Bidder Inquiries

Caltrans Bidding Connect Account:

Sign In (Sign in is required to access Project Plans)

Create Account (Click here to create a Caltrans Bidding Connect Account)


Viewing inquiries for 04-151484

Submit new inquiry for this project


Inquiry #1: The MVP's are identified on the layout sheets and the note states, "See Standard Plan". Please provide the Standard Plan with the structural section.
Inquiry submitted 11/19/2018

Response #1:Submitted for consideration.
Response posted 11/26/2018


Response #2:See plan sheet No. 251 (RSP H9).
Response posted 11/26/2018




Inquiry #2: The MVP's are identified on the layout sheets and the note states, "See Standard Plan". Please provide the Standard Plan with the structural section.

Sheet 251 gives a typical cross section, but does not give the thickness of HMA or Aggregate Base. Please provide.

Inquiry submitted 11/26/2018

Response #1:Submitted for consideration.
Response posted 11/26/2018


Response #2:There are five new MVP's for this project. All MVP's have pavement structure No.1 as shown in the layout plans (sheets L-3 through L-7). They are part of the pavement widening.

Sheet X-1 shows Pavement Structure No.1 as:
0.10' RHMA-G
0.50’ HMA (TYPE A)
0.25’ ATPB
1.55' Cl 2 AB

Response posted 11/27/2018




Inquiry #3: Drainage systems 2d and 5d (G2 Manhole) do not have a method of payment. They are not included in the Structural Concrete, Drainage Inlet quantity. How will these two structures be paid?
Inquiry submitted 01/08/2019

Response #1:Submitted for consideration.
Response posted 01/10/2019




Inquiry #4: Drainage systems 2d and 5d (G2 Manhole) do not have a method of payment. They are not included in the Structural Concrete, Drainage Inlet quantity. How will these two structures be paid?
Inquiry submitted 01/08/2019

Response #1:Same question as above.
Response posted 01/10/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.