Inquiry #1: No existing ground information can be located in the plans.
Please provide existing ground information.

Inquiry submitted 11/16/2022

Response #1:Submitted for consideration.
Response posted 11/16/2022


Response #2:Refer to Standard Specification section 2-1.06B for Cross Sections availability.
Response posted 12/02/2022




Inquiry #2: Bid item 088 SECURITY METAL FENCE: Plan sheet C-4 shows 6' high fence with curved pickets that could be a hazard. Ameristar makes this fence in 7' and 8'. Caltrans typical for several past projects for this type of fence is 8' high. The post type and depth is correct for both 7' and 8' heights. Please advise correct fence height required.
Inquiry submitted 11/30/2022

Response #1:Submitted for consideration.
Response posted 12/01/2022


Response #2:The 6' high fence is required by City of Livermore to meet the City's fence height limits.
Response posted 12/02/2022




Inquiry #3: Plan sheet A1-27 keynote 12 3553.7 & detail 2 calls for “Metal Adjustable Shelves” please provide what type of shelving is required along with a specification for the required metal shelving.
Inquiry submitted 11/30/2022

Response #1:Submitted for consideration.
Response posted 12/01/2022


Response #2:Please refer to Addendum No. 1 dated January 5, 2023. Section 99-123553.13 - METAL LABORATORY CASEWORK, item 2.10A has been replaced.
Response posted 01/05/2023




Inquiry #4: Reference specification 99-263100 – Photovoltaic Collectors. The following items are listed as sole source.

2.1(A) - SunPower E-Series Commercial Solar Panels E20-327-COM
2.8(A) - Inverter Type: Helix Roof Power Station plug-and-play SMA Tripower Inverter
2.10(A) - Roof Mount: Helix Roof Mounting System

Please advise if an alternate product will be acceptable.

Inquiry submitted 12/05/2022

Response #1:Submitted for consideration.
Response posted 12/05/2022


Response #2:Reference specification 99-263100 - Photovoltaic Collectors. The following items are listed as sole source.

2.1(A) - SunPower E-Series Commercial Solar Panels E20-327-COM
2.8(A) - Inverter Type: Helix Roof Power Station plug-and-play SMA Tripower Inverter
2.10(A) - Roof Mount: Helix Roof Mounting System
Response posted 12/12/2022


Response #3:Please refer to section 6-1.05 of the Standard Specifications for alternate products.
Response posted 12/15/2022




Inquiry #5: Bid item 088 SECURITY METAL FENCE: Plan sheet C-4 6' high fence with curved pickets is considered a hazard at that height by the manufacturer (similar to building codes regarding barbwire). Minimum height for outward pointing picket fence is 7'.
Can Ameristar "Classic" that has pointed vertical pickets be used in lieu of pickets pointing out for this project?

Inquiry submitted 12/05/2022

Response #1:Submitted for consideration.
Response posted 12/05/2022


Response #2:The City of Livermore standard is for a six foot fence. Concerning the pickets, please bid per current contract documents.
Response posted 01/05/2023




Inquiry #6: Reference the notice to bidders and special provisions book. The first page of the standard plan list states “The applicable revised standard plans (RSPs) listed below are included in the project plans.” The project plans do not contain the revised standard plans.

Furthermore, reference project plans, sheet 1 of 267. There’s a statement “The standard plans list applicable to this contract is included in the notice to bidders and special provisions book”. The notice to bidders and special provisions book do not contain the revised standard plans.

Please provide revised standard plans that are applicable to this project.

Inquiry submitted 12/06/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:The RSPs are included in the project plans. See plan sheet pages 52 to 66.
Response posted 01/05/2023




Inquiry #7:
Reference sheet EE-0.20. Keynote #18 calls out for a Dual Cord Fast Charger (DCFC). There is no specification for a DCFC, please provide specification.

Specification 262746 is for a Electric Vehicle Service Equipment – Level 2, however, this specification only applies to charging levels at 10kW per vehicle.

Inquiry submitted 12/07/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:Please refer to Addendum No. 1 dated January 5, 2023. Section 99-262746 - ELECTRIC VEHICLE SERVICE EQUIPMENT has been replaced.
Response posted 01/05/2023




Inquiry #8: Can you tell me where I can locate the guarantee period in the specifications?
Inquiry submitted 12/09/2022

Response #1:Submitted for consideration.
Response posted 12/12/2022


Response #2:Please see the 2018 Standard Specifications, Section 5-1.47 GUARANTEE.
Response posted 12/24/2022




Inquiry #9: FYI-Caltrans to-All Bidders- How do I register for Mandatory Pre-Bid Meeting?
Inquiry submitted 12/13/2022

Response #1:Please do not use the Bidder Inquiry platform for Mandatory Pre-Bid Meeting registration; it is for inquiries related to bidding on the project contract. Register in advance of the Mandatory Pre-Bid Meeting, and no later than 1 hour before the meeting time, by sending an email with bidder information to "D4.Construction.Duty.Senior@dot.ca.gov" Please include the project number & "Mandatory Pre-Bid Meeting", within the subject of the email.
Response posted 12/13/2022


Response #2:FYI-Contract 2K9504, Mandatory Pre-Bid Meeting is Wednesday, December 14, at 10 am.
Response posted 12/13/2022




Inquiry #10: 083323 Overhead Coiling Doors
Please confirm if coiling doors are fire rated. Specs call of a fire rating, no mention on
plans. Fire rated doors can’t have a R factor of 7.7.
Please confirm if coiling doors are to be insulated.
Please confirm if 500,000 spring cycles are required. 083323 2.2C calls for 500,000.
083323 2.2 F: hot dip galvanized can’t be powder coated but zinc enriched can be
powder coated. Please confirm.

Inquiry submitted 12/13/2022

Response #1:Submitted for consideration.
Response posted 12/15/2022


Response #2:Q: Please confirm if coiling doors are to be insulated.
A: Coiling doors are to be insulated per specifications section 99-083323 - OVERHEAD COILING DOORS, Part 2.2 C.

Q: Please confirm if 500,000 spring cycles are required. 083323 2.2C calls for 500,000.
A: 500,000 spring cycles are required per specifications section 99-083323 - OVERHEAD COILING DOORS, Part 2.2 B.

Q; 083323 2.2 F: hot dip galvanized can’t be powder coated but zinc enriched can be powder coated. Please confirm.
A: Please refer to Addendum No. 1 dated January 5, 2023. Section 99-083323 - OVERHEAD COILING DOORS, Part 2.2 F has been replaced.

Response posted 01/05/2023


Response #3:Q: 083323 Overhead Coiling Doors. Please confirm if coiling doors are fire rated. Specs call of a fire rating, no mention on plans. Fire rated doors can’t have a R factor of 7.7.
A: Coiling doors are not fire rated as per plans.
Response posted 01/09/2023




Inquiry #11: Is there a DVBE and/or SBE requirement?
Inquiry submitted 12/15/2022

Response #1:Submitted for consideration.
Response posted 12/15/2022


Response #2:No, per the Notice to Bidders in the specifications,
The Department establishes no DVBE Contract goal but encourages bidders to obtain DVBE
participation.

However, there is a DVBE participation incentive up to $250K. Per 2018 Standard Special Provisions, Section2-1.15C(3) Incentive Evaluation,
The Department applies the small business and non–small business preference during bid verification and proceeds with the evaluation specified below for the DVBE incentive. The DVBE incentive is a reduction, for bid comparison only, in the submitted total bid by the lesser of the following amounts:
1. Percentage of the DVBE achievement rounded to 2 decimal places of the verified total bid of the low bidder
2. 5 percent of the verified total bid of the low bidder
3. $250,000

Response posted 12/15/2022




Inquiry #12: Can the list of the prime bidders in attendance on today’s mandatory prebid be posted?
Inquiry submitted 12/15/2022

Response #1:Submitted for consideration.
Response posted 12/15/2022


Response #2:The following contractors attended Mandatory Virtual Prebid Meeting 04-2K9504:
THOMPSON BUILDERS -Prime
S KWOK ENGINEERS, INC. -Sub
MARINSHIP -Sub
WALSH CONSTRUCTION -Prime
CREEKSIDE INC
EWASTE DISPOSAL, INC
PERRY ELECTRIC INC. -Sub
F&H CONSTRUCTION
STRONGHOLD ENGINEERING, INC.
MERCER FRASER COMPANY
BOBO CONSTRUCTION INC
DESIGN ELECTRIC COMPANY
RODAN BUILDERS -Prime
BGI CONSTRUCTION
Response posted 12/15/2022




Inquiry #13: Does this Caltrans project 04-2K9504 have a "Buy America" material requirement? We did not see the "Buy America" requirement in the Special Provisions. Please clarify if this project needs to met "Buy America" material requirements.
Inquiry submitted 12/15/2022

Response #1:Submitted for consideration.
Response posted 12/15/2022


Response #2:Yes, please see 2018 Standard Specifications, Section 6-1.04.
Response posted 01/05/2023




Inquiry #14: Bid Item #10 is Prepare Water Pollution Control Program. It is unlikely that the disturbed soil area will remain less than 1 acre for this project. Will Caltrans issue an addendum to add a Bid Item for Prepare Storm Water Pollution Prevention Plan?
Inquiry submitted 12/15/2022

Response #1:Submitted for consideration.
Response posted 12/15/2022


Response #2:Please see addendum 1. Bid Item 102, Prepare Storm Water Pollution Prevention Plan has been added.
Response posted 01/05/2023




Inquiry #15: After submission, how long does a bid remain subject to acceptance?
Inquiry submitted 12/15/2022

Response #1:Submitted for consideration.
Response posted 12/15/2022


Response #2:The bids are ‘subject to acceptance’ for the period between bid opening and award which is generally, 4-6 weeks.
Response posted 01/04/2023




Inquiry #16: What is the deadline to submit pre-bid RFI's for this project?
Inquiry submitted 12/16/2022

Response #1:Submitted for consideration.
Response posted 12/19/2022


Response #2:Bid Inquiries can be submitted up to the bid open. However, responses generally take time to provide an adequate answer.
Response posted 12/24/2022




Inquiry #17: After reviewing the specs and details for the Security Metal Fence and Gates , we did not see any specs for gate automation. On plan sheet C-5 the overhead detail for the Security Metal Sliding Gate shows an outline of a gate operator. Please clarify weather the sliding gates require any type of gate operator or automation. If so, please supply specs on what is needed.
Inquiry submitted 12/16/2022

Response #1:Submitted for consideration.
Response posted 12/19/2022


Response #2:The Security Metal Sliding Gate requires automation. Refer to Special Provisions section 80-11.01B Definition and 80-11.01C Submittal.
Response posted 01/05/2023




Inquiry #18: Questions regarding the low voltage specification sections in 99-26 "Electrical".

Question #1: Is there a preferred manufacturer for Structured Cabling or is it an open spec?

Question #2: Please confirm all cable is to be Cat6 including WAP cable and camera cable?

Question #3: Is all network equipment OFOI? Are all the wireless access points OFCI?

Question #4: Does the cabling contractor provide patch cables? If so, does contractor provide two patch cables for every cable installed (one patch cable for IDF end and one patch cable for station side)?

Question #5: Do WAP’s only require one Cat6 cable?

Inquiry submitted 12/16/2022

Response #1:Submitted for consideration.
Response posted 12/19/2022


Response #2:1. There is no preferred manufacturer. Please bid per the current contract documents.
2. Cables must be as described per plans and specifications. Please bid per the current contract documents.
3. Refer to plan sheet EE-6.51 and specifications section 99-260500, 1.2F.2. Please bid per the current contract documents.
4. Contractor to provide all required cables. Please bid per the current contract documents.
5. Cables must be as described per plans and specifications. Please bid per the current contract documents.
Response posted 01/04/2023




Inquiry #19: On I1-02 it indicated the ceiling in the corridor 20 is exposed to structure. Yet, on A1-14 it indicates this is APC-1. Can you please clarify which is correct.
Inquiry submitted 12/19/2022

Response #1:Submitted for consideration.
Response posted 12/19/2022


Response #2:Please refer to Addendum No. 1 dated January 5, 2023. The ceiling in corridor 20 is to be APC-1.
Response posted 01/05/2023




Inquiry #20: 1. Is lab exhaust galvanized steel? If not, what material is it? The specifications list general material as galvanized
sheet steel unless noted otherwise. There are no other notes regarding materials for ductwork. Low pressure ductwork is
also listed as not being used. (Specification section 99-233100, pg 409 of document)
2. What manufacturer/model are the canopy hoods?
3. Will a project schedule be provided?
4. What manufacturer is preferred for controls? Johnson Controls is listed under the actuators in the specs but no
other manufacturer is listed for the system. (Specification section 99-230900, pg 404 of document)
5. Please confirm indoor exposed supply ductwork is double wall with 1” insulation, and indoor exposed return
ductwork is standard galvanized sheet steel with no insulation. (Specification section 99-230700, pg 392 of document)

Inquiry submitted 12/19/2022

Response #1:Submitted for consideration.
Response posted 12/19/2022


Response #2:1. Refer to specifications section 99-233100, 2.1A. Please bid per the current contract documents.
2. No manufacturer and model provided for canopy hoods. Please bid per the current contract documents.
3. No preferred manufacturer provided. Please bid per the current contract documents.
4. No preferred manufacturer provided. Please bid per the current contract documents.
5. Refer to specifications section 99-230700, 2.7A. Please bid per the current contract documents.
Response posted 01/04/2023




Inquiry #21: Hello, I do not find builders risk mentioned in the 7-1.06 Insurance specification. Will the State provide builders risk and will the Contractor be covered?
Inquiry submitted 12/21/2022

Response #1:Submitted for consideration.
Response posted 12/22/2022


Response #2:The State does not provide for builder's risk.
Response posted 01/05/2023




Inquiry #22: Questions regarding Electronic Safety and Security Special Provision section 99-28.

Question #1: Is there an existing Access Control System Caltrans utilizes that this system will tie into?

Question #2: If we are not to tie into the existing Access Control Server for Caltrans, what MFG Model do they use?

Question #3: The Specification calls out for systems, i.e., Access, Video Surveillance, Intrusion and Intercom to integrate. Yest calls out for the Video Surveillance Server to be that of Axis. Axis will only integrate with its own Access Control and Intercom systems. It will not integrate with any Intrusion systems. Please confirm all systems
must integrate as well as if so, using another VMS to ensure all do is allowable.

Inquiry submitted 12/22/2022

Response #1:Submitted for consideration.
Response posted 12/23/2022


Response #2: Question 1: There is no existing access control system involved.

Question 2: Please bid per the current contract documents.

Question #3: Utilize a system that has the capability to integrate all systems as specified in Section 99-28.

Response posted 01/03/2023




Inquiry #23: 1) Door 2 remarks sat "provide panic hardware, the the hardware set for that door shows a mortise lock. Which is correct?
2) All the 9/6 high pair show a width of 6/4, but the remarks say (2) "3' doors". Which is correct?
3) Door 20, the schedule calls for opening to be hollow metal, but the window schedule calls for it to be aluminum. The frame details show both aluminum and hollow metal details, and the hardware scheduled for it is more indicative of what you put on an aluminum door. Which is correct?

Inquiry submitted 12/27/2022

Response #1:Submitted for consideration.
Response posted 12/27/2022


Response #2:1) Please clarify your question. The remarks for door 2 on the door schedule on plan sheet A6-02 do not call for “Panic Hardware”.

2) Please refer to Addendum No. 1 dated January 5, 2023. Plan sheet 135 (A6-02) has been replaced.

3) Please refer to Addendum No. 1 dated January 5, 2023. Plan sheet 135 (A6-02) has been replaced.

Response posted 01/05/2023




Inquiry #24: What is the percentage of work to be completed by Contractors Forces (employees).
Inquiry submitted 01/02/2023

Response #1:Submitted for consideration.
Response posted 01/03/2023


Response #2:Please see Section 2, Bidding of the 2018 Standard Specifications regarding contractor’s eligibility and bidding requirements.
Response posted 01/05/2023




Inquiry #25: Will the bid opening date for the above contract will be pushed back (currently 1/12/23)? We are having a hard time meeting that deadline because so many subcontractors were closed for the holidays. Please let us know if there’s any way that we can get that extended.
Inquiry submitted 01/03/2023

Response #1:Submitted for consideration.
Response posted 01/03/2023


Response #2:Bid Opening will be per schedule on 1/12/23.
Response posted 01/11/2023




Inquiry #26: RFI HVAC-OR-001 Drawing M 1-02 Canopy Hood Schedule Remark # 3 call for side baffles, please provide hoods construction details as well baffles type required.

Please provide type of material required for all the Canopy Hoods.

Inquiry submitted 01/03/2023

Response #1:Submitted for consideration.
Response posted 01/03/2023


Response #2:Please see the response to bidder inquiry no. 20. Please bid per the current contract documents.
Response posted 01/05/2023




Inquiry #27: Please confirm specs of Compressed Air Lines to be 316 Stainless Steel chemical waste and fittings per specs 99-220513 part 2.2.11. It appears that the CA specs is for waste line. If different from the specified please advise.

Our suppliers cannot price up the plumbing fixtures and equipment per the provided schedule on the drawings and specs 99-221000 part 2.0 and part 3.8. We need specific manufacturer’s name/s and model number/s.

Inquiry submitted 01/03/2023

Response #1:Submitted for consideration.
Response posted 01/03/2023


Response #2:The requirements for the compressed air lines are in section 99-220513.

Please see section 221000 for the requirements of plumbing fixtures and equipment. Please note the list of available manufacturers for each product. No specific manufacturer or product has been specified.

Please bid per the current contract documents.

Response posted 01/06/2023




Inquiry #28: Please provide complete specifications of the submeters per notes 11 and 12 on sheet MP4-01.

We need Compressed Air schematic diagram to include valves and components in the system.

Inquiry submitted 01/03/2023

Response #1:Submitted for consideration.
Response posted 01/03/2023


Response #2:Please see section 99-221113 for the requirements for meters. Please see the air schematic on MP1-01B. Please bid per the current contract documents.
Response posted 01/06/2023




Inquiry #29: Please provide complete specs of the following items per sheets MP0-02 and MP0-04:
CO-1, DF-1, EEW-1, ET-1, FD-1, FS-1, FS-2, HB-1, HB-2, KS-1, L-1, L-2, LS-1, LS-2, MS-1 RD-1, SH-1, ST-1, ST-2, TP-1, U-1, WC-1, WHA-1, CP-1

Please provide complete specs of the following items per sheet MP0-07:
- OD-1 per detail 1
- Gas flexible connector per detail 2
- Condensate drain flexible connector per detail 4

Please provide complete specs of the following items per sheet MP5-01:
- Excess Flow valve per call-out on typical gas connection detail

Please advise if quick air disconnect adapter/s is/are required per general note on sheet MP1-01B. If required is/are this/these FNPT or
MNPT?

Please provide complete specs of the Thermostatic Mixing Valve including sizes of cold/hot water inlets and tempered water outlet.

Please provide Thermometer specs per detail 4/MP0-06.

Inquiry submitted 01/03/2023

Response #1:Submitted for consideration.
Response posted 01/03/2023


Response #2:Please see section 99-221000 for the following items; CO-1, DF-1, EEW-1, ET-1, FD-1, FS-1, FS-2, HB-1, HB-2, KS-1, L-1, L-2, LS-1, LS-2, MS-1 RD-1, SH-1, ST-1, ST-2, TP-1, U-1, WC-1, WHA-1, CP-1on sheets MP0-02 and MP0-04.

Please see section 99-220513 for the requirements for the OD-1, the gas flexible connector and the condensate drain flexible connector on MP0-07.

Please see section 99-221000 for the excess flow gas valve, adaptors and thermostatic mixing valve.

Please see section 99-230519 for the thermometer spec.

Please bid per the current contract documents.

Response posted 01/06/2023




Inquiry #30: Condensate drains for the fan coil units are not shown on the plumbing drawings. Please provide lay-out if needed, or else these CD lines will not be included in our bid.
Inquiry submitted 01/03/2023

Response #1:Submitted for consideration.
Response posted 01/03/2023


Response #2:Please see detail 4 on MP0-07. Please note that the drain line must be supported to prevent sag and terminate to an approved receptor. Please bid per the current contract documents.
Response posted 01/06/2023




Inquiry #31: 1. Drawings for Photovoltaic system not shown on the Architectural drawings.
2. Reference drawings EE-0.20 shows only 3 EV charger to be provide, & installed, Panel

EV shows 4 EV to be installed please let us know the location of the 4th EV

Inquiry submitted 01/03/2023

Response #1:Submitted for consideration.
Response posted 01/04/2023


Response #2: Please see EE0-0.20 for the two dual cord level 2 charging stations and the one DCFC. Please see EE-2.50 for the DCFC circuit. Please see EE-2.61 for the EV panel schedule. Please note that a total of 4 circuit are needed for the two level 2 chargers. Please bid per the current contract documents.
Response posted 01/06/2023


Response #3:1. Please see sheets GP and A1-15 for photovoltaic systems at carports and building roof, respectively.
2. Please see EE0-0.20 for the two dual cord level 2 charging stations and the one DCFC. Please see EE-2.50 for the DCFC circuit. Please see EE-2.61 for the EV panel schedule. Please note that a total of 4 circuit are needed for the two level 2 chargers. Please bid per the current contract documents.

Response posted 01/06/2023




Inquiry #32: Description: Spec 088000 glazing section 3.7 glass type GT-2 calls out for a Low-E coating but it does not specify a type.

Clarification – Please provide a low-E coating glass type

Inquiry submitted 01/03/2023

Response #1:Submitted for consideration.
Response posted 01/04/2023


Response #2:Please see the insulating glass schedule in part 3.7 of section 99-088000. Item no. 6 refers to low-E coating. Please see 99-088000 for other glazing requirements. Please bid per the current contract documents.
Response posted 01/06/2023




Inquiry #33: Description: There are some outrigger sunshades attached to the storefront elevations but there are no details of the
sunshade attachments.

Clarification – Please provide sunshade detail attachments to the storefront.

Inquiry submitted 01/03/2023

Response #1:Submitted for consideration.
Response posted 01/04/2023


Response #2:Please see section 99-107113 for the requirements of the sunshades. Please note in part 1.4, Submittals, the shop drawings must include, plans, elevations, sections, blade, angles, blade spacing and attachments to compatible systems. Please bid per the current contract documents.
Response posted 01/06/2023




Inquiry #34: I am reviewing the documents for this project and wanted to get clarification on cut/fill and export of this project in order to bid accordingly. Since the plans do not include existing elevations, we are unable to prepare a proper take off. If no topo plan is issued, should we proceed with pricing out per bid list items #024 and #025 which provide a total of 1,943cy and assume this is total cut and export?
Inquiry submitted 01/03/2023

Response #1:Submitted for consideration.
Response posted 01/04/2023


Response #2:Please bid per Items 24 and 25 per quantities given.
Response posted 01/05/2023




Inquiry #35: Please advise if there is a mandatory COVID vaccination required for the project.
Inquiry submitted 01/03/2023

Response #1:Submitted for consideration.
Response posted 01/04/2023


Response #2:Caltrans has not required vaccinations for Covid, but the contractor is still required to follow the County requirements.
Response posted 01/05/2023




Inquiry #36: We noticed that there are 12 x Remote Control Valves listed in the bid items 41-43, however the main line master valve that connects to the backflow and flow sensor is not identified as a separate item, which would be the 13th remote control valve in total.

It is shown on IP-2, at the bottom, listed as 2" RCVM "A".

Will this be added as an item?

Is it to be included with the backflow or flow sensor pricing?

Inquiry submitted 01/04/2023

Response #1:Submitted for consideration.
Response posted 01/04/2023


Response #2:Please see Addendum 1. Item 43, 206565, 2-inch Remote Control Valve has been increased to a count of 4 per Addendum 1.
Response posted 01/05/2023




Inquiry #37: There is an existing schematic fire sprinkler design included in the bidding documents. We have 2 questions regarding this design:

1) The sprinkler lines run parallel with the open web joists. Will attachment to the metal deck be allowed for pipe sizes 1 1/2" and smaller?

2) Will fire sprinkler design build contractors be allowed to reconfigure the piping layout if it is more cost effective? Or is the owner committed to the current pipe routing?


Inquiry submitted 01/05/2023

Response #1:Submitted for consideration.
Response posted 01/05/2023


Response #2:Fire sprinkler drawings shown are schematic and for reference only. Refer to notes on sheets GI-1A and FP0-01. Provide submittals for piping layout and attachment for approval per plans and specifications. Please bid per the current contract documents.
Response posted 01/06/2023




Inquiry #38: Bid item 79 Detectable Warning Surface bid quantity is 130 sqft. Plan sheet 35 provides a summary of quantities for the detectable warning surfaces. Our takeoff indicates there is a quantity or unit of measure discrepancy. Should the bid quantity be increased to 1,170 sqft or should the unit of measure be changed to 130 sqyd?
Inquiry submitted 01/05/2023

Response #1:Submitted for consideration.
Response posted 01/05/2023


Response #2:Please bid per the current contract documents.
Response posted 01/11/2023




Inquiry #39: Please clarify the following conflicting specifications for the Overhead Coiling Door Specification 99-083323:
2.2L Door Finish, lists Powder Coat and factory prime finish please verify finish required.
Emergency Manual Operation lists Chain type and push/pull handles, please verify which is required.

Inquiry submitted 01/05/2023

Response #1:Submitted for consideration.
Response posted 01/05/2023


Response #2:1. Door finish to be factory prime finish (section 99-083323, Part 2.2L.2), and paint (sheet A6-02).
2. Emergency manual operation to be chain type (section 99-083323, Part 2.2J.5).

Response posted 01/09/2023




Inquiry #40: Please provide the laboratory casework specifications.
Inquiry submitted 01/05/2023

Response #1:Submitted for consideration.
Response posted 01/06/2023


Response #2:Please refer to section 99-123553.13 - METAL LABORATORY CASEWORK.
Response posted 01/09/2023




Inquiry #41: Please advise if Caltrans will be extending the bid date for this project as requested in inquiry #25. Caltrans current response states "Submitted for consideration" CalTrans did not address a response to this question in the issuance of Addendum #1.
Inquiry submitted 01/05/2023

Response #1:Submitted for consideration.
Response posted 01/06/2023


Response #2:Bid Opening will be per schedule on 1/12/23.
Response posted 01/11/2023




Inquiry #42: 1) Inquiry #3 on RFI’s 1.5.23.pdf – they replaced the metal adjustable shelves which are shown on the wall with reagent shelving (item 2.10A from spec). That is not correct. Reagent shelving are those that are on top of a countertop. Not wall shelving as shown in the elevations. The key note 123553.7 calls out for metal shelving. I think the question was what type of shelving. Wall mounted; free standing like U-Line or Metro type shelving.

2) Per Addendum #1 Plans, Sheet I1-08, Material and finish schedule, Rooms 9-13 note casework as CAB-1 Metal which is correct, but for the counter tops they note WP-1 which is a fiberglass reinforced panels. Spec 123553 calls out for stainless steel tops on all metal casework. Please advise if this is correct?

Inquiry submitted 01/05/2023

Response #1:Submitted for consideration.
Response posted 01/06/2023


Response #2:1. Shelving noted with keynote 12 3553.7 on plans is to be free standing and comply with section 99-123553.13 - METAL LABORATORY CASEWORK, 2.10A.
2. Metal casework to have stainless steel countertops per section 99-123553.13 - METAL LABORATORY CASEWORK.

Response posted 01/09/2023




Inquiry #43: The plumbing schedule and drawings are missing a lot of the product information. Please provide the relevant specifications/make/model. We will need it to provide accurate pricing.
Inquiry submitted 01/06/2023

Response #1:Submitted for consideration.
Response posted 01/06/2023


Response #2:Please see the responses to bid inquiries #27, 28, 29 and 30, and specifications sections 99-22 and 99-23. Please bid per the current contract documents.
Response posted 01/10/2023




Inquiry #44: 083323 Overhead Coiling Doors
Please confirm if coiling doors are fire rated.

Inquiry submitted 01/06/2023

Response #1:Submitted for consideration.
Response posted 01/06/2023


Response #2:Please see the response in bid inquiry #10. Overhead coiling door is not fire rated.
Response posted 01/09/2023




Inquiry #45: Mulch Type
Current mulch specified can only be found on out of state.

After searching for Pine mulch as spec’d I found out it will only be available from out of state
vendors, Please advise on how to proceed?

Inquiry submitted 01/06/2023

Response #1:Submitted for consideration.
Response posted 01/06/2023


Response #2:Please bid per the current contract documents.
Response posted 01/11/2023




Inquiry #46: Precast concrete manufacturer

After reaching out to multiple precast concrete furnishing manufacturers, all have said to get the
exact manufacturer because making a mold for the items would cost more than the item.

Please clarify Manufacturer for Precast concrete furnishings?

Inquiry submitted 01/06/2023

Response #1:Submitted for consideration.
Response posted 01/06/2023


Response #2:There is no preferred manufacturer. Please bid per the current contract documents.
Response posted 01/11/2023




Inquiry #47: What material and gauge are the canopy hoods to be fabricated out of? Is there a basis of design manufacturer for the canopy hoods?

Inquiry submitted 01/06/2023

Response #1:Submitted for consideration.
Response posted 01/06/2023


Response #2: Canopy hoods are to be galvanized steel sheet. Refer to SMACNA for requirements and plan sheet A1-27 which indicates canopy hoods to be per specifications section 99-05500.
Response posted 01/10/2023


Response #3:Canopy hoods to be galvanized steel sheet. Refer to plan sheet A1-27 which indicates canopy hoods to be per specifications section 99-05500, and SMACNA for additional requirements.
Response posted 01/10/2023




Inquiry #48: Could you provide the dimensions of interior signages as they are not available in the plans?
Inquiry submitted 01/09/2023

Response #1:Submitted for consideration.
Response posted 01/09/2023


Response #2:Please refer to plan sheets A0-3.3 and I1-09, and specifications section 99-101423.16 - ROOM-IDENTIFICATION PANEL SIGNAGE.
Response posted 01/10/2023




Inquiry #49: On Sheet M4-06, Note #4 states "Where possible, motorized damper to be activated on/off by interlock with lab equipment controls..."

Question: Are there any lab equipment controls? None are shown on these plans or
mentioned in the spec documents.

Inquiry submitted 01/09/2023

Response #1:Submitted for consideration.
Response posted 01/09/2023


Response #2:Plan sheets M5-02 (204) and M5-03 (205) show the control logic for the exhaust fans which shows how the BAS should be designed. Additionally, the BAS specifications are in section 99-239500.
Response posted 01/10/2023




Inquiry #50: On Sheet M4-06, Note #4 states "...where lab equipment has no controls to interlock to, provide hood mounted manual on/off switch for motorized dampers."

Question: Please confirm there are no lab controls to interlock to for any of the (20) canopy hoods. If confirmed, please also confirm that each hood needs an ON/OFF switch and motorized open/close (non-modulating) damper?

Inquiry submitted 01/09/2023

Response #1:Submitted for consideration.
Response posted 01/09/2023


Response #2:Plan sheets M5-02 (204) and M5-03 (205) show the control logic for the exhaust fans which shows how the BAS should be designed. Additionally, the BAS specifications are in section 99-239500.
Response posted 01/10/2023




Inquiry #51: On Sheet M4-06, Note #4 states "...where lab equipment has no controls to interlock to, provide hood mounted manual on/off switch for motorized dampers."

Question: Please confirm if these damper actuators and on/off switches are to be low-
voltage and provided, installed and wired up by the controls contractor or to be 120V and provided, installed and wired by the electrician.

Inquiry submitted 01/09/2023

Response #1:Submitted for consideration.
Response posted 01/09/2023


Response #2:Plan sheets M5-02 (204) and M5-03 (205) show the control logic for the exhaust fans which shows how the BAS should be designed. Additionally, the BAS specifications are in section 99-239500.
Response posted 01/10/2023




Inquiry #52: May you please update the "Bid Items List" to show the items that have been deleted, added, or replaced on both website and bidding software per addendum no. 1.
Inquiry submitted 01/09/2023

Response #1:Submitted for consideration.
Response posted 01/09/2023


Response #2:Please be aware the bid book and 001x (addendum) can be downloaded from bidx.com. Caltrans does not update the original Item list on the Contractor's Corner site. For informational purposes only.
Response posted 01/09/2023




Inquiry #53: I noticed that the exhaust fans are to be FRP. I don't see anything in the specs or drawings that dictate FRP exhaust duct. Please confirm that galvanized sheet metal is okay for the exhaust
Inquiry submitted 01/09/2023

Response #1:Submitted for consideration.
Response posted 01/09/2023


Response #2:Please refer to section 99-233100 for the ductwork.
Response posted 01/10/2023




Inquiry #54: There will be excess soils for the above project.

1. Are theses materials classified as clean soils and can they be left onsite in the open parcel? Or do excess soils have to be off hauled?

Inquiry submitted 01/09/2023

Response #1:Submitted for consideration.
Response posted 01/10/2023


Response #2:Please bid per current contract documents.
Response posted 01/11/2023




Inquiry #55: The letting for this project indicates that File 04-2K9504.001X is required to bid to Caltrans. However, I am unable to open this file. Please advise what program is necessary in order to access this file. Alternatively, confirm this file is actually necessary in order to bid.
Inquiry submitted 01/10/2023

Response #1:You DO NOT open .001X file. Place the bid book (.ebsx file) and .001X in the same folder and open the bid book (.ebsx file). The .001X will automatically incorporate into the bid book.
For more information please refer to "Frequently Asked Questions about Electronic Bidding" and the "First time bidders click here" in the Caltrans Contractors Corner web site; "http://ppmoe.dot.ca.gov/des/oe/contractor-info.html" to access the Guideline.
First Time Bidding: http://ppmoe.dot.ca.gov/des/oe/electronic-bidding.html
FAQ about Electronic Bidding: http://ppmoe.dot.ca.gov/des/oe/ebid-FAQ.php

Response posted 01/10/2023


Response #2: Submitted for consideration.
Response posted 01/10/2023




Inquiry #56: Please provide the geotechnical report for the building pad preparation.
Inquiry submitted 01/10/2023

Response #1:Submitted for consideration.
Response posted 01/10/2023


Response #2:Please refer to the Information Handout.
Response posted 01/11/2023




Inquiry #57: Please provide the specifications for the gate auto operator and sliding gate.
Inquiry submitted 01/10/2023

Response #1:Submitted for consideration.
Response posted 01/10/2023


Response #2:Refer to Special Provisions section 80-11.01C Submittal.
Response posted 01/11/2023




Inquiry #58: Special Provisions, section 20-2.06B(2)(a) states that irrigation controller prices are good until December 31, 2022. Confirm these prices still can be used for bidding purposes. otherwise, provide the update pricing.
Inquiry submitted 01/10/2023

Response #1:Submitted for consideration.
Response posted 01/11/2023


Response #2:Please bid per current contract documents.
Response posted 01/11/2023




Inquiry #59: Per section 20-2.06B(3), irrigation controller enclosure cabinet must be 48" high by 18" wide by 12" deep. However, per section 20-2.06B(2)(a) the provided model, SB18SS for the irrigation controller cabinet is 18" x 36" x12". Please clarify.
Inquiry submitted 01/10/2023

Response #1:Submitted for consideration.
Response posted 01/11/2023


Response #2:Please bid per current contract documents.
Response posted 01/11/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.