Inquiry #1: What is the extent of the cold plane and overlay? There are notes at each end of the project identifying the beginning and the end but nothing in between such as at the bridge gap. I suspect that they may want to cold plane and overlay this gap. The quantities for cold plane only cover the distance between the actual widening, not anything beyond. Also at 1st glance the OFGA for the existing overlay doesn’t seem to be included in the summary of quantity table, the math seems to indicate it is only covering the widening portion.
Inquiry submitted 10/06/2021

Response #1:(BI#1)-Refer to addendum #1, dated 10/20/21.

Response posted 10/06/2021




Inquiry #2: Is SEG included in structural section 3. SEG is shown in the summary of quantity tables at all locations but only in structural section 2 of the typical cross sections.
Inquiry submitted 10/06/2021

Response #1:(BI#2)-Refer to addendum #1, dated 10/20/21.

Response posted 10/06/2021




Inquiry #3: Is this job to be winter work, or spring work? What is the anticipated start date? We saw a BidGrid Bid Alert stating the estimated start date is 12/1/21. Please confirm.
Inquiry submitted 10/08/2021

Response #1:(BI#3)-This is not a winter work. The work window for this project is 05/01/2022 to 10/01/2022 due to GSS habitat.

Response posted 10/08/2021




Inquiry #4: This project requires a Storm Water Pollution Prevention Plan (SWPPP). Bid List Item No. 16 RAIN EVENT ACTION REPORT, calls for 2 EA, Bid List Item No. 17 STORM WATER SAMPLING AND ANALYSIS DAY, calls for 3 EA. That only estimates 5 Stormwater Inspections for the project. SWPPPs require a minimum of one Stormwater inspeciton per week. There are 80 working Days estimated for this project (16 weeks). Shouldn't there be at least 16 Storm Water Inspections on the List of Bid Items?
Inquiry submitted 10/15/2021

Response #1:(BI#4)-Bid per current contract documents.

Response posted 10/18/2021




Inquiry #5: Sheet C-6 shows the DPPIA area. The Type 1 and Type 2 erosion control are covered in their own Items. Where is the excavation and grading of this infiltration area covered? This would cause an overrun to the roadway excavation item if to be included there.
Inquiry submitted 10/22/2021

Response #1:(BI#5)-The excavation and grading of the infiltration area is covered under item 190101 Roadway Excavation. Bid per current bid documents.

Response posted 10/22/2021




Inquiry #6: What is the cause of the RSP excavation of 2,874cy shown on the earthwork quantity table on sheet Q-1, to be “unsuitable”?
Inquiry submitted 10/22/2021

Response #1:(BI#6)-This area is close to wetlands, and this material is expected to have organic matter that makes it unsuitable for construction of embankment on top of it. Bid per current bid documents.

Response posted 10/22/2021


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.