Inquiry #1: Due to the recent directive issued by 6 bay are counties to shelter in place Through April 7th
we ask Caltrans to push the bid date at least 3 weeks.

Inquiry submitted 03/16/2020

Response #1:
(#1)-Your inquiry has been received and is being reviewed.
Response posted 03/16/2020


Response #2:
The Department is proceeding with the bid openings scheduled for this week and will evaluate future bid openings on a weekly basis.

Please check the notification message at the top of the Contractor's Corner website located at http://ppmoe.dot.ca.gov/des/oe/contractor-info.html for message updates regarding bid openings.

Response posted 03/25/2020




Inquiry #2: In the project plans ECL-1, the Fiber Rolls indicate that Type 1 and Type 2 installation is to be used. There is nothing on the plans indicating how many feet of each type of installation. Can you please clarify.
Inquiry submitted 03/18/2020

Response #1:
(#2)-Your inquiry has been received and is being reviewed.
Response posted 03/18/2020


Response #2:
On ECL-1 your attention is directed to the "EROSION CONTROL TYPE 1" and "EROSION CONTROL TYPE 2" sequence charts shown on ECL-1. In reference to "EC TYPE 1" AND "EC TYPE 2" written in FIBER ROLLS SEQUENCE CHART. "EC TYPE 1" refers to "EROSION CONTROL TYPE 1" and "EC TYPE 2" refers to "EROSION CONTROL TYPE 2". This is not to be confused with "FIBER ROLL" Installation "TYPE 1" or "TYPE 2". Fiber roll installation Type is not specified, therefore either type will be acceptable for this project.
Response posted 03/19/2020




Inquiry #3: PLAN SHEET 19/89, U-2, UTILITY PLAN:
Positive Location #5 is given as Left of STA.A1 110+85.53. However, it is plotted at @ A1 112+30 Lt.
What is the correct location of this pothole?

Inquiry submitted 03/24/2020

Response #1:
(#3)-Your inquiry has been received and is being reviewed.
Response posted 03/24/2020


Response #2:
The correct STA and offset is 36.8' Lt "A1" Line Sta 112+34.4.
Response posted 03/30/2020




Inquiry #4: 1. Where is spec. info for Type 61A-5-100 and 61A-5-129?
2. Where is spec. info for SV-1-TB?? I see SV-2-TB.

Inquiry submitted 03/25/2020

Response #1:
(#4)-1. Where is spec. info for Type 61A-5-100 (STD Plan ES covers this) and 61A-5-129?(This is an existing pole)

2. Where is spec. info for SV-1-TB?? I see SV-2-TB. (STD Plan 4A through 4E cover all the signal heads and Mountings)

Please bid per the current contract documents.
Response posted 03/30/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.