Inquiry #1: Good morning,

Is there a prebid (voluntary or mandatory) meeting for this project?

Ester

Inquiry submitted 10/14/2019

Response #1:There is no pre-bid meeting for this project (04-2G6604).
Response posted 10/14/2019




Inquiry #2: Quantity Sheet Q-1 accounts for removing 730 lf of curb and installing 20 cy of A1-6 curb from station TR 508+20 to 515+50. This work does not show on the layout or construction detail drawings. Could you confirm this work is included in the scope of the project and if so could you furnish a plan and details of the work?
Inquiry submitted 10/17/2019

Response #1:Submitted for consideration.
Response posted 10/17/2019


Response #2:Please see "Reconstruct sidewalk" from STA 508+20 to 515+50 and refer to Layout Sheets L-5, L-6, L-7 and L-8.
Response posted 10/18/2019




Inquiry #3: With all the fires going on, and with power being shut down in many different areas, will the project be opened on a different date or on 10-29-19. ?
Inquiry submitted 10/27/2019

Response #1:Unless if an addendum is issued, the bid will open as scheduled.
Response posted 10/28/2019


Response #2:See Addendum 2.
Response posted 10/30/2019




Inquiry #4: We’re without power due to the PSPS, will the bid date be extended?
Inquiry submitted 10/28/2019

Response #1:Unless if an addendum is issued, bid opens as scheduled.
Response posted 10/28/2019




Inquiry #5: The response to inquire #2 refers back to pages L-5, L-6, L-7 and L-8. These pages do not show the A-1 6 curb. Could you please show the position in a construction detail as well as the stationing? It seems it will be adjacent to the sidewalk, but the plans do not show any detail.
Inquiry submitted 11/06/2019

Response #1:Please refer to Q-1 Summary of Quantities to reflect the Type A1-6 Curb type. Please refer to Standard Plans A87A for details.
Response posted 11/08/2019




Inquiry #6: I would like clarification on the scope of the pedestrian detours required. Specially on the work on Tunnel Road on the work shown on L-5 through L-8. While replacing this sidewalk there is no way to detour the pedestrians unless it is done through the street behind some sort of protection like K Rail. I do not see a K rail Item for this job and the difference in cost could be substantial.
Please clearly specify what would be required as the specs open up a possible problem / cost increase / change order.
It is not fair to leave it as a reference to the specs.

Inquiry submitted 11/06/2019

Response #1:Submitted for consideration.
Response posted 11/07/2019


Response #2:The contractor can direct the pedestrians on side walk of the NB Rte 13.

Please see the Lane Closure chart K2 in the SSP and also the traffic control in Standard plans.

Response posted 11/08/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.