Viewing inquiries for 08-0G6914

Submit new inquiry for this project


Inquiry #1: Is the seed 23.5 LBS/ACRE listed on ECL-1, Step 2, pure live seed or bulk pounds per acre?
The seed mix on ECL-1 does not specify.

Inquiry submitted 03/24/2022

Response #1:Submitted for consideration
Response posted 03/25/2022


Response #2:The seed mix quantity is noted as Live Pure Seeds per project plans on ECL-1 SEED MIX table
Response posted 04/04/2022




Inquiry #2: ON SHEET L-1, L-2, L-3, & L-6: ARE EXISITING ALTERNATIVE CRASH CUSHIONS TO BE INCLUDED IN 'SALVAGE DOUBLE THRIE BEAM BARRIER' (BID ITEM #106)?

BID ITEM #105 'ALTERNATIVE CRASH CUSHION SYSTEM': QUANTITY DOES NOT MATCH ALTERNATIVE CRASH CUSHIONS REMOVED IN 'SALVAGED DOUBLE THRIE BEAM BARRIER', IS IT THE INTENT TO REPLACE REMOVED ALTERNATIVE CRASH CUSIONS WITH BID ITEM #102 'DOUBLE THRIE BEAM BARRIER' AT 5 OF THOSE LOCATIONS?

Inquiry submitted 03/29/2022

Response #1:Submitted for consideration
Response posted 04/05/2022


Response #2:This issue will be addressed in an upcoming addendum
Response posted 04/18/2022




Inquiry #3: BID ITEM #101 (VEGETATION CONTROL) CALLS FOR VEG CONTROL BENEATH DOUBLE THRIE BEAM BARRIER, HOWEVER, IT APPEARS TO US THAT THERE IS AC UNDER ALL AREAS OF NEW THRIE BEAM BARRIER. WOULD VEGETATION CONTROL BE NECESSARY IN THESE AREAS?

Inquiry submitted 03/31/2022

Response #1:Submitted for consideration
Response posted 04/05/2022


Response #2:No need to install VC since existing AC pvmt acts as VC. However, the contractor still needs to remove portion of AC for the BLOCKOUT at post locations as shown in the Const Details sheets.


Response posted 04/07/2022




Inquiry #4: Please provide Drainage Profiles for Drainage Systems scoped for CIPP (DS no. 5a, 8a, 8b, 8c, 8d, 8e).
Inquiry submitted 04/11/2022

Response #1:Submitted for consideration
Response posted 04/13/2022


Response #2:This issue will be addressed in an upcoming addendum.
Response posted 04/18/2022




Inquiry #5: Section 71-308B(1) states that the minimum wall thickness for Drainage System 8 is 2" (~50.8mm). This appears to be an error/typo. Please remove this requirement as an 18" x 50.8mm or 24" x 50.8mm liner is not constructible. Minimum wall thickness for CIPP should be designed per ASTM F1216, Appendix X1.2.1 as mentioned in Section 71-3.08A(3).
Inquiry submitted 04/11/2022

Response #1:Submitted for consideration
Response posted 04/13/2022


Response #2:This issue will be addressed in an upcoming addendum.
Response posted 04/29/2022




Inquiry #6: Bid Item #38 ROADWAY EXCAVATION for 24,100 CY... This item is broken down and reflected on Plan Sheet Q-1. A takeoff has been performed and the access road quantity appears to be about 3,000 CY lower than shown. Additionally, there is no roadway excavation shown on the plans for the "mainline". The only excavation in the mainline is for the various underground piping items and this excavation is incidental to the pipeline(s) and is not considered roadway excavation.

Please clarify where/what the 10,990 CY of "mainline roadway excavation" or delete if in error.

Inquiry submitted 04/11/2022

Response #1:Submitted for consideration
Response posted 04/13/2022


Response #2:This issue will be addressed in an upcoming addendum.
Response posted 04/29/2022




Inquiry #7: For the "#16 TEMPORARY AUTOMATED END OF QUEUE WARNING SYSTEM (TYPE 1) DAY" & "#17 END OF QUEUE MONITORING AND WARNING WITH TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY"... I am referencing the standard plan RSP T26 (Sheet 168) of then plan sheets.

I am having a difficult time understanding what is to be included in the bid item/work... The graphic shows one PCMS but there are nine message options that is confusing me as to whether there is only one PCMS or if there are nine PCMS with one PCMS for each message. Please help clarify.

Inquiry submitted 04/13/2022

Response #1:Submitted for consideration
Response posted 04/13/2022


Response #2:Standard plan RSP T26 identifies only one PCMS and the nine messages vary depending on the speeds listed on the table.


Response posted 04/14/2022




Inquiry #8: IN RESPONSE TO INQUIRY #3 REGARDING BID ITEM 101: VEGETATION CONTROL; WHAT TYPE OF BACKFILL DO YOU REQUIRE TO FILL THE VOID OF THE A/C THAT IS TO BE REMOVED?
Inquiry submitted 04/18/2022

Response #1:This issue will be addressed in an upcoming addendum
Response posted 04/19/2022




Inquiry #9: Current takeoff would indicate the job will actually be long about 2,000 CY of earthwork and not short like the bid items are set up for. Could the import borrow item be deleted and an export item be added? Please re-check the quantities and advise.
Inquiry submitted 04/25/2022

Response #1:Submitted for consideration
Response posted 04/25/2022


Response #2:This issue will be addressed in an upcoming addendum.
Response posted 05/04/2022




Inquiry #10: Section 14-6.03A of the Standard Specifications states to "Maintain a limited operating period at Survey Area J (PM 17.1) prohibiting activities during the breeding season (March 1 – August 31) unless pre-construction surveys confirm that California spotted owls are not nesting." Is the CSB conducting the pre-construction survey for California Spotted Owl and if so, how far in advanced should the pre-construction survey be conducted? Please advise.
Inquiry submitted 04/27/2022

Response #1:Submitted for consideration
Response posted 04/29/2022


Response #2:The contractor supplied biologist will perform the pre-construction survey for owl 3 days prior to construction.



Response posted 05/04/2022




Inquiry #11: Is it the intent to reinstall the salvaged guardrail material and not use new material?
Inquiry submitted 04/27/2022

Response #1:Submitted for consideration
Response posted 04/29/2022


Response #2:This issue will be addressed in an upcoming addendum.
Response posted 05/04/2022




Inquiry #12: Is the contractor supplied biologist required to conduct preconstruction surveys for flying squirrel? It's mentioned in section 2.19.1 of the Streambed Alteration Agreement but not in the Environmental Stewardship section of the specs. Thanks!
Inquiry submitted 04/28/2022

Response #1:Submitted for consideration
Response posted 04/29/2022


Response #2:the contractor-supplied biologist is responsible for the flying squirrel pre-construction survey.
Response posted 05/16/2022




Inquiry #13: On Construction Details C-2 shows guardrail post embedment in rock details. Can you please provide quantities for guardrail to be embedded in rock. On some other project i.e. Caltrans 11-430564, Caltrans provide separate pay item for this. Thanks
Inquiry submitted 05/10/2022

Response #1:No additional pay item for the block out materials
Response posted 05/16/2022




Inquiry #14: Section 20-1.03C(3) states remove by hand pulling method (no machinery to be used) noxious and invasive plants within the highway. Spartina junceum is an extremely deep rooter and impossible to hand pull. Can it be chopped down to ground level and/or sprayed with herbicide?
Inquiry submitted 05/12/2022

Response #1:Please bid per current contract documents.
Response posted 05/16/2022




Inquiry #15: Notice To Bidders states to complete the work, excluding plant establishment work, within 220 working days, including plant establishment work, within 310 working days, and plant establishment work within 250 working days. Working days do not add up, can you please clarify?
Inquiry submitted 05/12/2022

Response #1:Please bid per current contract documents.
Response posted 05/16/2022


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.