Viewing inquiries for 08-1H3514
Submit new inquiry for this projectInquiry #1: Our surety does not utilize electronic bid bonds. I do not see an area to upload the bid bond. Does the original bid bond need to be mailed before the bid date of December 16, at 2? If yes were should it be mailed to?
Inquiry submitted 12/08/2020
Response #1:Submitted for consideration
Response posted 12/08/2020
Response #2:Please refer to " ELECTRONIC BIDDING GUIDE":
Response posted 12/14/2020
Inquiry #2: Just would like to confirm that specification section 71-3.07B(1) General does apply to this contract
Inquiry submitted 12/10/2020
Response #1:Please bid according to current special provisions.
Response posted 12/11/2020
Inquiry #3: Is it possible to postpone the bid: we have a very good method to price this project, but unfortunately still did not receive a bidder ID number to submit the bid on line.
Regards,
Inquiry submitted 12/11/2020
Response #1:Submitted for consideration
Response posted 12/14/2020
Response #2:Please bid per contract documents
Response posted 12/14/2020
Inquiry #4: Cementitious Pipeliner at Location #1 says that a minimum of 3.5" CR 9,000 needs to be used. Design calculations show that the minimum of 1" at all other locations is more than sufficient. Can the requirement at this location be reduced to match the others? Also, can we utilize a cementitious pipeliner product other than CR 9,000 at this location provided it is on the AML?
Inquiry submitted 12/15/2020
Response #1:Q. Cementitious Pipeliner at Location #1 says that a minimum of 3.5" CR 9,000 needs to be used. Design calculations show that the minimum of 1" at all other locations is more than sufficient. Can the requirement at this location be reduced to match the others?
A. The recommended thickness is at least 2" minimum for the peak flow rate.
Q. Also, can we utilize a cementitious pipeliner product other than CR 9,000 at this location provided it is on the AML?
A. Yes you may utilize a different cementitious pipeliner product as long as it is included within the Authorized Material List(AML).
Response posted 12/16/2020
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.