Viewing inquiries for 08-384234

Submit new inquiry for this project


Inquiry #1: Will Caltrans allow the use of the Zoneguard Steel Barrier to be used in leu of Temporary Railing Type K?
Inquiry submitted 09/18/2019

Response #1:Submitted for consideration
Response posted 09/19/2019


Response #2:The use of the Zoneguard Steel Barrier is not permitted. Please bid per current contract documents
Response posted 10/01/2019




Inquiry #2: We kindly request extension to the bid opening date for project no. 08-384234.
Inquiry submitted 09/30/2019

Response #1:Submitted for consideration
Response posted 10/01/2019


Response #2:At the present time no extension will be granted. Please bid per current contract documents
Response posted 10/01/2019




Inquiry #3: Will controller cabinet be furnished by state
for legend note 1 & 4 on plan page E1?

Inquiry submitted 10/10/2019

Response #1:Submitted for consideration
Response posted 10/11/2019


Response #2:Legend 1 will Contractor furnished and Legend 4 will be State Furnished.
Response posted 10/14/2019




Inquiry #4: Per spec section 7-1.02K(6)(j)(iii) it states "The material on this job site: 1. Is not a hazardous waste. 2. Does not require disposal at a permitted landfill or solid waste disposal facility."

Note 4 on plans sheets E-10, E-11 & E-13 along with Note 2 on plan sheet E-14 states " Type Z-2 soil between stations xxx+xxx and xxx+xxx. Top 2.5' of fiber optic (FO) trench section in the above limits to be exported to a permitted disposal facility."

The special provisions Section 14 Environmental Stewardship replaces Section 14.11.08 with 14.11.08 Regulated Material Containing Aerially Deposited Lead. This section contradicts section 7-1.02 and requires more than just a lead compliance plan.

There is no pay item for excavation of Type Z-2 aerially deposited lead.

Please let me know how to proceed.

Inquiry submitted 10/15/2019

Response #1:submitted for consideration
Response posted 10/16/2019


Response #2:Please bid per current contract documents.
Response posted 10/16/2019


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.