Search Results: Planholders

Listing for all primes seeking assistance with project 07-276104.

8 records found



Contractor: Peterson Chase General Engineering Construction Inc. Contact: Kali Goglanian
Address: 16351 Construction Circle West Irvine, CA 92606
Phone: 949-252-0441 Fax: 949-252-0266 Email: bids@petersonchase.com
Services needed: Peterson-Chase General Engineering Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Remove Concrete (Cy), Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Structure Excavation, Structure Backfill, Roadside Clearing, Cultivation, Soil Amendment, Relocate Irrigation Controller, Slow-Release Fertilizer, Plant (Group F), Plant (Group H), Plant (Group A), Plant (Group B), Plant (Group U), Plant Establishment Work, Wood Mulch, Check And Test Existing Irrigation Facilities, Remove Irrigation Facility, Control And Neutral Conductors, 1" Remote Control Valve, 1 1/2" Remote Control Valve, 1/2" Drip Irrigation Tubing, Automatic Flush Valve, Air Relief Valve, Certify Existing Backflow Preventers, Tree Well Sprinkler Assembly, Riser Sprinkler Assembly (Gear Driven), Riser Sprinkler Assembly, Drip Valve Assembly, 1" Plastic Pipe (Schedule 40) (Supply Line), 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Class 315) (Supply Line), 3" Plastic Pipe (Class 315) (Supply Line), Ball Valve, 8" Corrugated High Density Polyethylene Pipe Conduit, Compost (Cy), Incorporate Materials, Class 3 Aggregate Base (Cy), Lean Concrete Base, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type E), Tack Coat, Remove Asphalt Concrete Dike, Structural Concrete, Minor Concrete (Minor Structure), Bar Reinforcing Steel, 15" Plastic Pipe, 18" Reinforced Concrete Pipe, 24" Reinforced Concrete Pipe, Remove Pipe (Lf), Rock Slope Protection (Facing, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Remove Concrete Curb (Lf), Miscellaneous Metal, Miscellaneous Metal (Inclined Screen), Chain Link Fence (Type Cl-6), 4' Chain Link Gate (Type Cl-6), 12' Chain Link Gate (Type Cl-6), Remove Chain Link Fence, Remove Gate, Cable Railing, Modifying Existing Electrical System. Please email your quotes to Bids@petersonchase.com
Requirements: Peterson-Chase General Engineering Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Dick Vogels at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting Caltrans’ requirements and will be required to sign the standard Peterson-Chase GEC., Inc. Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 16351 Construction Circle West, Irvine, CA 92606, between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Peterson-Chase GEC., Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Peterson Chase General Engineering Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 08/14/2019
Contractor: Griffith Company Contact: Christian Martinez
Address: 3050 E. Birch Street Brea, CA 92821
Phone: 714-984-5500 Fax: 714-854-7843 Email: cmartinez@griffithcompany.net
Services needed: Griffith Company is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: TRAFFIC CONTROL, LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, JOB SITE MANAGEMENT, SWPPP, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS, STORM WATER ANNUAL REPORT, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, REMOVE CONCRETE, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING, ROADWAY EXCAVATION, STRUCTURE EXCAVATION, STRUCTURE BACKFILL,ROADSIDE CLEARING, WOOD MULCH, 8” CORRUGATED HDPE PIPE CONDUIT, CLASS 4 AGGREGATE BASE, LEAN CONCRETE BASE, HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE (TYPE E), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, MINOR CONCRETE, REBAR, 15” PLASTIC PIPE, 24” RCP, REMOVE PIPE, ROCK SLOPE PROTECTION, REMOVE CONCRETE CURB, MISC. METAL, FENCING AND GATES, CABLE RAILING, MODIFY EXISTING ELECTRICAL SYSTEM Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages
Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer.
Date posted: 08/20/2019
Contractor: OHL USA, Inc. Contact: Hamed Soltani
Address: 1920 Main Street, Suite 310 Irvine, Ca, 92614
Phone: 949-242-4432 Fax: 949-231-1255 Email: Hamed.Soltani@ohlna.com
Services needed: OHL USA, Inc. is seeking sub-bids from certified DBE subcontractors, sub-consultants, material and/or equipment suppliers for all areas of work, including but not limited to those listed: Aggregate Base, Cable Railing, Chain Link Fence, Class 3 Aggregate Base, Clear and Grub, Concrete Curb & Sidewalk-Miscellaneous, Concrete Structure, Construction Area Signs, Crash Cushion, Equipment Rental, Erosion Control, Highway Planting, Hot Mix Asphalt, Irrigation, Landscape, Lead Compliance Plan, Minor Concrete Structure, Miscellaneous Metals, Modify Existing Electrical System, Place Hot Mix Asphalt, Plastic Pipe, QA/QC, Reinforced Concrete Pipe, Reinforcing Steel, Relocate Irrigation Controller, Remove Concrete, Roadside Clearing, Roadway Excavation, Rock Slope Protection, Sawcutting, Soil Amendment, Storm Water Pollution Plan, Street Sweeping, Structural Concrete, Structure Backfill, Structure Excavation, Survey, Tack Coat, Temporary Erosion Control, Temporary Fencing, Temporary High Visibility Fence, Traffic Control System, Water Truck.
Requirements: Compliance to Caltrans Standards and Special Provisions, including Buy America applies. 100% bonding may be required for all subcontractors. OHL is signatory to Operating Engineers, Laborers, Cement Masons and Carpenters Unions, non-signatory subcontractors will be required to sign an agreement for trades covered under OHL’s union agreements. Assistance available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials or related assistance or services and technical assistance. Flexible time frames for performance, delivery and breaking out portions of work into economically feasible packages to encourage participation may be discussed. Additional assistance is available through the City of Los Angeles Contractor Development and Bonding Program for more information visit www.LAConDev.com or call 213/258-3000. OHL USA, Inc. intends to conduct itself in “good faith” with all categories of disadvantaged, small, minority and women owned firms regarding participation on this project, therefore please send your certifications prior to quotes. Subcontractors are required to be registered with the Department of Industrial Relations (DIR), as required by Public Contract Code Section 1725.5, please furnish DIR Number with your quote submittal. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Plans & Specs are available at OHL offices from 7:00 am - 5:00 pm Monday through Friday at: 1920 MAIN ST. SUITE 310 IRVINE, CA 92614 Phone: (949) 242-4432 • Fax (949)231-1255/(949)231-1256 Or by using the dropbox link: https://www.dropbox.com/sh/eickmger822jb77/AACSkw0X-lSiwk3_NzQ7smTia?dl=0 OHL USA, Inc. is an AAE/EEO.
Date posted: 08/29/2019
Contractor: YAKAR Contact: Joseph
Address: 689 East San bernardio Rd Covina, CA 91723
Phone: 909-599-1612 Fax: 800-750-9094 Email: bid@yakarinc.com
Services needed: YAKAR is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE/DVBE firms for the following items of work including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, REMOVE CONCRETE (CY), TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, ROADSIDE CLEARING, CULTIVATION, SOIL AMENDMENT, RELOCATE IRRIGATION CONTROLLER, SLOW-RELEASE FERTILIZER, PLANT (GROUP F), PLANT (GROUP H), PLANT (GROUP A), PLANT (GROUP B), PLANT (GROUP U), PLANT ESTABLISHMENT WORK, WOOD MULCH, CHECK AND TEST EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, CONTROL AND NEUTRAL CONDUCTORS, 1" REMOTE CONTROL VALVE, 1 1/2" REMOTE CONTROL VALVE, 1/2" DRIP IRRIGATION TUBING, AUTOMATIC FLUSH VALVE, AIR RELIEF VALVE, CERTIFY EXISTING BACKFLOW PREVENTERS, TREE WELL SPRINKLER ASSEMBLY, RISER SPRINKLER ASSEMBLY (GEAR DRIVEN), RISER SPRINKLER ASSEMBLY, DRIP VALVE ASSEMBLY, 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), 3" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), BALL VALVE, 8" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, COMPOST (CY), INCORPORATE MATERIALS, CLASS 3 AGGREGATE BASE (CY), LEAN CONCRETE BASE, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE E), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, MINOR CONCRETE (MINOR STRUCTURE), BAR REINFORCING STEEL, 15" PLASTIC PIPE, 18" REINFORCED CONCRETE PIPE, 24" REINFORCED CONCRETE PIPE, REMOVE PIPE (LF), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), REMOVE CONCRETE CURB (LF), MISCELLANEOUS METAL, MISCELLANEOUS METAL (INCLINED SCREEN), CHAIN LINK FENCE (TYPE CL-6), 4' CHAIN LINK GATE (TYPE CL-6), 12' CHAIN LINK GATE (TYPE CL-6), REMOVE CHAIN LINK FENCE, REMOVE GATE, CABLE RAILING, MODIFYING EXISTING ELECTRICAL SYSTEM, & MOBILIZATION.
Requirements: Plans and Specifications (Contract documents) are available in electronic format at: Caltrans Website http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php under Advertised Projects. We can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, line of credit, insurance, equipment, supplies, materials or related assistance in services, please contact our office. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Caltrans requirements and may be required to sign YAKAR Subcontract Agreement. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. YAKAR is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color. creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. YAKAR intends to work cooperatively with all qualified firms seeking work on this project. Please use the following page to respond, indicating your interest in the project. This will aid in completing the good faith effort required for this project. If you have any questions or need any additional Information, please contact our office at (909)599-1612 or email bid@yakarinc.com Date posted: 8/30/2019
Date posted: 08/30/2019
Contractor: Powell Constructors, Inc. Contact: Joe
Address: 8555 Banana Avenue Fontana
Phone: 909-356-8880 Fax: 909-356-1299 Email: joe@powellconstructors.com
Services needed: Powell Constructors, Inc. is seeking quotes from all qualified subcontractors and suppliers including certified DBE firms. ALL BID ITEMS ARE OPEN FOR BID, including items of work normally performed by Powell Constructors, Inc. LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STORM WATER POLLUTION PREVENTION PLAN, SWPPP MATERIALS, STREET SWEEPING, REMOVE CONCRETE, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING, ROADWAY EXCAVATION, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, ROADSIDE CLEARING, CULTIVATION, SOIL AMENDMENT, SLOW-RELEASE FERTILIZER, LANDSCAPING, WOOD MULCH, IRRIGATION, COMPOST, INCORPORATE MATERIALS, CLASS 3 AGGREGATE BASE, LEAN CONCRETE BASE, HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, TACK COAT, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, MINOR CONCRETE (MINOR STRUCTURE), BAR REINFORCING STEEL, PLASTIC PIPE, REINFORCED CONCRETE PIPE, REMOVE PIPE, ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION FABRIC, REMOVE CONCRETE CURB, MISCELLANEOUS METAL, MISCELLANEOUS METAL (INCLINED SCREEN), FENCING, REMOVE CHAIN LINK FENCE, REMOVE GATE, CABLE RAILING, MODIFYING EXISTING ELECTRICAL SYSTEM, AND TRUCKING. Quotations will be broken down into comparable packages as reasonably necessary. Powell Constructors, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Union Signatory, 100% Payment and Performance Bonds from an accepted surety may be required. Powell Constructors, Inc. will reimburse subcontractor for bond premium up to 2%. Assistance in bonding, insurance, lines of credit or obtaining equipment, supplies, materials, or related assistance or services is available upon request. Subcontractors must possess a current contractor's license and provide General Liability, Auto and Worker's Compensation Insurance meeting the minimum requirements per the specifications. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. Powell Constructors, Inc. is an Equal Opportunity Employer and encourage DBE participation.
Date posted: 09/03/2019
Contractor: Marina Landscape, Inc Contact: Farzad Menhaji
Address: 3707 W. Garden Grove Blvd Orange
Phone: 714-620-7243 Fax: 714-935-1199 Email: fmenhaji@marinaco.com
Services needed: Marina Landscape Inc. is a construction firm bidding on the above listed project and seeking sub bids/quotes from qualified contractors, vendors, manufactures and suppliers, specifically those who are Certified DBE, for the following items of work that have been broken down and can be broken down further into economical feasible elements to assist the participation of DBE CONTRACTORS/VENDORS: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Remove Concrete (Cy), Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Structure Excavation, Structure Backfill, Roadside Clearing, Cultivation, Soil Amendment, Relocate Irrigation Controller, Slow-Release Fertilizer, Plant (Group F), Plant (Group H), Plant (Group A), Plant (Group B), Plant (Group U), Plant Establishment Work, Wood Mulch, Check And Test Existing Irrigation Facilities, Remove Irrigation Facility, Control And Neutral Conductors, 1" Remote Control Valve, 1 1/2" Remote Control Valve, 1/2" Drip Irrigation Tubing, Automatic Flush Valve, Air Relief Valve, Certify Existing Backflow Preventers, Tree Well Sprinkler Assembly, Riser Sprinkler Assembly (Gear Driven), Riser Sprinkler Assembly, Drip Valve Assembly, 1" Plastic Pipe (Schedule 40) (Supply Line), 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Class 315) (Supply Line), 3" Plastic Pipe (Class 315) (Supply Line), Ball Valve, 8" Corrugated High Density Polyethylene Pipe Conduit, Compost (Cy), Incorporate Materials, Class 3 Aggregate Base (Cy), Lean Concrete Base, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type E), Tack Coat, Remove Asphalt Concrete Dike, Structural Concrete, Minor Concrete (Minor Structure), Bar Reinforcing Steel, 15" Plastic Pipe, 18" Reinforced Concrete Pipe, 24" Reinforced Concrete Pipe, Remove Pipe (Lf), Rock Slope Protection (Facing, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Remove Concrete Curb (Lf), Miscellaneous Metal, Miscellaneous Metal (Inclined Screen), Chain Link Fence (Type Cl-6), 4' Chain Link Gate (Type Cl-6), 12' Chain Link Gate (Type Cl-6), Remove Chain Link Fence, Remove Gate, Cable Railing, Modifying Existing Electrical System. Marina Landscape Inc encourages all interested DBE firms to contact us at least 1 day prior to the bid due date to review with us your proposed scope of work.
Requirements: Marina Landscape is an equal opportunity employer and encourages the participation of all DBE subcontractors/vendors. Items listed above may be broken into feasible items to allow subcontractors/vendor a viable bid item. Subcontractors must possess a current active contractor's license, DIR number, general liability insurance, and workers compensation insurance. Payment and performance bond may be required for the full contract amount. Marina Landscape is signatory with the operating engineers and laborers, and pipefitters unions. Please contact us if you need assistance in obtaining bonding, insurance, necessary equipment, supplies, and/or materials. Plans and specifications may be viewed at our office at 3707 W. Garden Grove Blvd, Orange, CA 92868 *****THIS IS A Federal Wage PROJECT*****
Date posted: 09/10/2019
Contractor: Calpromax Engineering Contact: Estimator
Address: 650 N. Rose Dr.#186 Placentia
Phone: 714-573-4599 Fax: 714-459-7088 Email: calpromax@gmail.com
Services needed: Calpromax Engineering Inc (CEI)is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: TRAFFIC CONTROL, LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, JOB SITE MANAGEMENT, SWPPP, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS, STORM WATER ANNUAL REPORT, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, REMOVE CONCRETE, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING, ROADWAY EXCAVATION, STRUCTURE EXCAVATION, STRUCTURE BACKFILL,ROADSIDE CLEARING, WOOD MULCH, 8” CORRUGATED HDPE PIPE CONDUIT, CLASS 4 AGGREGATE BASE, LEAN CONCRETE BASE, HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE (TYPE E), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, MINOR CONCRETE, REBAR, 15” PLASTIC PIPE, 24” RCP, REMOVE PIPE, ROCK SLOPE PROTECTION, REMOVE CONCRETE CURB, MISC. METAL, FENCING AND GATES, CABLE RAILING, MODIFY EXISTING ELECTRICAL SYSTEM. CEI will work with interested subcontractors to identify opportunities to break down items into economically feasible packages to accomplish the target DBE goal set for this project.
Requirements: Project Plans and Specifications are available in electronic format at: Caltrans Website http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php under Advertised Projects. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. If you have any questions, need assistance in obtaining bonding, line of credit, insurance, equipment, supplies, materials or related assistance in services, please contact our office. Subcontractors must have a current contractor's license, insurance and worker's compensation coverage meeting Caltrans requirements and may be required to sign a subcontract Agreement with calpromax engineering. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. CEI is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color. creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. CEI intends to work cooperatively with all qualified firms seeking work on this project. If you have any questions or need any additional Information, please contact our office at the numbers above with this ad.
Date posted: 09/11/2019
Contractor: Westcoast Public Works Inc. Contact: MDJ
Address: 20058 Ventura Blvd, #318 Woodland Hills, CA, 91364
Phone: 818-256-9401 Fax: 818-332-4323 Email: marion@wcpwinc.com
Services needed: WestCoast Public Works, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Remove Concrete (Cy), Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Structure Excavation, Structure Backfill, Roadside Clearing, Cultivation, Soil Amendment, Relocate Irrigation Controller, Slow-Release Fertilizer, Plant (Group F), Plant (Group H), Plant (Group A), Plant (Group B), Plant (Group U), Plant Establishment Work, Wood Mulch, Check And Test Existing Irrigation Facilities, Remove Irrigation Facility, Control And Neutral Conductors, 1" Remote Control Valve, 1 1/2" Remote Control Valve, 1/2" Drip Irrigation Tubing, Automatic Flush Valve, Air Relief Valve, Certify Existing Backflow Preventers, Tree Well Sprinkler Assembly, Riser Sprinkler Assembly (Gear Driven), Riser Sprinkler Assembly, Drip Valve Assembly, 1" Plastic Pipe (Schedule 40) (Supply Line), 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Class 315) (Supply Line), 3" Plastic Pipe (Class 315) (Supply Line), Ball Valve, 8" Corrugated High Density Polyethylene Pipe Conduit, Compost (Cy), Incorporate Materials, Class 3 Aggregate Base (Cy), Lean Concrete Base, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type E), Tack Coat, Remove Asphalt Concrete Dike, Structural Concrete, Minor Concrete (Minor Structure), Bar Reinforcing Steel, 15" Plastic Pipe, 18" Reinforced Concrete Pipe, 24" Reinforced Concrete Pipe, Remove Pipe (Lf), Rock Slope Protection (Facing, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Remove Concrete Curb (Lf), Miscellaneous Metal, Miscellaneous Metal (Inclined Screen), Chain Link Fence (Type Cl-6), 4' Chain Link Gate (Type Cl-6), 12' Chain Link Gate (Type Cl-6), Remove Chain Link Fence, Remove Gate, Cable Railing, Modifying Existing Electrical System. Please email your quotes to marion@wcpwinc.com
Requirements: For any bid proposal submitted on or after March 1, 2015 and any contract for public works entered into on or after April 1, 2015, the following registration requirements apply: All Contractors or Subcontractor is required to be registered to perform public works pursuant to Section 1725.5 of the Public Contract Code (Section 1725.5?). No Contractor or Subcontractor shall be qualified to bid or, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public works, unless currently registered to perform public works pursuant to Section 1725.5. No bid shall be accepted nor any subcontract entered into without proof of the Subcontractors current registration to perform public work pursuant to Section 1725.5. "WestCoast Public Works, Inc.” (WCPW) is signatory to Laborers, and Cement Masons. 100% performance and payment bonds may be required for the full amount of subcontract price. WCPW will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting WCPW and Caltrans requirements. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. WCPW intends to work cooperatively with all qualified firms seeking work on this project. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with surety’s incremental or phased bonding, obtaining necessary equipment, supplies and/or materials that meets WCPW and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. A copy of the insurance requirements and agreement can be obtained by contacting the office at 888-646-6411. Plans and specifications are also available for viewing on Cal Trans Contractors Corner website, http://dot.ca.gov/hq/esc/oe/calendar/oe_bid_calendar.php, or by contacting our estimating department at (818) 256-9401 or marion@wcpwinc.com. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. WCPW is an equal opportunity employer. Office Phone: 888-646-6411. Please email or fax quotes NO LATER than 11:00am on bid day marion@wcpwinc.com or by fax (818) 332-4323. If you have any questions, please contact the project estimator at (818) 256-9401 or by email, marion@wcpwinc.com.
Date posted: 09/12/2019