Viewing inquiries for 06-0U4904

Submit new inquiry for this project


Inquiry #1: In the special provisions, a paragraph is replaced in Section 39-3.04A which states that cold planing and HMA placement must occur during the same shift at Repair Failed area locations. Does this mean that cold planning and placing of HMA can occur during different shifts at other locations? And if so, how long can the cold planed surface be left open?
Inquiry submitted 03/30/2020

Response #1:Submitted for consideration.
Response posted 03/31/2020


Response #2:The depth of the drop-off between adjacent lanes directs the HMA placement. Per Standard Specification 39-3.04C(2), where lanes are open to traffic, the drop-off between adjacent lanes must not be more than 0.15 foot. Bid per current contract documents.
Response posted 04/06/2020




Inquiry #2: I got a inquiry for item # 58 – Reusable Crash Cushion
Are we reusing what we removing item # 60 Remove Crash Cushion
or are we supplying a New Crash Cushion that can be reusable ?
The Specification is calling for a new Smart Cushion and Quad guard .

Inquiry submitted 04/07/2020

Response #1:Removed item is Not to be reused. New Smart Cushion and Quadguard is required per project special provisions 83-5.05B.
Response posted 04/08/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.