Inquiry #1: In the Bid Item List, it is mentioned that there is an Automatic Work Zone Information System.

Could you confirm what the AWZIS aspect of these jobs will require in terms of message signs, sensors, and messages that should be on the signs?

Inquiry submitted 11/13/2020

Response #1:Please refer to the following project specs on page 13: ?Add to the end of section 12-3.35A(1):
Use an AWIS for the closure pour at Paramount Blvd UC bridge. Refer to Motorist Information Plan MI-3 and MI-4 for the portable changeable message sign locations and messages.?

Response posted 11/13/2020




Inquiry #2: What will the duration of the Automatic Work Zone Information System be?
Inquiry submitted 11/13/2020

Response #1:Please refer to page 15&16 of the project specs.
Response posted 11/13/2020




Inquiry #3: What will the duration of the Automatic Work Zone Information System be?
Inquiry submitted 11/13/2020

Response #1:Please refer to page 15&16 of the project specs.
Response posted 11/13/2020




Inquiry #4: Regarding Bid item No. 5 Automated Work Zone Information System. Can you provide more information and details regarding the equipment for this item and the duration of the system on the job?. We have contacted several suppliers and they do not have enough information to provide a proper quote.
Can the bid date be extended to allow enough time to quote after all the inquiries have been answered?

Thank you

Inquiry submitted 11/13/2020

Response #1:Please refer to section 12-3.35 Automated Work Zone Information Systems and pages 15 & 16 of the project specs for details regarding the equipment for this item and the duration of the system on the job. No additional information is available.
No, the bid date will not be extended.
Response posted 11/15/2020




Inquiry #5: There is no bid item for Asbestos surveying and sampling. How will this item be paid for?
Inquiry submitted 11/16/2020

Response #1:Section 14-11.16 Asbestos-Containing Construction Materials In Bridges of the project special provisions does not include cost clauses, so it?s not to be a bidding item. Rather, the Contractor should treat it as additional requirements on the concrete removal work that they are to bid. This section sets requirements on the Contractor that, with respect to Asbestos Containing Material (ACM), they are limited to conducting survey and sampling. If the Survey and Sampling found ACM exceeding the standards, it does not require the Contractor to perform removal of ACM. Rather, the ACM would be removed by the D7 Hazardous Waste Emergency Contractor, who is a qualified specialist on asbestos. As such, the Contractor will not perform the work and thus is not required to prepare an Asbestos Compliance Plan. The cost of the Emergency Contractor would be reimbursed by the project contingency funds.
Thank you,
Response posted 11/16/2020


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.