of County websites. They are also available for viewing at our office located at 5125 N. Gates Ave., #102, Fresno CA by appointment.
Requirements: Cal Valley Construction is signatory to Operating Engineers and Laborers unions. This will be a prevailing wage job. 100% performance and payment bonds might be required for the full amount of subcontract price. Subcontractors must possess a current contractor’s license, DIR registration number, insurance and worker’s compensation coverage meeting Cal Valley’s requirements and will be required to sign the standard Cal Valley Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Cal Valley intends to work cooperatively with all qualified firms seeking work on this project. If you need services and or assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies, for this project call the Estimator, or contact your local Small Business Development Center Network (http://californiasbdc.org), Minority Business Development Center (www.mbda.gov) or contact the California Southwest Transportation Resource Center (https://www.transportation.gov/osdbu/sw-region-sbtrc). Please call or email if any assistance is needed. Cal Valley Construction Is An Equal Opportunity Business Employer
Date posted: 11/01/2024