Contractor: West Coast Contractors Inc. DBA Oregon West Coast Contractors Contact: Stan Washington
Address: 61050 Hwy 101 Coos Bay, OR 97420
Phone: 541-267-7689 Fax: 541-269-1600 Email: estimating@westcoastcontractors.com
Services needed: West Coast Contractors Inc. DBA Oregon West Coast Contractors is requesting quotes on the Caltrans # 01-0C5004, Construction on State Highway in Humboldt County on Route 36 at Hely Creek Bridge 04-0092 at Little Larabee Creek Bridge 04-0102 and at Butte Creek Bridge 04-0116. That bids 1/26/2023 from qualified subcontractors and suppliers, especially certified UDBE/DBE/SBE/DVBE for all or any part of the following items: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time Related Overhead, Dispute Resolution Board on-site Meeting, Hourly Off- Site Dispute-Resolution-Board Related Tasks, Develop Water Supply, Construction Signage, Traffic Control System, Type III Barricade, Temporary Pavement Marking, Temporary Traffic Stripe, Channelizer, Portable Signal Systems, Temporary Barrier System, Portable Changeable Message Sign, Temporary Flashing Beacon, Alternative Temporary Crash Cushion, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water sampling and Analysis, Storm Water Annual Report, Move-in/Move-out Temporary Erosion Control, Temporary Cover, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, temporary Silt Fence, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Water Quality Sampling and analysis, water Quality Monitoring Report, Water Quality Annual Report, Temporary Creek Diversion Systems, Treated Wood Waste, Contractor Supplied Biologist, Natural Resource Protection Plan , Fish Protection, invasive Species Control, Bird and Bat Exclusion Devices, Contractor Supplied Arborist, Hydroaccoustic Monitoring, Temporary High-Visibility Fence, Clearing and Grubbing, Root Wads, Roadway Excavation, Shoulder Backing, Structure Excavation, Structure Backfill, Concrete Backfill, Soil Amendment, Packet Fertilizer, Plantings, Root Wad Revetment, Plant Establishment Work, Wood Mulch, Foliage Protector Temporary Irrigation System, Plastic Pipe, Move-in/Move out Erosion Control, Hydraulic Biotic Growth Medium, Fiber Reinforced Matrix, Rolled Erosion Control Product, Fiber Rolls, Hot Mix Asphalt, Tack Coat, Cold Plane AC , Temporary Support, Steel Soldier Pile, Drilled Holes, Furnish Steel Piling, Drive Steel Pile, Cast In Drilled Hole Concrete Piling, Prestressing Cast –in – Place Concrete, Structural Concrete, Minor Concrete, Drill and Bond Dowel, Joint Seal, Bar Reinforcing Steel, Headed Bar Reinforcement, Timber Lagging, Clean and Paint Soldier Piling, Public Safety Plan, Rapid Setting Concrete, Remove Asphalt Concrete Surfacing, Remove Unsound Concrete, Prep Bridge Deck Surface, Furnish and Place Polyester Concrete Overlay, Bridge Removal, Corrugated Steel Pipe, Corrugated Steel Pipe Underdrains, Entrance Taper, Anchors, Corrugated Steel Pipe Inlet, Welded Steel Pipe Casing, Remove Entrance Taper, Remover Culvert, Remover Pipe, Remove Downdrain, Remove Inlet, Engineered Bankline Material, Engineered Streambed Material, Misc. Iron and Steel, Prep and Stain Concrete, Stain Galvanized Surfaces, Remove Pavement Markers, Guard Rail Delineators, Pavement Markers, Milepost Marker, Culvert Marker, Treatment Best Management Practice Marker, Roadside Signage, Guard Rail, Vegetation Control, Concrete Barrier, Cable Railing, Transition Railing, End Anchor Assembly, Alternative In-Line Terminal System, Alternative Crash Cushion System, California Bridge Rail, Remove Guardrail, Thermoplastic Traffic Stripe, Thermoplastic Pavement Markings, Remove Thermoplastic Traffic Stripe, Rumble Strip, Modifying Interconnection Conduit and Cable, Mobilization.
Requirements: To encourage DBE participation, West Coast Contractors Inc. DBA Oregon West Coast Contractors may divide quotes into smaller tasks or participation as economically feasible. Subcontractors are required to possess a valid contractor’s license, a DIR #, insurances and workers compensation coverage meeting the projects requirements. Plans and Specifications are available at our office, 61050 Hwy 101, Coos Bay, OR 97420, phone 541-267-7689, or may be obtained from the Caltrans website, http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php If you require assistance in obtaining insurance, equipment, supplies, materials, lines of credit, or payment and performance Bonds please contact West Coast Contractors Inc. DBA Oregon West Coast Contractors ASAP. Please provide all scope letters within 2 days prior to the bid date. West Coast Contractors Inc. DBA Oregon West Coast Contractors is an equal opportunity employer.
Date posted: 11/22/2022
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Sub Trades needed, but not limited to: LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE SIGNAL SYSTEMS (EA), TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY FLASHING BEACON, ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (DAY), NATURAL RESOURCE PROTECTION PLAN, FISH PROTECTION, INVASIVE SPECIES CONTROL, BIRD AND BAT EXCLUSION DEVICES, CONTRACTOR SUPPLIED ARBORIST, HYDROACOUSTIC MONITORING, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROOTWADS, ROADWAY EXCAVATION, SHOULDER BACKING, (F) - STRUCTURE EXCAVATION (BRIDGE), (F) - STRUCTURE EXCAVATION (TYPE D), (F) - STRUCTURE EXCAVATION (SOLDIER PILE WALL), (F) - STRUCTURE BACKFILL (BRIDGE), (F) - STRUCTURE BACKFILL (SOLDIER PILE WALL), (F) - CONCRETE BACKFILL (SOLDIER PILE WALL), (F) - LEAN CONCRETE BACKFILL, SOIL AMENDMENT, PACKET FERTILIZER, PLANT (GROUP A), ROOTWAD REVETMENT, PLANT (GROUP U), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, TEMPORARY IRRIGATION SYSTEM, (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 6" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDRAULIC BIOTIC GROWTH MEDIUM, FIBER REINFORCED MATRIX, ROLLED EROSION CONTROL PRODUCT (NETTING), FIBER ROLLS, HOT MIX ASPHALT (TYPE A), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, TEMPORARY SUPPORT, STEEL SOLDIER PILE (W 14 X 90), STEEL SOLDIER PILE (W 18 X 130), STEEL SOLDIER PILE (2 - W 18 X 130), 30" DRILLED HOLE, 36" DRILLED HOLE, FURNISH STEEL PILING (HP 10 X 57), DRIVE STEEL PILE (HP 10 X 57), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING, PRESTRESSING CAST-IN-PLACE CONCRETE, (F) - STRUCTURAL CONCRETE, BRIDGE FOOTING, (F) - STRUCTURAL CONCRETE, BRIDGE, (F) - STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), (F) - STRUCTURAL CONCRETE, GUTTER, (F) - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ), MINOR CONCRETE (MINOR STRUCTURE), DRILL AND BOND DOWEL, JOINT SEAL (MR 1/2"), JOINT SEAL (MR 2"), (F) - BAR REINFORCING STEEL (BRIDGE), (F) - BAR REINFORCING STEEL (BRIDGE, EPOXY COATED), (F) - BAR REINFORCING STEEL (GALVANIZED), (F) - BAR REINFORCING STEEL (GUTTER), (F) - HEADED BAR REINFORCEMENT, (F) - TIMBER LAGGING, CLEAN AND PAINT STEEL SOLDIER PILING, PUBLIC SAFETY PLAN, RAPID SETTING CONCRETE (PATCH), REMOVE ASPHALT CONCRETE SURFACING, REMOVE UNSOUND CONCRETE, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, (F) - PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL, BRIDGE REMOVAL (PORTION), LOCATION A, BRIDGE REMOVAL (PORTION), LOCATION B, 24" CORRUGATED STEEL PIPE (.109" THICK), 18" CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK), 18" ENTRANCE TAPER, 18" ANCHOR ASSEMBLY, 36" CORRUGATED STEEL PIPE INLET (.109" THICK), 14" WELDED STEEL PIPE CASING (BRIDGE), REMOVE ENTRANCE TAPER, REMOVE CULVERT (EA), REMOVE PIPE (LF), REMOVE DOWNDRAIN (EA), REMOVE INLET, ENGINEERED BANKLINE MATERIAL TYPE III, ENGINEERED STREAMBED MATERIAL, ENGINEERED BANKLINE MATERIAL (TYPE IV), (F) - MISCELLANEOUS IRON AND STEEL, PREPARE AND STAIN CONCRETE, STAIN GALVANIZED SURFACES (LF), REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), PAVEMENT MARKER (RETROREFLECTIVE-RECESSED), MILEPOST MARKER, MARKER (CULVERT), TREATMENT BEST MANAGEMENT PRACTICE MARKER, ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), (F) - CONCRETE BARRIER (TYPE 60MD MODIFIED), (F) - CABLE RAILING, (F) - CABLE RAILING (MODIFIED), TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE CRASH CUSHION SYSTEM, (F) - CALIFORNIA ST-75 BRIDGE RAIL (MODIFIED), REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3), REMOVE THERMOPLASTIC TRAFFIC STRIPE, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), MODIFYING INTERCONNECTION CONDUIT AND CABLE, MOBILIZATION ALL ITEMS CAN BE BID IN FULL OR PARTIAL QUANTITIES.
Requirements: Plans for this project are available for review at the office of Golden State Bridge, Inc. 3701 Mallard Drive, Benicia, CA 94510 between the hours of 8:00 and 5:00 pm. The plans can be also be downloaded for free at http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php. If you would like the Plans and Specs emailed, please send your request to David Riccitiello at dave@gsbridge.com. Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $400 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html. We are an Equal Opportunity Employer
Date posted: 11/30/2022
Contractor: Myers & Sons Construction, LLC Contact: Mike Lewis
Address: 45 Morrison Avenue Sacramento, CA 95838
Phone: 916-283-9950 Fax: 916-614-9520 Email: mlewis@myers-sons.com
Services needed: LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE SIGNAL SYSTEMS (EA), TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY FLASHING BEACON, ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (DAY), NATURAL RESOURCE PROTECTION PLAN, FISH PROTECTION, INVASIVE SPECIES CONTROL, BIRD AND BAT EXCLUSION DEVICES, CONTRACTOR SUPPLIED ARBORIST, HYDROACOUSTIC MONITORING, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROOTWADS, ROADWAY EXCAVATION, SHOULDER BACKING, (F) - STRUCTURE EXCAVATION (BRIDGE), (F) - STRUCTURE EXCAVATION (TYPE D), (F) - STRUCTURE EXCAVATION (SOLDIER PILE WALL), (F) - STRUCTURE BACKFILL (BRIDGE), (F) - STRUCTURE BACKFILL (SOLDIER PILE WALL), (F) - CONCRETE BACKFILL (SOLDIER PILE WALL), (F) - LEAN CONCRETE BACKFILL, SOIL AMENDMENT, PACKET FERTILIZER, PLANT (GROUP A), ROOTWAD REVETMENT, PLANT (GROUP U), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, TEMPORARY IRRIGATION SYSTEM, (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 6" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDRAULIC BIOTIC GROWTH MEDIUM, FIBER REINFORCED MATRIX, ROLLED EROSION CONTROL PRODUCT (NETTING), FIBER ROLLS, HOT MIX ASPHALT (TYPE A), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, TEMPORARY SUPPORT, STEEL SOLDIER PILE (W 14 X 90), STEEL SOLDIER PILE (W 18 X 130), STEEL SOLDIER PILE (2 - W 18 X 130), 30" DRILLED HOLE, 36" DRILLED HOLE, FURNISH STEEL PILING (HP 10 X 57), DRIVE STEEL PILE (HP 10 X 57), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING, PRESTRESSING CAST-IN-PLACE CONCRETE, (F) - STRUCTURAL CONCRETE, BRIDGE FOOTING, (F) - STRUCTURAL CONCRETE, BRIDGE, (F) - STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), (F) - STRUCTURAL CONCRETE, GUTTER, (F) - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ), MINOR CONCRETE (MINOR STRUCTURE), DRILL AND BOND DOWEL, JOINT SEAL (MR 1/2"), JOINT SEAL (MR 2"), (F) - BAR REINFORCING STEEL (BRIDGE), (F) - BAR REINFORCING STEEL (BRIDGE, EPOXY COATED), (F) - BAR REINFORCING STEEL (GALVANIZED), (F) - BAR REINFORCING STEEL (GUTTER), (F) - HEADED BAR REINFORCEMENT, (F) - TIMBER LAGGING, CLEAN AND PAINT STEEL SOLDIER PILING, PUBLIC SAFETY PLAN, RAPID SETTING CONCRETE (PATCH), REMOVE ASPHALT CONCRETE SURFACING, REMOVE UNSOUND CONCRETE, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, (F) - PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL, BRIDGE REMOVAL (PORTION), LOCATION A, BRIDGE REMOVAL (PORTION), LOCATION B, 24" CORRUGATED STEEL PIPE (.109" THICK), 18" CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK), 18" ENTRANCE TAPER, 18" ANCHOR ASSEMBLY, 36" CORRUGATED STEEL PIPE INLET (.109" THICK), 14" WELDED STEEL PIPE CASING (BRIDGE), REMOVE ENTRANCE TAPER, REMOVE CULVERT (EA), REMOVE PIPE (LF), REMOVE DOWNDRAIN (EA), REMOVE INLET, ENGINEERED BANKLINE MATERIAL TYPE III, ENGINEERED STREAMBED MATERIAL, ENGINEERED BANKLINE MATERIAL (TYPE IV), (F) - MISCELLANEOUS IRON AND STEEL, PREPARE AND STAIN CONCRETE, STAIN GALVANIZED SURFACES (LF), REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), PAVEMENT MARKER (RETROREFLECTIVE-RECESSED), MILEPOST MARKER, MARKER (CULVERT), TREATMENT BEST MANAGEMENT PRACTICE MARKER, ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), (F) - CONCRETE BARRIER (TYPE 60MD MODIFIED), (F) - CABLE RAILING, (F) - CABLE RAILING (MODIFIED), TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE CRASH CUSHION SYSTEM, (F) - CALIFORNIA ST-75 BRIDGE RAIL (MODIFIED), REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3), REMOVE THERMOPLASTIC TRAFFIC STRIPE, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), MODIFYING INTERCONNECTION CONDUIT AND CABLE, MOBILIZATION
Requirements: ** All items are open for bid, including items of work normally performed by Myers & Sons Construction. Quotations will be broken down into comparable packages as reasonably necessary. Myers & Sons Construction will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages. Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, and current insurance meeting Myers & Sons Construction's requirements. Subcontractors will be required to sign the standard Myers & Sons Construction, LLC Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com. Plans and Specs can also be downloaded through http://ppmoe.dot.ca.gov/des/oe/weekly-ads/plans.php?id=01-0C5004 and http://ppmoe.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=01-0C5004. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers & Sons Construction, LLC will work cooperatively with all qualified firms seeking work on this project. Myers & Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers & Sons Construction, LLC is an equal opportunity employer.
Date posted: 12/05/2022
Contractor: Ghilotti Construction Company, Inc. Contact: Annette Conley
Address: 246 Ghilotti Avenue Santa Rosa, CA 95407
Phone: 707-585-1221 Fax: 707-585-1601 Email: annette@ghilotti.com
Services needed: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for quotes including, but not limited to, the following scopes of work: CONSTRUCTION AREA SIGNS, ROADSIDE SIGNS, SIGNAL & LIGHTING, TRAFFIC CONTROL SYSTEM, COLD PLANE, FABRIC & OILS, CLEAR & GRUB, TEMPORARY K RAIL, DEMOLITION / BRIDGE REMOVAL, ROADWAY EXCAVATION, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, LANDSCAPE / HIGHWAY PLANTING, HYDROSEED, IRRIGATION, EROSION CONTROL, ASPHALT PAVING, PILE DRIVING, CIDH PILES, STRUCTURE CONCRETE, MINOR CONCRETE STRUCTURE, JOINT SEAL, REINFORCING STEEL, METAL BEAM GUARD RAILING, METAL RAILING, CONCRETE BARRIER, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, BIOLOGIST, CONTRACTOR SUPPLIED ARBORIST, ROOTWADS, TIMBER LAGGING, CLEAN & PAINT STEEL SOLDIER PILING, RAPID SETTING CONCRETE (PATCH), FURNISH POLYESTER CONCRETE OVERLAY, ENGINEERED STREAMBED MATERIAL, PREPARE & STAIN CONCRETE, SWPPP PLANNING, STORM DRAIN (UNDERGROUND), STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Requirements: Mr. Jim Petnic (707/585-1221 or jimp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: GCC may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. GCC will pay bond premiums up to 1 ½% of contract cost. GCC is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be viewed or purchased through local plan rooms, builder’s exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project. Project Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Subcontract Requirements: Subcontractors will be required to execute GCC’s written subcontract. A copy is available for inspection on GCC’s website: https://www.ghilotti.com/subcontractors/ and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. Union: GCC is a UNION CONTRACTOR. Non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements. Insurance: • All bids must include compliance with GCC’s Addendum A, located at: http://www.ghilotti.com/wp-content/uploads/2020/10/Addendum-A Revised-8-2020.pdf • CGL limits of $5,000,000/occurrence at a minimum (depending on scope) • GCC and Owner must be named as additional insured on CGL & Auto policies (form CG 20 10 11/85 or equivalent) • Completed operations coverage • Primary and non-contributory wording • Waiver of subrogation on both CGL & WC policies • Any additional costs to meet this requirement must be included in bid pricing. ***WE ARE AN EQUAL OPPORTUNITY EMPLOYER***
Date posted: 12/12/2022
Contractor: Steelhead Constructors JV Contact: Kelly Knight
Address: 2940 Innsbruck Drive Redding
Phone: 530-226-6400 Fax: 530-226-6401 Email: kelly@steelheadconstructors.com
Services needed: We are requesting quotes from all qualified subcontractors and suppliers, including all certified DVBE/DBE/MBE/WBE/MB subcontractors. We are soliciting quotes for (including but not limited to): LEAD COMPLIANCE PLAN LEVEL 2 CRITICAL PATH METHOD SCHEDULE TIME-RELATED OVERHEAD (LS) DISPUTE RESOLUTION BOARD ON-SITE MEETING HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS DEVELOP WATER SUPPLY CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM TYPE III BARRICADE TEMPORARY PAVEMENT MARKING (PAINT) TEMPORARY TRAFFIC STRIPE (PAINT) CHANNELIZER (SURFACE MOUNTED) PORTABLE SIGNAL SYSTEMS (EA) TEMPORARY BARRIER SYSTEM PORTABLE CHANGEABLE MESSAGE SIGN (LS) TEMPORARY FLASHING BEACON ALTERNATIVE TEMPORARY CRASH CUSHION JOB SITE MANAGEMENT PREPARE STORM WATER POLLUTION PREVENTION PLAN RAIN EVENT ACTION PLAN STORM WATER SAMPLING AND ANALYSIS DAY STORM WATER ANNUAL REPORT MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) TEMPORARY COVER TEMPORARY CHECK DAM TEMPORARY DRAINAGE INLET PROTECTION TEMPORARY FIBER ROLL TEMPORARY SILT FENCE TEMPORARY CONSTRUCTION ENTRANCE STREET SWEEPING TEMPORARY CONCRETE WASHOUT WATER QUALITY SAMPLING AND ANALYSIS DAY WATER QUALITY MONITORING REPORT WATER QUALITY ANNUAL REPORT TEMPORARY CREEK DIVERSION SYSTEMS TREATED WOOD WASTE CONTRACTOR-SUPPLIED BIOLOGIST (DAY) NATURAL RESOURCE PROTECTION PLAN FISH PROTECTION INVASIVE SPECIES CONTROL BIRD AND BAT EXCLUSION DEVICES CONTRACTOR SUPPLIED ARBORIST HYDROACOUSTIC MONITORING TEMPORARY HIGH-VISIBILITY FENCE CLEARING AND GRUBBING (LS) ROOTWADS ROADWAY EXCAVATION SHOULDER BACKING (F) - STRUCTURE EXCAVATION (BRIDGE) (F) - STRUCTURE EXCAVATION (TYPE D) (F) - STRUCTURE EXCAVATION (SOLDIER PILE WALL) (F) - STRUCTURE BACKFILL (BRIDGE) (F) - STRUCTURE BACKFILL (SOLDIER PILE WALL) (F) - CONCRETE BACKFILL (SOLDIER PILE WALL) (F) - LEAN CONCRETE BACKFILL SOIL AMENDMENT PACKET FERTILIZER PLANT (GROUP A) ROOTWAD REVETMENT PLANT (GROUP U) PLANT ESTABLISHMENT WORK WOOD MULCH FOLIAGE PROTECTOR TEMPORARY IRRIGATION SYSTEM (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) (F) - 6" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) MOVE-IN/MOVE-OUT (EROSION CONTROL) HYDRAULIC BIOTIC GROWTH MEDIUM FIBER REINFORCED MATRIX ROLLED EROSION CONTROL PRODUCT (NETTING) FIBER ROLLS HOT MIX ASPHALT (TYPE A) TACK COAT COLD PLANE ASPHALT CONCRETE PAVEMENT TEMPORARY SUPPORT STEEL SOLDIER PILE (W 14 X 90) STEEL SOLDIER PILE (W 18 X 130) STEEL SOLDIER PILE (2 - W 18 X 130) 30" DRILLED HOLE 36" DRILLED HOLE FURNISH STEEL PILING (HP 10 X 57) DRIVE STEEL PILE (HP 10 X 57) 24" CAST-IN-DRILLED-HOLE CONCRETE PILING PRESTRESSING CAST-IN-PLACE CONCRETE (F) - STRUCTURAL CONCRETE, BRIDGE FOOTING (F) - STRUCTURAL CONCRETE, BRIDGE (F) - STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) (F) - STRUCTURAL CONCRETE, GUTTER (F) - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) MINOR CONCRETE (MINOR STRUCTURE) DRILL AND BOND DOWEL JOINT SEAL (MR 1/2") JOINT SEAL (MR 2") (F) - BAR REINFORCING STEEL (BRIDGE) (F) - BAR REINFORCING STEEL (BRIDGE, EPOXY COATED) (F) - BAR REINFORCING STEEL (GALVANIZED) (F) - BAR REINFORCING STEEL (GUTTER) (F) - HEADED BAR REINFORCEMENT (F) - TIMBER LAGGING CLEAN AND PAINT STEEL SOLDIER PILING PUBLIC SAFETY PLAN RAPID SETTING CONCRETE (PATCH) REMOVE ASPHALT CONCRETE SURFACING REMOVE UNSOUND CONCRETE PREPARE CONCRETE BRIDGE DECK SURFACE FURNISH POLYESTER CONCRETE OVERLAY (F) - PLACE POLYESTER CONCRETE OVERLAY BRIDGE REMOVAL BRIDGE REMOVAL (PORTION), LOCATION A BRIDGE REMOVAL (PORTION), LOCATION B 24" CORRUGATED STEEL PIPE (.109" THICK) 18" CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK) 18" ENTRANCE TAPER 18" ANCHOR ASSEMBLY 36" CORRUGATED STEEL PIPE INLET (.109" THICK) 14" WELDED STEEL PIPE CASING (BRIDGE) REMOVE ENTRANCE TAPER REMOVE CULVERT (EA) REMOVE PIPE (LF) REMOVE DOWNDRAIN (EA) REMOVE INLET ENGINEERED BANKLINE MATERIAL TYPE III ENGINEERED STREAMBED MATERIAL ENGINEERED BANKLINE MATERIAL (TYPE IV) (F) - MISCELLANEOUS IRON AND STEEL PREPARE AND STAIN CONCRETE STAIN GALVANIZED SURFACES (LF) REMOVE PAVEMENT MARKER GUARD RAILING DELINEATOR PAVEMENT MARKER (RETROREFLECTIVE) PAVEMENT MARKER (RETROREFLECTIVE-RECESSED) MILEPOST MARKER MARKER (CULVERT) TREATMENT BEST MANAGEMENT PRACTICE MARKER ROADSIDE SIGN - ONE POST MIDWEST GUARDRAIL SYSTEM (STEEL POST) VEGETATION CONTROL (MINOR CONCRETE) (F) - CONCRETE BARRIER (TYPE 60MD MODIFIED) (F) - CABLE RAILING (F) - CABLE RAILING (MODIFIED) TRANSITION RAILING (TYPE WB-31) END ANCHOR ASSEMBLY (TYPE SFT-M) ALTERNATIVE IN-LINE TERMINAL SYSTEM ALTERNATIVE CRASH CUSHION SYSTEM (F) - CALIFORNIA ST-75 BRIDGE RAIL (MODIFIED) REMOVE GUARDRAIL 6" THERMOPLASTIC TRAFFIC STRIPE THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3) REMOVE THERMOPLASTIC TRAFFIC STRIPE 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT) MODIFYING INTERCONNECTION CONDUIT AND CABLE MOBILIZATION Steelhead will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units.
Requirements: Email all quotes to: estimating@steelheadconstructors.com Steelhead Constructors JV (Steelhead) will be bidding the referenced project as a prime contractor. Plans and specifications for this project may be viewed on the Caltrans website, where you Opted-In, at your local builder’s exchange and are available for review in our office. If you require additional information regarding the requirements of the contract, please don’t hesitate to call our office. In order that we may give your bid maximum consideration, please supply us with an email prior to the bid date describing the scope of your work. Steelhead will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units. Steelhead is an Equal Employment Opportunity Employer. We encourage and actively solicit proposals from DVBE, DBE, MBE, WBE, DBE and MB subcontractors and suppliers on all our projects. All qualified DVBE, DBE, MBE, WBE, and MB subcontractors must be registered and certified by the California Department of Transportation. Steelhead is signatory to Operating Engineers, Laborers, Carpenters and Cement Masons Unions. All subcontractors must possess a current contractor’s license, insurance, and workers’ compensation coverage meeting Steelhead’s requirements and will be required to sign Steelhead’s Subcontract Agreement. Performance and payment bonds up to 100% may be required for the full amount of the subcontract price. Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials or services, establishing delivery schedules, etc., which may be required by the Owner. Please contact our office and advise us if you are interested in this project. When submitting any bid on a public works project, please prominently include, on your quote, your California Contractors License Number and Department of Industrial Relations Number. More information regarding California Contractors License and DIR Numbers can be found at http://www.cslb.ca.gov/ and http://www.dir.ca.gov/Public-Works/PublicWorks.html Sincerely, STEELHEAD CONSTRUCTORS JV Kelly Knight The Estimating Department 530-226-6400 ask for Kelly Knight. Please email quotes to estimating@steelheadconstructors.com
Date posted: 12/20/2022
Contractor: Stewart Engineering Inc. Contact: Keith Stewart
Address: 5323 Eastside Road Redding, Ca 96001
Phone: 530-244-8464 Fax: 530-244-8462 Email: kstewart@sebinc.net
Services needed: Stewart Engineering Inc. is requesting quotes from all qualified subcontractors and suppliers including certified UDBE/DBE/SBE/DVBE for all or any part of the following items: LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE SIGNAL SYSTEMS (EA), TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY FLASHING BEACON, ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (DAY), NATURAL RESOURCE PROTECTION PLAN, FISH PROTECTION, INVASIVE SPECIES CONTROL, BIRD AND BAT EXCLUSION DEVICES, CONTRACTOR SUPPLIED ARBORIST, HYDROACOUSTIC MONITORING, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROOTWADS, ROADWAY EXCAVATION, SHOULDER BACKING, (F) - STRUCTURE EXCAVATION (BRIDGE), (F) - STRUCTURE EXCAVATION (TYPE D), (F) - STRUCTURE EXCAVATION (SOLDIER PILE WALL), (F) - STRUCTURE BACKFILL (BRIDGE), (F) - STRUCTURE BACKFILL (SOLDIER PILE WALL), (F) - CONCRETE BACKFILL (SOLDIER PILE WALL), (F) - LEAN CONCRETE BACKFILL, SOIL AMENDMENT, PACKET FERTILIZER, PLANT (GROUP A), ROOTWAD REVETMENT, PLANT (GROUP U), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, TEMPORARY IRRIGATION SYSTEM, (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 6" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDRAULIC BIOTIC GROWTH MEDIUM, FIBER REINFORCED MATRIX, ROLLED EROSION CONTROL PRODUCT (NETTING), FIBER ROLLS, HOT MIX ASPHALT (TYPE A), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, TEMPORARY SUPPORT, STEEL SOLDIER PILE (W 14 X 90), STEEL SOLDIER PILE (W 18 X 130), STEEL SOLDIER PILE (2 - W 18 X 130), 30" DRILLED HOLE, 36" DRILLED HOLE, FURNISH STEEL PILING (HP 10 X 57), DRIVE STEEL PILE (HP 10 X 57), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING, PRESTRESSING CAST-IN-PLACE CONCRETE, (F) - STRUCTURAL CONCRETE, BRIDGE FOOTING, (F) - STRUCTURAL CONCRETE, BRIDGE, (F) - STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), (F) - STRUCTURAL CONCRETE, GUTTER, (F) - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ), MINOR CONCRETE (MINOR STRUCTURE), DRILL AND BOND DOWEL, JOINT SEAL (MR 1/2"), JOINT SEAL (MR 2"), (F) - BAR REINFORCING STEEL (BRIDGE), (F) - BAR REINFORCING STEEL (BRIDGE, EPOXY COATED), (F) - BAR REINFORCING STEEL (GALVANIZED), (F) - BAR REINFORCING STEEL (GUTTER), (F) - HEADED BAR REINFORCEMENT, (F) - TIMBER LAGGING, CLEAN AND PAINT STEEL SOLDIER PILING, PUBLIC SAFETY PLAN, RAPID SETTING CONCRETE (PATCH), REMOVE ASPHALT CONCRETE SURFACING, REMOVE UNSOUND CONCRETE, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, (F) - PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL, BRIDGE REMOVAL (PORTION), LOCATION A, BRIDGE REMOVAL (PORTION), LOCATION B, 24" CORRUGATED STEEL PIPE (.109" THICK), 18" CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK), 18" ENTRANCE TAPER, 18" ANCHOR ASSEMBLY, 36" CORRUGATED STEEL PIPE INLET (.109" THICK), 14" WELDED STEEL PIPE CASING (BRIDGE), REMOVE ENTRANCE TAPER, REMOVE CULVERT (EA), REMOVE PIPE (LF), REMOVE DOWNDRAIN (EA), REMOVE INLET, ENGINEERED BANKLINE MATERIAL TYPE III, ENGINEERED STREAMBED MATERIAL, ENGINEERED BANKLINE MATERIAL (TYPE IV), (F) - MISCELLANEOUS IRON AND STEEL, PREPARE AND STAIN CONCRETE, STAIN GALVANIZED SURFACES (LF), REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), PAVEMENT MARKER (RETROREFLECTIVE-RECESSED), MILEPOST MARKER, MARKER (CULVERT), TREATMENT BEST MANAGEMENT PRACTICE MARKER, ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), (F) - CONCRETE BARRIER (TYPE 60MD MODIFIED), (F) - CABLE RAILING, (F) - CABLE RAILING (MODIFIED), TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE CRASH CUSHION SYSTEM, (F) - CALIFORNIA ST-75 BRIDGE RAIL (MODIFIED), REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3), REMOVE THERMOPLASTIC TRAFFIC STRIPE, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), MODIFYING INTERCONNECTION CONDUIT AND CABLE, MOBILIZATION Stewart Engineering Inc. is an Equal Opportunity Employer and will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units as reasonably necessary.
Requirements: Stewart Engineering Inc. will be bidding the referenced project as a prime contractor. Plans and specifications for this project may be viewed at your local builders exchange and are available for review in our office. If you require additional information regarding the requirements of the contract, please don’t hesitate to contact our office. In order that we may give your bid maximum consideration, please supply us with a fax or email letter prior to the bid describing the scope of your work. Stewart Engineering is signatory to the Labors Union Local 185 and Operators Union Local 3. We encourage and actively solicit proposals from DBE subcontractors and suppliers on all our projects. All qualified DBE subcontractors must be registered and certified by the California Department of Transportation. Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials or services etc., which may be required by the Owner. Subcontractors must possess a current contractor’s license, worker’s compensation and insurance coverage during the entire length of the prime contract. All Subcontractors will be required to sign our standard Subcontract Agreement (AGC Long Form Standard Subcontract). If you require an advance copy to of the subcontract to look over please contact our office. You must be registered and provide your Department of Industrial Relations number.
Date posted: 12/21/2022
Contractor: MCM Construction, Inc. Contact: Rona Caldwell
Address: 6413 32nd Street North Highlands, CA 95660
Phone: 916-334-1221 Fax: 916-334-5384 Email: bids@mcmconstruction.com
Services needed: SUB-QUOTES ARE BEING REQUESTED FOR VARIOUS ITEMS OF WORK INCLUDING, BUT NOT LIMITED TO: Arborist, Biologist, Bird & Bat Exclusion Devices, CIDH, Clean & Paint Steel, Clearing & Grubbing, Concrete Barrier, Concrete Pumping, Construction Area Signs, Crash Cushion, Demolition, Electrical, Fencing, Grading, Guard Railing, Hazardous Waste Removal (treated wood waste), Hydroacoustic Monitoring, Hydroseed, Joint Seal, K-Rail, Landscaping, Lead Compliance Plan, Metal Railing, Minor Concrete, Misc. Metals, Paint & Stain Concrete, Pavement Marker, Paving – HMA, Piping, Polyester Concrete Overlay, Prestressing, Ready Mix, Rebar, Roadside Signs, Roadway Excavation, Signal & Lighting, Steel Pile/Pipe Pile, Striping & Marking, Structural Concrete Quality Control, SWPPP, Temp. & Perm. Erosion Control, Timber Lagging, Traffic Control, Trucking, Underground Water Supply, etc.
Requirements: MCM will assist in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials, as well as any related assistance in services. Plans and specifications are available in our office by emailing bids@mcmconstruction.com or at http://ppmoe.dot.ca.gov/des/oe/weekly-ads/plans.php?id=01-0C5004. Quotations will be broken down into comparable packages as reasonably necessary. Every Subcontractor is required to be registered with the State DIR to perform public work. Subcontractors must be prepared to furnish payment and performance bonds issued by a California admitted surety that is acceptable to MCM. MCM will reimburse the Subcontractor for the premium costs of the bonds at standard premium rates not to exceed 1.5%. Subcontractor must possess current general commercial liability insurance and workers compensation insurance per Owner’s requirements. MCM’s listing of a subcontractor in its bid to the public agency is not to be construed as an acceptance of all of the Subcontractor’s conditions or exceptions included with Subcontractor’s price quotes. MCM is signatory to the following unions: Operating Engineers, Carpenters, Laborers, and Cement Masons. Please contact MCM at (916) 334-1221 for assistance in responding to this solicitation.
Date posted: 01/05/2023
Contractor: Viking Construction Company Contact: Randy Jenco
Address: PO Box 1508 Rancho Cordova, CA 95741
Phone: 916-852-5530 Fax: 916-852-5533 Email: rjenco@vikingbridges.com
Services needed: Prepare Lead Compliance Plan, Construction Area Signs, Traffic Control (Flagging), Temporary Striping, Furnish Portable Signal Systems, Furnish Flashing Beacons and Message Boards, Furnish Temporary Barrier System and Crash Cushions, Prepare Storm Water Pollution Control Plan, Water Pollution Control and Reports, Street Sweeping, Biologist, Arborist, Hydroacoustic Monitoring, Temporary Fence, Clearing, Excavation and Backfill, Planting and Irrigation, Erosion Control, Grading and Paving, Cold Plane Asphalt Pavement, Trucking, 30” Drilled Hole, Furnish Steel Piling, Drive Steel Pile, 24” Cast-In-Drilled-Hole Concrete Piling, Prestressing Concrete, Furnish Readymix Concrete, Drill and Bond Dowels, Joint Seal, Bar Reinforcing Steel, Furnish Timber Lagging, Clean and Paint Steel Soldier Piling, Polyester Concrete Overlay, Bridge Removal, Bridge Removal (Portion), Drainage, Engineered Streambed Work, Furnish Miscellaneous Iron, Prepare and Stain Concrete, Markers and Roadside Signs, Metal Beam Guard Railing, Vegetation Control, Concrete Barrier (60MD), Cable Railing, Crash Cushion System, Steel Bridge Rail (ST-75), Remove Guardrail, Striping, Rumble Strip, Modifying Interconnection Conduit and Cable
Requirements: Plans and specifications may be reviewed at our office located at 11315 Sunrise Gold Circle, Suite A, Rancho Cordova, at your local Builder’s Exchange, or may be obtained from the Owner. Contact the below if you need further direction in this regard. Each subcontractor may be required to submit faithful performance and payment bonds. Contact the below if you need more information or help in obtaining bonds, lines of credit, insurance, necessary equipment, supplies and materials or technical assistance. If you are interested in quoting, please contact me at (916) 852-5530. Quotes are due in our office by 12:00 (noon) on bid day.
Date posted: 01/13/2023
Contractor: Mercer-Fraser Company Contact: Mark Benzinger
Address: PO Box 1006 Eureka, CA 95502
Phone: 707-443-6371 Fax: 707-443-0277 Email: ccoppini@mercerfraser.com
Services needed: LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMP PAVEMENT MARKING, TEMP TRAFFIC STRIPE, CHANNELIZER, PORTABLE SIGNAL SYSTEMS, TEMP BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, TEMP FLASHING BEACON, TEMP CRASH CUSHION, PREP SWPPP, RAIN EVENT ACTION PLAN, STORM WATER (SAMPLING, ANALYSIS, REPORTING), TEMP HYDRAULIC MULCH, TEMP COVER, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP SILT FENCE, TEMP CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, WATER QUALITY (SAMPLING, ANALYSIS, REPORTING), TEMP CREEK DIVERSION SYSTEMS, TREATED WOOD WASTE, BIOLOGIST, NATURAL RESOURCE PROTECTION PLAN, FISH PROTECTION, INVASIVE SPECIES CONTROL, BIRD & BAT EXCLUSION DEVICES, ARBORIST, HYDROACOUSTIC MONITORING, TEMP HIGH-VIZ FENCE, CLEAR & GRUB, ROOTWADS, ROADWAY EXCAVATION, SHOULDER BACKING, STRUCTURE EXCAVATION, TRUCTURE BACKFILL, CONCRETE BACKFILL, SOIL AMENDMENT, PACKET FERTILIZER, ROOTWAD REVETMENT, PLANT (GROUP A & U)PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, TEMP IRRIGATION SYSTEM, PLASTIC PIPE, EROSION CONTROL, HYDRAULIC BIOTIC GROWTH MEDIUM, FIBER REINFORCED MATRIX, ROLLED EROSION CONTROL PRODUCT, FIBER ROLLS, HOT MIX ASPHALT (TYPE A), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, TEMP SUPPORT, STEEL SOLDIER PILE, DRILLED HOLE, FURNISH & DRIVE STEEL PILE, CAST-IN-DRILLED-HOLE CONCRETE PILING, PRESTRESSING CAST-IN-PLACE CONCRETE, STRUCTURAL CONCRETE, MINOR CONCRETE, DRILL & BOND DOWEL, JOINT SEAL, BAR REINFORCING STEEL, HEADED BAR REINFORCEMENT, TIMBER LAGGING, CLEAN & PAINT STEEL SOLDIER PILING, PUBLIC SAFETY PLAN, RAPID SETTING CONCRETE, REMOVE ASPHALT CONCRETE SURFACING, REMOVE UNSOUND CONCRETE, PREP CONCRETE BRIDGE DECK SURFACE, FURNISH & PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL, CORRUGATED STEEL PIPE, CORRUGATED STEEL PIPE DOWNDRAIN, ENTRANCE TAPER, ANCHOR ASSEMBLY, CORRUGATED STEEL PIPE INLET, WELDED STEEL PIPE CASING, REMOVE ENTRANCE TAPER, REMOVE CULVERT, REMOVE PIPE, REMOVE DOWNDRAIN, REMOVE INLET, ENGINEERED STREAMBED MATERIAL, ENGINEERED BANKLINE MATERIAL, MISC IRON & STEEL, PREP & STAIN CONCRETE, STAIN GALVANIZED SURFACES, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, MILEPOST MARKER, MARKERS, TREATMENT BEST MANAGEMENT PRACTICE MARKER, ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL, CONCRETE BARRIER, CABLE RAILING, TRANSITION RAILING, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE CRASH CUSHION SYSTEM, CALIFORNIA ST-75 BRIDGE RAIL, REMOVE GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING, THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC TRAFFIC STRIPE, RUMBLE STRIP, MODIFYING INTERCONNECTION CONDUIT & CABLE
Requirements: Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.