Search Results: Planholders

Listing for all primes seeking assistance with project 04-0Y3904.

4 records found



Contractor: Ghilotti Construction Company, Inc. Contact: Annette Conley
Address: 246 Ghilotti Avenue Santa Rosa, CA 95407
Phone: 707-585-1221 Fax: 707-585-1601 Email: annette@ghilotti.com
Services needed: INVITATION TO BID Owner: Department of Transportation (CALTRANS) Bid Date & Time: 5/14/24 @ 2:00 PM Project: #04-0Y3904 - Hwy. 262 In Alameda County In Fremont From Route 880 To Route 680 Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for construction (Cold plane AC pavement and place RHMA-G.) on Hwy. 262 In Alameda County In Fremont From Route 880 To Route 680 (04-Ala-262-R0.0/R1.1). Quotes requested include, but are not limited to, the following scopes of work: FABRIC & OILS, MATERIAL SUPPLY, CAS, TRAFFIC CONTROL, RESET-ADJ RDWY ITEMS, COLD PLANE, EROSION CONTROL, ASPHALT PAVING, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, SIGNAL & LIGHTING (ELECTRICAL), SWEEPER, & TRUCKER. Engineer's Estimate: $1,050,000 / DVBE Goal: 3%/SBE Goal: 5% / 40 WD / $4,200 per day LD. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Requirements: Mr. Thomas Smith (707/585-1221 or tom@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: GCC may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. GCC will pay bond premiums up to 1 ½% of contract cost. GCC is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be downloaded for free through the Department of Transportation via their website at https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=04-0Y3904. Plans may also be viewed or purchased through local plan rooms, builder’s exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project. Project Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Subcontract Requirements: Subcontractors will be required to execute GCC’s written subcontract. A copy is available for inspection on GCC’s website: https://www.ghilotti.com/subcontractors/ and/or can be provided upon written request prior to bid submission. By submitting your bid, you agree that all Inconsistent Terms and Conditions contained in your bid shall be disregarded and the Terms and Conditions of the GCC standard subcontract shall control. “Inconsistent Terms and Conditions” is defined as any terms and conditions that may be attached to your bid other than the price and scope that are inconsistent or conflict with the Terms and Conditions of GCC’s standard subcontract. Union: GCC is a UNION CONTRACTOR. Non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements. Insurance: • All bids must include compliance with GCC’s Addendum A, located at: https://www.ghilotti.com/wp-content/uploads/2022/12/Addendum-A-Revised-3-2022.pdf • CGL limits of $5,000,000/occurrence at a minimum (depending on scope) • GCC and Owner must be named as additional insured on CGL & Auto policies (form CG 20 10 11/85 or equivalent) • Completed operations coverage • Primary and non-contributory wording • Waiver of subrogation on both CGL & WC policies • Any additional costs to meet this requirement must be included in bid pricing. ***WE ARE AN EQUAL OPPORTUNITY EMPLOYER*** GHILOTTI CONSTRUCTION COMPANY, INC. 246 GHILOTTI AVENUE SANTA ROSA, CA 95407 PH: (707) 585-1221 * FX: (707) 585-1601
Date posted: 04/22/2024
Contractor: O.C. Jones & Sons, Inc. Contact: Jason Martin
Address: 1520 Fourth Street Berkeley, CA 94710
Phone: 510-526-3424 Fax: 510-526-0990 Email: jmartin@ocjones.com
Services needed: REQUEST FOR DVBE & SBE SUBCONTRACTORS AND SUPPLIERS We are soliciting quotes for (including but not limited to): Trucking, Temporary and Permanent Hydroseed and Erosion Control Measures, QC/QA Testing, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Portable Changeable Message Sign, Temporary Radar Speed Feedback Sign, Water Pollution Control Program, Sweeping, Noise Monitoring, Geosynthetic Pavement Interlayer (Paving Grid), Tack Coat, Cold Plane AC, Adjust Utilities, Pavement Marker, Striping & Marking, Maintain Existing Traffic Management System Elements During Construction, Modify Signal & Lighting Systems, and Construction Materials
Requirements: Jason Martin (510-809-3432 jmartin@ocjones.com) is the estimator on this project and is available to provide assistance or answer questions regarding the project scope of work including bid requirements, break out of bid items, plan or spec interpretation, bonding or insurance requirements, and other bid assistance. Plans and specs are available to review at our Berkeley office or can be sent out via Building Connected. Plans are also available under the Advertised Projects tab at the Caltrans website at: http://ppmoe.dot.ca.gov/des/oe/contract-awards-services.html. PDF format quotes should be emailed to the estimator or faxed to 510-526-0990 prior to 12:00 PM on the date of the bid. Quotes from DVBE & SBE Subcontractors, Suppliers and Truckers are highly encouraged. OCJ is willing to breakout any portion of work to encourage DVBE & SBE participation. Subcontractors must possess a current DIR, Contractors License, and insurance and workers compensation coverage including waiver of subrogation. OCJ may require Performance and Payment bonds on subcontracts. OCJ will pay the bond premium up to 2% of the contract value. Please contact OCJ for any assistance required by your firm in obtaining bonding or insurance. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors. Visit the California Access to Capital Program Financing Solutions website for additional resources for your small business - http://www.calbizfinance.org/cal_cert_biz_program.html. OCJ is available to help obtain necessary equipment, material and/or supplies. All subcontractors are required to execute OC Jones’ standard subcontract agreement, comply with all insurance requirements, and name OCJ as additional insured. Copies of our agreement and insurance requirements are available upon request. OCJ is a Union contractor, and we are signatory to the Operating Engineers, Laborers, Teamsters, and Carpenters. OCJ is an Equal Opportunity Employer.
Date posted: 04/23/2024
Contractor: Q.A. Constructors, Inc. Contact: Shawn N. Simmons
Address: 850 S. Van Ness Ave. San Francisco, CA. 94110
Phone: 209-747-3595 Fax: Email: ss@qaccorp.com
Services needed: Q.A. Constructors, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE/UDBE/SBE/WBE/DVBE firms for all items of work pertaining to, and associated with services, materials etc., generally associated with or otherwise accepted and approved as standard items of work for your firm related to applicable bid items on this project.
Requirements: Q.A. Constructors, Inc. is an Equal Opportunity Employer. Q.A. Constructors, Inc. (Q.A.C.) is signatory with the Operators, and Laborers Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Q.A.C. will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Q.A.C. will assist in obtaining bonding, lines of credit, insurance, necessary equipment, supplies, and materials. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Q.A.C. Q.A.C. will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable contractor’s license, be registered with the Department of Industrial Relations, and possess insurance and workers compensation coverage meeting Q.A.C. and Caltrans minimum requirements and will be required to sign the standard Q.A.C. Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
Date posted: 04/27/2024
Contractor: O'Grady Paving Inc. Contact: Craig Young
Address: 2513 Wyandotte St. Mountain View, CA 94043
Phone: 650-966-1926 Fax: 650-966-1946 Email: craig@ogradypaving.com
Services needed: O'Grady Paving, Inc. is requesting quotes from all qualified subcontractors and suppliers including DBE/SBE/DVBE firms for the following types of work, including but not limited to: Lead Plan, Construction Area Signs, Traffic Control, WPCP, Sweeping, Paving Grid, AC Grinding, Striping, and Electrical
Requirements: O'Grady Paving, Inc. is a signatory to Operating Engineers and Laborers Unions. 100% Performance and Payment Bonds may be required for the full amount of the subcontract price. O'Grady Paving, Inc. will pay for bond premium up to 2%. Subcontractors must possess current insurance and worker's compensation coverage. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. O'Grady Paving, Inc. is an equal opportunity employer.
Date posted: 04/29/2024