Submit new inquiry for this projectInquiry #1: Please verify the seed rate for the Seed Mix used in Erosion Control (Type 2). Table on ECL-1 states Seed Mix 1 at 64 lb/ac, but the rate for Seed Mix 1 is 56 lb/ac.
Inquiry submitted 02/10/2023
Response #1:(BI#1)-Your inquiry has been received and is being reviewed.
Response posted 02/10/2023
Response #2:(BI#1)-Your attention is directed to Addendum No.1, issued on February 8, 2023. Please bid per the current contract documents.
Response posted 02/13/2023
Inquiry #2: Which dimension controls when 8x12 lagging is used? Is it the bottom 20 pieces, all the lagging below 1'9" above Ground Anchor Level 3, or all the pieces 27' and varies below the top of the Barrier Slab?
Inquiry submitted 02/16/2023
Response #1:(BI#2)-Your inquiry has been received and is being reviewed.
Response posted 02/16/2023
Response #2:(BI#2)-The bid opening date is 02/22/23. It is unlikely an addendum will be issued. Bid under the current contract bid documents.
Response posted 02/21/2023
Inquiry #3: How is the Permeable Material (limits shown on Sheet 74) at the Retaining Wall paid?
Inquiry submitted 02/16/2023
Response #1:(BI#3)-Your inquiry has been received and is being reviewed.
Response posted 02/16/2023
Response #2:(BI#3)-Permeable material are paid under item no. 14, 8†PERFORATED STEEL PIPE UNDERDRAIN (.064†THICK). Please refer to Section 68-2.02 of the standard specifications.
Response posted 02/21/2023
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.