Inquiry #1: The specifications for this contract only go to Section 12-Temporary Traffic Control. It is missing the remaining specifications.
Inquiry submitted 09/23/2022

Response #1:Submitted for consideration.
Response posted 09/23/2022


Response #2:Please see Addendum no. 1 for missing specifications.
Response posted 10/20/2022




Inquiry #2: Missing SDS Detail for S123, location 224 BM
Inquiry submitted 09/25/2022

Response #1:Submitted for consideration.
Response posted 09/26/2022


Response #2:Refer to Addendum 4, dated October 20, 2022, for revised plan Sheet 259, Special Design Structures (SDS-8). See Detail 26.
Response posted 10/20/2022




Inquiry #3: Wood Post Size and Length as shown on all SQ's doesn't match with Roadside Sign-One Post in the following occurances:
S7-3
S7-10
S9-25
S12-1
S12-2
S18-23
S25-7
S26-20
S29-30
S70-42

Inquiry submitted 09/25/2022

Response #1:Submitted for consideration.
Response posted 09/26/2022


Response #2:Please see revised SQ plans in Addendum 4.
Response posted 10/20/2022




Inquiry #4: Can we bid/use Square 2-1/2" x 12 gauge post instead of wood post?

Inquiry submitted 10/03/2022

Response #1:Submitted for consideration.
Response posted 10/03/2022


Response #2:Please bid for wood posts, per current contract documents. When awarded, a Request for Information (RFI) can be sent to the Resident Engineer to review, concerning substituting RSP RS5 and RSP RS6 for wood post.
Response posted 10/20/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.