Submit new inquiry for this projectInquiry #1: What is the scope of work for the column labeled minor concrete (misc construction) shown on plan sheet 185 (Q-3) that references sheet C-46, C-73, C-76, and C-77?
Inquiry submitted 10/14/2024
Response #1:(BI#1) - Your inquiry has been received and is being reviewed.
Response posted 10/14/2024
Response #2:(BI#1) - : An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1 dated October 30, 2024. Please bid per the current contract documents.
Response posted 10/30/2024
Inquiry #2: Please identify or provide a summary of quantities for bid item 61 (final pay 4" irrigation supply line).
Inquiry submitted 10/14/2024
Response #1:(BI#2) - Your inquiry has been received and is being reviewed.
Response posted 10/14/2024
Response #2:(BI#2) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1 dated October 30, 2024. Please bid per the current contract documents.
Response posted 10/30/2024
Inquiry #3: 1) There appears to be numerous instances of large trees within the alignment of the concrete work, underdrains, and storm drain throughout the project. This is most notable from Hollis Lane to Obermeyer Ave, but with other locations. We did not see a tree removal plan. Will these trees and stumps be removed before this project starts?
Inquiry submitted 10/22/2024
Response #1:(BI#3) - Your inquiry has been received and is being reviewed.
Response posted 10/22/2024
Response #2:(BI#3) - Your attention is directed to Standard Specifications section 17-2.03B. Please bid per current contract documents.
Response posted 10/24/2024
Inquiry #4: 2) Refer to sheet 94 C-70. The 4” Plastic Pipe Underdrains detail shows a permeable material backfill in the trench. What exactly is this permeable material and what size? Is it some kind of MA or popcorn slurry or other? And what does the trench look like for the 4” Plastic Pipe Schedule 40 Supply Line (under the driveways). Similar to the Underdrain detail?
Inquiry submitted 10/22/2024
Response #1:(BI#4) - Your inquiry has been received and is being reviewed.
Response posted 10/22/2024
Response #2:(BI#4) - (1) Refer to sheet 94 C-70. The 4” Plastic Pipe Underdrains detail shows a permeable material backfill in the trench. What exactly is this permeable material and what size? Is it some kind of MA or popcorn slurry or other?
Your attention is directed to Standard Specifications section 68-2.02F for permeable material. Please bid per the current contract documents.
(2) And what does the trench look like for the 4” Plastic Pipe Schedule 40 Supply Line (under the driveways). Similar to the Underdrain detail?
An addendum has been issued to address this part of the bidder inquiry. Please refer to Addendum No. 1 dated October 30, 2024. Please bid per the current contract documents.
Response posted 10/30/2024
Inquiry #5: During a site visit the ditch at Standish Ln was flowing full of water. The ditch by Archer Ave was dry. These ditches will need to be dry in order to do the box culverts and wing walls. Assuming this water comes from farming activities, will this be scheduled to be shutdown during construction? What is the schedule/timeframe of this shutdown? Or is the contractor expected to somehow divert this water flow? Please advise how this will be handled.
Inquiry submitted 10/23/2024
Response #1:(BI#5) - Your inquiry has been received and is being reviewed.
Response posted 10/23/2024
Response #2:(BI#5) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 3 dated November 6, 2024. Please bid per the current contract.
Response posted 11/07/2024
Inquiry #6: The "description" column for the underdrain summary of quantities table on plan sheet 87 (Q-5) does not match the noted callout descriptions on plan sheets 91 thru 93 (C-67 to C-69), i.e. 1 or 2 each for the 4" underdrain and supply lines, etc. Please correct the applicable descriptions so the summary of quantities and construction plans match.
Inquiry submitted 10/23/2024
Response #1:(BI#6) - Your inquiry has been received and is being reviewed.
Response posted 10/23/2024
Response #2:(BI#6) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1 dated October 30, 2024. Please bid per the current contract documents.
Response posted 10/30/2024
Inquiry #7: Special provision 1-1.01 states that there is a bid item for "water meter charges" and refers to section 5. There is no bid item for water meter charges and there is no section 5 provision for this. Please correct as applicable.
Inquiry submitted 10/24/2024
Response #1:(BI#7) - Your inquiry has been received and is being reviewed.
Response posted 10/24/2024
Response #2:(BI#7) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1 dated October 30, 2024. Please bid per the current contract documents.
Response posted 10/30/2024
Inquiry #8: There appears to be a discrepancy in the Item 81 quantities. Please confirm the quantities are a correct, thank you.
Inquiry submitted 10/27/2024
Response #1:(BI#8) - Your inquiry has been received and is being reviewed.
Response posted 10/28/2024
Response #2:(BI#8) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1 dated October 30, 2024. Please bid per the current contract documents.
Response posted 10/30/2024
Inquiry #9: In reference to Bid Item 99 - Adjust Inlet 3ea:
Sheet # 145 DQ-4 quantity chart shows 3 ea in the Sheet Total row but the column above that is blank. What Drainage System do they belong to, or Stationing location? Are they located in the road, off the road, in C&G or other concrete areas? Please Clarify.
Inquiry submitted 10/29/2024
Response #1:(BI#9) - Your inquiry has been received and is being reviewed.
Response posted 10/29/2024
Response #2:(BI#9) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 3 dated November 6, 2024. Please bid per the current contract documents.
Response posted 11/07/2024
Inquiry #10: Can you verify that the bid item quantity shown in item 0084 (F) Minor Concrete (Minor Structure is correct)?
Inquiry submitted 10/31/2024
Response #1:(BI#10) - Your inquiry has been received and is being reviewed.
Response posted 10/31/2024
Response #2:(BI#10) - The bid item quantity shown for Minor Concrete (Minor Structure) is correct. Please bid per current contract documents.
Response posted 11/05/2024
Inquiry #11: Standard 68-2.02F lists class 1, 2and 3 Permeable Material. 68-2.02F(1) has a sentence that says “Use Class 1 permeable material for underdrains unless the class or type of permeable material is specified in the special provisions”. 68-2.02F(3) shows gradations for Class 2. Can Class 2 Perm be accepted for this project for the underdrains? Or is just Class 1 Acceptable?
Inquiry submitted 11/01/2024
Response #1:(BI#11) - Your inquiry has been received and is being reviewed.
Response posted 11/01/2024
Response #2:(BI#11) - Only Class 1 permeable material is acceptable.
Response posted 11/01/2024
Inquiry #12: Item 117 - Chain Link Fence (Type CL-6) has as given quanity of 140 LF. There is CL-6 fence on plan sheets L-2 and L-4 that totals about 230 lineal feet. Please confirm the quanity of Bid Item #117
Inquiry submitted 11/05/2024
Response #1:(BI#12) - Your inquiry has been received and is being reviewed.
Response posted 11/05/2024
Response #2:(BI#12) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 3 dated November 6, 2024. Please bid per the current contract documents.
Response posted 11/07/2024
Inquiry #13: What bid item pays for the removal, handling, and disposal of asbestos cement pipe (ACP)?
Inquiry submitted 11/05/2024
Response #1:(BI#13) - Your inquiry has been received and is being reviewed.
Response posted 11/06/2024
Response #2:(BI#13) - Bid item 26 Asbestos Compliance Plan pays for the work associated with management of asbestos cement pipe. Please bid per current contract documents.
Response posted 11/06/2024
Inquiry #14: Please provide the asbestos survey report referenced in provision 14-11.17F.
Inquiry submitted 11/05/2024
Response #1:(BI#14) - Your inquiry has been received and is being reviewed.
Response posted 11/06/2024
Response #2:(BI#14) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #15: Please provide or identify the planting plan details for rock mulch.
Inquiry submitted 11/05/2024
Response #1:(BI#15) - Your inquiry has been received and is being reviewed.
Response posted 11/06/2024
Response #2:(BI#15) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #16: Please provide a daily stationary impact attenuator vehicle bid item for worker protection throughout the course of the project.
Inquiry submitted 11/05/2024
Response #1:(BI#16) - Your inquiry has been received and is being reviewed.
Response posted 11/06/2024
Response #2:(BI#16) - A bid item for daily stationary impact attenuator vehicle is not considered at this point. Please bid per current contract documents.
Response posted 11/07/2024
Inquiry #17: Per sheet PP-14, the match line on the right side of this sheet refers to sheet PP-15 for continuation. However, sheet PP-15 is not provided. Please clarify.
Inquiry submitted 11/07/2024
Response #1:(BI#17) - Your inquiry has been received and is being reviewed.
Response posted 11/07/2024
Response #2:(BI#17) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #18: According to specification section 20, the quotes for the flow sensor (20-2.05B), controller (20-2.06B(2)(a)), drip tubing (20-2.08B(4)), remote control valve (20-2.10B(10)(a)), drip remote control valve (20-2.10B(4)), bench (20-5.05B(2)), trash receptacle 20-5.05B(3)), and bike rack (20-5.05B(4)) are out of date. Please provide the updated quotes for these specified items or confirm that the quotes are still valid for bidding purposes.
Inquiry submitted 11/07/2024
Response #1:(BI#18) - Your inquiry has been received and is being reviewed.
Response posted 11/07/2024
Response #2:(BI#18) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 5 dated November 15, 2024. Please bid per the current contract documents.
Response posted 11/15/2024
Inquiry #19: Referring to sheets PP-6 and PP-7, some planters from stations 199+65 to 201+47 have a callout for rock mulch, however the symbol around the planters is shown as wood mulch. Please clarify.
Inquiry submitted 11/07/2024
Response #1:(BI#19) - Your inquiry has been received and is being reviewed.
Response posted 11/07/2024
Response #2:(BI#19) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #20: Referring to planting requirement #8 on sheet PL-1, the application rates are 3 CY per 1000 SQFT in all planting areas. However, planting legend table on the same sheet shows the application rates base on pound (lb) unit measure for slow-release fertilizer. Please clarify.
Inquiry submitted 11/07/2024
Response #1:(BI#20) - Your inquiry has been received and is being reviewed.
Response posted 11/07/2024
Response #2:(BI#20) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #21: According to section 20-2.06B(2)(a), the table shows a total of 13 cabinets and pedestals, however there are only two irrigation controllers. Please clarify.
Inquiry submitted 11/07/2024
Response #1:(BI#21) - Your inquiry has been received and is being reviewed.
Response posted 11/07/2024
Response #2:(BI#21) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 5 dated November 15, 2024. Please bid per the current contract documents.
Response posted 11/15/2024
Inquiry #22: Section 20-2.04C(3) shows “Install conductors in electrical conduit”. However, according to the irrigation plan, only conductors under paving/street have shown with a sleeve symbol. Confirm that conduit is only needed for conductors under paving/roadway. Otherwise, please advise.
Inquiry submitted 11/07/2024
Response #1:(BI#22) - Your inquiry has been received and is being reviewed.
Response posted 11/07/2024
Response #2:(BI#22) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 5 dated November 15, 2024. Please bid per the current contract documents.
Response posted 11/15/2024
Inquiry #23: Bid item #0153, 4" plastic pipe, will be installed under sidewalk. Confirm that sleeve is not required for this pipe. Otherwise, provide the size and material for sleeve, and also clarify which bid item is supposed to cover the related costs to sleeves.
Inquiry submitted 11/07/2024
Response #1:(BI#23) - Your inquiry has been received and is being reviewed.
Response posted 11/07/2024
Response #2:
Response posted 11/07/2024
Response #3:
Response posted 11/07/2024
Response #4:(BI#23) - Please refer to sheets 94 (C-70) and 187 (Q-5) of the contract plans. Bid per the current contract documents.
Response posted 11/13/2024
Inquiry #24: Regarding the water meters, clarify the size of the water main located under streets , for hot tapping purposes.
Inquiry submitted 11/07/2024
Response #1:(BI#24) - Your inquiry has been received and is being reviewed.
Response posted 11/07/2024
Response #2:(BI#24) - Your attention is directed to plan sheets no.147 to no.157 (Utility Plans) for water main information. Please bid per current contract documents.
Response posted 11/13/2024
Inquiry #25: Referring to detail 1-4" perforated PP underdrain in planting area on sheet C-70, 2”-24” depth is shown for permeable material. Clarify the depth of permeable material for bidding purposes, due to a significant difference.
Inquiry submitted 11/07/2024
Response #1:(BI#25) - Your inquiry has been received and is being reviewed.
Response posted 11/07/2024
Response #2:(BI#25) - Your attention is directed to sheet no. 25 to 46 (C-1 to C-22) and no. 91 to 93 (C-67 to C-69) of the contract plans for elevations required to determine the depth of permeable material. Please bid per current contract documents.
Response posted 11/13/2024
Inquiry #26: Good morning -
With all of the bidder inquires, would Cal Trans consider postponing this bid by a few weeks?
Thank you
Inquiry submitted 11/08/2024
Response #1:(BI#26) - Your inquiry has been received and is being reviewed.
Response posted 11/08/2024
Response #2:(BI#26) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #27: Please provide structure excavation & backfill bid items for the wingwalls and box culverts.
Inquiry submitted 11/08/2024
Response #1:(BI#27) - Your inquiry has been received and is being reviewed.
Response posted 11/08/2024
Response #2:(BI#27) - Your attention is directed to paragraph 2 of Section 51-1.01A of Standard Specifications. Please bid per current contract documents.
Response posted 11/08/2024
Inquiry #28: Please provide structure excavation & backfill bid items for the sidewalk retaining walls.
Inquiry submitted 11/08/2024
Response #1:(BI#28) - Your inquiry has been received and is being reviewed.
Response posted 11/08/2024
Response #2:(BI#28) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #29: Please confirm quantities for Item 74 Hot Mix Asphalt (Type A), we are seeing a underrun in this item.
Inquiry submitted 11/08/2024
Response #1:(BI#29) - Your inquiry has been received and is being reviewed.
Response posted 11/08/2024
Response #2:(BI#29) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #30: Regarding bid item no. 80 - Cold Plane Asphalt Concrete Pavement, please consider allowing traffic to travel on the milled surface for up 72 hours prior to RHMA paving. This will improve the smoothness and reduce the number of bump grinds.
Inquiry submitted 11/08/2024
Response #1:(BI#30) - Your inquiry has been received and is being reviewed.
Response posted 11/08/2024
Response #2:(BI#30) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #31: With Monday November 11th being a holiday and the number of unanswered bidder inquiries, please postpone the bid date two weeks to allow sufficient time for contractors and DBE subcontractors to prepare their bids.
Inquiry submitted 11/08/2024
Response #1:(BI#31) - Your inquiry has been received and is being reviewed.
Response posted 11/08/2024
Response #2:(BI#31) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #32: Please consider an allowance for traffic allowed to drive on milled surface. 48-72 hours would be preferred. This will improve project schedule and surface rideability.
Inquiry submitted 11/08/2024
Response #1:(BI#32) - Your inquiry has been received and is being reviewed.
Response posted 11/08/2024
Response #2:(BI#32) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #33: Plan sheet LI-1 shows detail W-08. Please confirm contactor is to install the backflow per caltrans standard detail and not city of Gridley detail W-08? Please advise.
Inquiry submitted 11/11/2024
Response #1:(BI#33) - Your inquiry has been received and is being reviewed.
Response posted 11/12/2024
Response #2:(BI#33) - Your attention is directed to sheet no. 274 of 274 of the contract plans for backflow installation.
Response posted 11/13/2024
Inquiry #34: Please consider allowing one or two 55 hour closure periods to reduce lanes to single lane traffic control in each direction to remove and replace the dig-outs. This would decrease the number of nights required and benefit the traveling public.
Inquiry submitted 11/11/2024
Response #1:(BI#34) - Your inquiry has been received and is being reviewed.
Response posted 11/12/2024
Response #2:(BI#34) - A 55-hr closure is not considered at this time. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #35: Is filter fabric required under rock mulch? Spec 20-5.03E(3) says place the rock such that no soil areas or filter fabric is exposed. Please advise if filter fabric is required.
Inquiry submitted 11/12/2024
Response #1:(BI#35) - Your inquiry has been received and is being reviewed.
Response posted 11/12/2024
Response #2:(BI#35) - Your attention is directed to section 20-5.03A(2) of the Standard Specifications. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #36: Can Caltrans please provide PPF files of the existing roadway so a proper smoothness analysis can be conducted prior to bidding?
Inquiry submitted 11/12/2024
Response #1:(BI#36) - Your inquiry has been received and is being reviewed.
Response posted 11/12/2024
Response #2:(BI#36) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 5 dated November 15, 2024. Please bid per the current contract documents.
Response posted 11/15/2024
Inquiry #37: There are sixteen (16) unanswered bidder inquiries the day before the bid, even if these are answered today, contractors and subcontractors need sufficient time to prepare and modify their bids. Please issue an addendum postponing the bid date as soon as possible.
Inquiry submitted 11/13/2024
Response #1:(BI#37) - Your inquiry has been received and is being reviewed.
Response posted 11/13/2024
Response #2:(BI#37) - An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 4 dated November 13, 2024. Please bid per the current contract documents.
Response posted 11/13/2024
Inquiry #38: Which bid item pays to perform the work noted and described as "backfill or native soil, un-compacted, free from pavement, base and construction debris" as shown on plan sheets 2 and 3 (typical cross sections X-1 and X-2)? A construction detail showing a 24" depth for this work is shown for the wood mulch planters on plan sheet 225 (LD-3) but no construction detail showing the depth for the rock mulch planters is provided. Does this work occur in the rock mulch planters only, wood mulch planters only, or both?
Please explain the intent and scope of this work in question and provide all pertinent details.
Inquiry submitted 11/15/2024
Response #1:(BI#38) - Your inquiry has been received and is being reviewed.
Response posted 11/15/2024
Response #2:(BI#38) - Please be aware due to the short time frame between when this inquiry was received and the bid opening, there may not be time to provide a response. If no additional response is posted, please bid per the current contract documents.
Response posted 11/19/2024
Inquiry #39: Per the inquiry #24 response (#2 ), Utility Plans sheets no.147 to no.157 were supposed to show water main information. However, those sheets do not show any information regarding size or material of water main. Please provide the missing information as they are needed for connection of service line ( hot tapping).
Inquiry submitted 11/19/2024
Response #1:(BI#39) - Your inquiry has been received and is being reviewed.
Response posted 11/19/2024
Inquiry #40: According to note 6 on sheet L-1, water main material is asbestos cement pipe at stations 203+82.68 & 207+16.23 for water meter (service line ) connection. However, specification section 77-2.02 shows water pipe is either PVC or ductile iron. Clarify the material of water main within the specified stations and also other locations that service line connection to water main is needed.
Inquiry submitted 11/19/2024
Response #1:(BI#40) - Your inquiry has been received and is being reviewed.
Response posted 11/19/2024
Inquiry #41: The specification section 20-2.04C(3) stated, “Install conductors in electrical conduit”. Conductors must not share the conduit with other pipes or wires. Clarify if all irrigation system conductors shall be installed inside electrical conduit regardless of their location whether or not they are under paved areas or within landscape areas.
Inquiry submitted 11/19/2024
Response #1:(BI#41) - Your inquiry has been received and is being reviewed.
Response posted 11/19/2024
Response #2:(BI#41) - Please follow section 20-2.04C (3) of the Special Provisions for all the locations. Please bid per the current contract documents.
Response posted 11/19/2024
Inquiry #42: Per addendum #4, sheet PL-1, planting requirements no.8 is related to slow-release fertilizer application during plant establishment and is asking for 3 CY of slow-release fertilizer per 1000 SF in all planting areas. This requirement most likely is for the organic amendment application and not slow-release fertilizer. If the project intend it to use slow-release fertilizer during plant establishment as we always see on Caltrans project, then the ratio on note no.8 should be adjusted to 3 Ib per 1000 SF or simply provide the amount of slow-release fertilizer per Ib on the chart like other Caltrans project. The current requirement is adding a huge and unnecessary cost to the project. Please revise the ratio or advise the bidders with further instructions/clarifications.
Inquiry submitted 11/19/2024
Response #1:(BI#42) - Your inquiry has been received and is being reviewed.
Response posted 11/19/2024
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.