Submit new inquiry for this projectInquiry #1: Per Section 30 Recycled Pavement, Subsection 30-5.03E Asphaltic Emulsion and Sand Cover, paragraph three, sentence two, "Place temporary painted traffic stripes and painted pavement markings used for temporary delineation." of the Standard Specifications. Will Caltrans please include a bid item for the temporary traffic stripes, since it is called out.
Inquiry submitted 04/21/2025
Response #1:(BI#1) - Your inquiry has been received and is being reviewed.
Response posted 04/21/2025
Response #2:(BI#1) - Your attention is directed to section 9-1.03 of the Standard Specifications. No bid item for temporary delineation will be added. Please bid per the current contract documents.
Response posted 04/30/2025
Inquiry #2: Will Caltrans consider changing the driveway paving from RHMA-G to HMA-A? The reason is because driveway paving requires a fair amount of handwork (raking, shoveling, etc.) and RHMA is not able to be worked by hand effectively whereas HMA-A can be hand worked. This is to ensure the smoothness and mat finish quality for both the mainline and driveway paving is not compromised. This would yield roughly 7700 tons of RHMA-G for mainline and 200 tons of HMA-A for driveways.
Inquiry submitted 05/01/2025
Response #1:(BI#2) - Your inquiry has been received and is being reviewed.
Response posted 05/01/2025
Response #2:(BI#2) - Please bid per the current contract documents.
Response posted 05/02/2025
Inquiry #3: Please confirm if the recycling agent for the PDR is to be emulsions or foamed asphalt.
Inquiry submitted 05/07/2025
Response #1:(BI#3) - Your inquiry has been received and is being reviewed.
Response posted 05/08/2025
Response #2:(BI#3) - Please be aware due to the short time frame between when this inquiry was received and the bid opening, there may not be time to provide a response. If no additional response is posted, please bid per the current contract documents.
Response posted 05/12/2025
Inquiry #4: Please confirm the quantity for Bid Item 13 – Shoulder Backing.
Inquiry submitted 05/08/2025
Response #1:(BI#4) - Your inquiry has been received and is being reviewed.
Response posted 05/08/2025
Response #2:(BI#4) - Please bid per the current contract documents.
Response posted 05/09/2025
Inquiry #5: Can the department revise the 25% SBE goal? This is an unachievable goal given the scope of work on this project.
Inquiry submitted 05/09/2025
Response #1:(BI#5) - Your inquiry has been received and is being reviewed.
Response posted 05/09/2025
Response #2:(BI#5) - Please bid per the current contract documents.
Response posted 05/13/2025
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.