Inquiry #1: The specials call for 4 each C48 144"x90", please confirm these will be 132"x 78" per Caltrans website.
The size 144"x90" has been removed and replaced 132"x78" and this sign will not require laminated box beams.

Inquiry submitted 03/05/2020

Response #1:
(#1)-Your inquiry has been received and is being reviewed.
Response posted 03/05/2020


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Monday, March 9, 2020. Please bid per the current contract documents.

Response posted 03/09/2020




Inquiry #2: Our Supplier cannot find information with regard to pipe type / size for the OH sign structures, also there is some confusion as to whether their are 3 or 4 structures in this contract
Inquiry submitted 03/17/2020

Response #1:
(#2)-Your inquiry has been received.? However, please be aware due to the short time frame between when this inquiry was received and the bid opening, there may not be time to provide a response.? If no additional response is posted please bid per the current contract documents.
Response posted 03/17/2020




Inquiry #3: Our Supplier cannot find information with regard to pipe type / size for the OH sign structures, also there is some confusion as to whether their are 3 or 4 structures in this contract
Inquiry submitted 03/18/2020

Response #1:(#3)-Your inquiry has been received. However, please be aware due to the short time frame between when this inquiry was received and the bid opening, there may not be time to provide a response. If no additional response is posted please bid per the current contract documents.
Response posted 03/18/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.