Inquiry #1: Per Plan Sheet 3 of 7, PPD-1 Note # 1: "FROM POSTMILE R6.6 TO R11.78, THE EXISTING STRIPING FALLS ON CENTERLINE GROUND-IN RUMBLE STRIP (NOT SHOWN)." However, per plan sheet 5 of 7, PDQ-2 the Yellow Thermoplastic Hazardous Waste removal is within the rumble strips and per Caltrans specifications the contractor shall not remove more than 1/8" of the existing asphalt, but the ground-in rumbles are greater than 1/8". How does Caltrans expect the contractor to remove the Yellow Thermoplastic Hazardous Waste located on the rumble strip from postmile R6.6 TO R11.78 without damaging both the rumble strip or the existing asphalt?
Inquiry submitted 02/06/2019

Response #1:
(#1)-Your inquiry has been received and is being reviewed.
Response posted 02/07/2019


Response #2:
Your attention is directed to note 2 on sheet 5 of 7, PDQ-2.
Response posted 02/12/2019




Inquiry #2: Per plan sheet PDQ-1, there are quantities listed for striping details 25A, 8, 9, 9A, 36 & 36A, which would indicate that there will be striping performed on the on and off ramps. Note #4 supports striping to include ramps. Where do the striping limits end? Are we to figure stopping at the end of the gore, or going all the way down the ramps to the stop bar? Please clarify.
Inquiry submitted 03/01/2019

Response #1:
(#2)-Your inquiry has been received and is being reviewed.
Response posted 03/01/2019


Response #2:
The striping on the ramps is all the way to the stop bar.
Response posted 03/04/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.