Inquiry #1: Please provide specifications for Edging 2" x 6" or bid item #27 Edging.
Inquiry submitted 05/17/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/18/2022


Response #2:Please bid per contract documents.
Response posted 05/24/2022




Inquiry #2: Per the bid items list, bid item no.31 (Control and neutral conductors) is shown. However, no conductors are shown on irrigation plans for new remote control valves needs to be added to the system. Please revise the irrigation plans to show the conductors. Otherwise, advise how those valves shall be connected to the new controller.
Inquiry submitted 05/20/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/23/2022


Response #2:Contractor to install Control Neutral Conductors from the irrigation controller “E” to all new and existing remote control valves.
Response posted 05/24/2022




Inquiry #3: Sheet EQ-1 states the conduit is to be Type 1, but on page 32 of the special provisions it says "Use Type 3 conduit for underground installation". Please let us know whether the conduit is to be Type 1 or Type 3. Thank you.
Inquiry submitted 05/23/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/23/2022


Response #2:Please bid per contract documents.
Response posted 05/24/2022




Inquiry #4: Please confirm plan sheet 35 (SES-1) is correct for the intended work and materials to be procured.
Inquiry submitted 05/25/2022

Response #1:Due to the late submittal of the inquiry, and time constraints, please bid according to the contract plans and specifications.
Response posted 05/25/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.