Submit new inquiry for this projectInquiry #1: Bid item #0126 - 16' Chain Link Gate calls for 3 gates. We only find two (2 ea.) 16' wide gates and not the three as stated in the Bid Item Number. We did find two (2 ea.) of the 18' gates instead of the one (1 ea.) that is stated in the bid item. Looking at the Gate Quantiles on the Q-4 Summary of Quantities , the gate at "A1" 146+78.41 is called out as a 16' gate , but on plan sheet C-39 sheet, sheet number 79, it is called out as an 18' wide gate.
Please clarify if the gate shown at "A1" 146+78.41 is a 16' wide or a 18' wide gate. If the quantities for either gate changes, it may require a new Bid Item Schedule will be needed.
Please
Inquiry submitted 09/19/2023
Response #1:(BI#1)-Your inquiry has been received and is being reviewed.
Response posted 09/19/2023
Response #2:(BI#1)-An Addendum will be issued to clarify the BI#1
Response posted 09/22/2023
Inquiry #2: Good Afternoon
We need clarification on Bid item #84 - Chain Link Fence (TYPE CL-3, Vinyl-Clad) (MOD) fencing. We know the chain link fabric is PVC vinyl coated chain link fabric. We need to know if the posts and framework are also vinyl coated material or are they to be powder coated and not vinyl coated material like the chain link fabric. Please clarify.
Inquiry submitted 09/22/2023
Response #1:(BI#2)-Your inquiry has been received and is being reviewed.
Response posted 09/22/2023
Response #2:(BI#2)-Please we don’t have bid item Chain Link Fence (TYPE CL-3, Vinyl-Clad) (MOD) fencing on this project.
Bid item #84 is 45” x 29” is Elliptical Reinforced Concrete Pipe.
Response posted 09/22/2023
Inquiry #3: Good Afternoon
We need clarification on Bid item #84 - Chain Link Fence (TYPE CL-3, Vinyl-Clad) (MOD) fencing. We know the chain link fabric is PVC vinyl coated chain link fabric. We need to know if the posts and framework are also vinyl coated material or are they to be powder coated and not vinyl coated material like the chain link fabric. Please clarify.
Inquiry submitted 09/22/2023
Response #1:(BI#3)-Your inquiry has been received and is being reviewed.
Response posted 09/22/2023
Response #2:(BI#3)-Please we don’t have bid item Chain Link Fence (TYPE CL-3, Vinyl-Clad) (MOD) fencing on this project.
Bid item #84 is 45” x 29” is Elliptical Reinforced Concrete Pipe.
Response posted 09/22/2023
Inquiry #4: What color is the CL-3 chain link fence in item #84. Please clarify the color of the vinyl chain link fence..
Inquiry submitted 09/22/2023
Response #1:(BI#4)-Your inquiry has been received and is being reviewed.
Response posted 09/22/2023
Response #2:(BI#4)-Please Bid item #84 is 45” x 29” is Elliptical Reinforced Concrete Pipe.
Response posted 09/28/2023
Inquiry #5: ITEM #146 MIDWEST GUARDRAIL , steel post:
Plan Q-7, 237 of 299, Midwest Guardrail Quantity Chart indicates a Type 12C Layout for the 3rd run @ "A1" 155+_Lt., with a WB-31, AILTS(TL3) & a Buried Post End. Plan L-9, 21 of 299, shows a WB-31 & an EAA-SFTM.
What is correct?
Inquiry submitted 09/28/2023
Response #1:(BI#5)-Your inquiry has been received and is being reviewed.
Response posted 09/28/2023
Response #2:(BI#5)-An addendum has been issued in response to the Bidder Inquiry.
Response posted 10/14/2023
Inquiry #6: ITEM #154, CONCRETE BARRIER, TRANSITION:
I do not find this Item on the Layout Plans, Construction Details, or Quantity sheets.
What are the details and location of this work?
Inquiry submitted 09/28/2023
Response #1:(BI#6)-Your inquiry has been received and is being reviewed.
Response posted 09/28/2023
Response #2:(BI#6)-An Addendum has been issued in response to the bidder inquiry.
Response posted 10/14/2023
Inquiry #7: The DGN Files provided in the supplemental info do not have elevations. Please provide CAD files with existing topo and design (elevations).
Inquiry submitted 09/29/2023
Response #1:(BI#7)-Your inquiry has been received and is being reviewed.
Response posted 09/29/2023
Response #2:(BI#7)-The provided files in Supplemental Info have elevations. Design elevations are provided in the 2D cross-sections (DGN & PDF format), and the 3D information for the existing ground and design (proposed) surfaces are in the XML files.
If you disagree, please provide more specific information or which CAD file ?
Response posted 10/03/2023
Inquiry #8: The DGN Files provided in the supplemental info do not have elevations. Please provide CAD files with existing topo and design (elevations).
Inquiry submitted 09/29/2023
Response #1:(BI#8)-Your inquiry has been received and is being reviewed.
Response posted 09/29/2023
Response #2:(BI#8)-The provided files in Supplemental Info have elevations. Design elevations are provided in the 2D cross-sections (DGN & PDF format), and the 3D information for the existing ground and design (proposed) surfaces are in the XML files.
If you disagree, please provide more specific information or which CAD file ?
Response posted 10/03/2023
Inquiry #9: The DGN Files provided in the supplemental info do not have elevations. Please provide CAD files with existing topo and design (elevations).
Inquiry submitted 09/29/2023
Response #1:(BI#9)-Your inquiry has been received and is being reviewed.
Response posted 09/29/2023
Response #2:(BI#9)-The provided files in Supplemental Info have elevations. Design elevations are provided in the 2D cross-sections (DGN & PDF format), and the 3D information for the existing ground and design (proposed) surfaces are in the XML files.
If you disagree, please provide more specific information or which CAD file ?
Response posted 10/03/2023
Inquiry #10: Please provide a construction detail for the driveways between A1 line station 135 and 193. Is the intent to only overlay the driveways with 0.10' RHMA-O or cold plane 0.20' and place 0.20' RHMA-G / 0.10' RHMA-O?
Inquiry submitted 10/05/2023
Response #1:(BI#10)-Your inquiry has been received and is being reviewed.
Response posted 10/05/2023
Response #2:(BI#10)-An addendum will be issued in response to the Bidder Inquiry.
Response posted 10/06/2023
Response #3:(BI#10)-Please refer to Addendum 2, dated October 20, 2023.
Response posted 10/24/2023
Inquiry #11: Please verify the quantity for bid item no. 56, Compost. Total on ECQ-1 for Compost is 551.25 CY but when you total all the compost quantities the total comes to 667.5 CY .
Inquiry submitted 10/12/2023
Response #1:(BI#11)-Your inquiry has been received and is being reviewed.
Response posted 10/12/2023
Response #2:(BI#11)-Please refer to Addendum 2, dated October 20, 2023.
Response posted 10/24/2023
Inquiry #12: Caltrans Standard Plan P1 note 5 states "For joint layout at intersections, see Project Plans." The Project Plans do not include joint layouts for the JPCP at either roundabout intersection. Please provide.
Inquiry submitted 10/13/2023
Response #1:(BI#12)-Your inquiry has been received and is being reviewed.
Response posted 10/13/2023
Response #2:(BI#12)-Please refer to Addendum 2, dated October 20, 2023.
Response posted 10/24/2023
Inquiry #13: Please provide a detail for the various driveways and access road turnouts so that we can determine the pavement structural section for each.
Inquiry submitted 10/16/2023
Response #1:(BI#13)-Your inquiry has been received and is being reviewed.
Response posted 10/16/2023
Response #2:(BI#13)-Please refer to addendum #1 issued on 10/12/2023 and contract documents.
Response posted 10/17/2023
Inquiry #14: Where, and for what scope of work, will bid item 39 TEMPORARY CREEK DIVERSION SYSTEMS be used?
Inquiry submitted 10/17/2023
Response #1:(BI#14)-Your inquiry has been received and is being reviewed.
Response posted 10/17/2023
Response #2:(BI#14)-Item 0039 (bid item 131201) temporary creek diversion systems is not shown on the plans. Per 401 permit requirements attached in the Information handout, Caltrans Standard Specifications should be followed.
The stormwater professional QSD for the contractor is responsible for determining location and timing for implementation of temporary creek diversion system.
Attention is directed to special provisions 13-12, which includes specifications for constructing, maintaining, reconstructing, and removing temporary creek diversion system.
Response posted 10/17/2023
Inquiry #15: Please review the bid quantity for item 59 HOT MIX ASPHALT (TYPE A). It appears as though the 0.25' HMA under the JPCP in pavement structural section 7 was not accounted for in the summary of quantities.
Inquiry submitted 10/17/2023
Response #1:(BI#15)-Your inquiry has been received and is being reviewed.
Response posted 10/17/2023
Response #2:(BI#15)-Please refer to Addendum 2, dated October 20, 2023.
Response posted 10/24/2023
Inquiry #16: When is item 152 CONCRETE BARRIER (TYPE 60M) to be constructed? The staging plans do not indicate when this barrier is to be constructed in the median.
Inquiry submitted 10/17/2023
Response #1:(BI#16)-Your inquiry has been received and is being reviewed.
Response posted 10/17/2023
Response #2:(BI#16)-Please see note 5 on sheet SC-29 of the contract plans.Please refer to Standard plan A76A and A76B for details.
Response posted 10/18/2023
Inquiry #17: The information handout is showing rock needing to be excavated that will require blasting on the project. Please provide the Rock Excavation (Controlled Blasting) bid item so the contractor has an avenue to be paid for any blasting on the project.
Inquiry submitted 10/17/2023
Response #1:(BI#17)-Your inquiry has been received and is being reviewed.
Response posted 10/18/2023
Response #2:(BI#17)-Please refer to Addendum 2, dated October 20, 2023.
Response posted 10/24/2023
Inquiry #18: Will the state provide traffic charts describing how long the contractor is allowed to stop traffic for any blasting operations on the project?
Inquiry submitted 10/17/2023
Response #1:(BI#18)-Your inquiry has been received and is being reviewed.
Response posted 10/18/2023
Response #2:(BI#18)-Please bid per the current contract documents.
Response posted 10/24/2023
Inquiry #19: In which stage does the state want the grind and overlay work to be constructed?
Inquiry submitted 10/17/2023
Response #1:(BI#19)-Your inquiry has been received and is being reviewed.
Response posted 10/18/2023
Response #2:(BI#19)-Please refer to addendum 3, dated October 24, 2023.
Response posted 10/24/2023
Inquiry #20: Work item number 1 on plan sheet SC-1 says to excavate and stockpile topsoil. There is no indication on the stage 1 plans where the contractor is to get said topsoil or stockpile the material. Please clarify.
Inquiry submitted 10/17/2023
Response #1:(BI#20)-Your inquiry has been received and is being reviewed.
Response posted 10/18/2023
Response #2:(BI#20)-Please refer to Addendum 2, dated October 20, 2023.
Response posted 10/24/2023
Inquiry #21: Please provide a traffic control chart that allows the contractor to keep only 1 lane open 24 hours x 7 days/week for both northbound and southbound during Stage 7 construction. The two 55-hour closures per Chart K6 is unreasonable time to complete all of the work required for Stage 7.
Inquiry submitted 10/18/2023
Response #1:(BI#21)-Your inquiry has been received and is being reviewed.
Response posted 10/18/2023
Response #2:(BI#21)-Please refer to addendum 3, dated October 24, 2023
Response posted 10/24/2023
Inquiry #22: According to the bid item list, #54 is Hydroseed HBGM, but there isn't a seed mix listed for this item on the EC Plans. Please advice what seed mix this item needs.
Inquiry submitted 10/18/2023
Response #1:(BI#22)-Your inquiry has been received and is being reviewed.
Response posted 10/18/2023
Response #2:(BI#22)-Please refer to Addendum 2, dated October 20, 2023.
Response posted 10/24/2023
Inquiry #23: There is existing PCC pavement northbound & southbound between Sta 130 and 132 that is not shown on the typical cross sections. Please provide a concrete pavement removal bid item and identify all locations and sectional thicknesses where PCC pavement exists.
Inquiry submitted 10/18/2023
Response #1:(BI#23)-Your inquiry has been received and is being reviewed.
Response posted 10/19/2023
Response #2:(BI#23)-Please bid per the current contract documents. Attention is directed to the plan sheet E2 and EQ-1.
Response posted 10/24/2023
Inquiry #24: Please provide the quantity of trees to removed.
Inquiry submitted 10/19/2023
Response #1:(BI#24)-Your inquiry has been received and is being reviewed.
Response posted 10/19/2023
Response #2:(BI#24)-Please refer to section 17-2.03 of the Standard Specifications.
Response posted 10/24/2023
Inquiry #25: We did not see answer for Inquiry #1, asking how many 16' and 18' gates are on the project to price. Will another Addendum be issued to answer the question in inquiry #1?
Please clarify how many 16' and 18' gates are in the project and if needed a new corrected Bid Schedule.
.
Inquiry submitted 10/19/2023
Response #1:(BI#25)-Your inquiry has been received and is being reviewed.
Response posted 10/19/2023
Response #2:(BI#25)-Please see addendum #1, plan sheet C-39.
Response posted 10/19/2023
Inquiry #26: Low Mountian Region requires the rebar for the 60M and 60MA Roadway Barrier to be epoxy coated. Please confirm.
Inquiry submitted 10/20/2023
Response #1:(BI#26)-Your inquiry has been received and is being reviewed.
Response posted 10/20/2023
Response #2:(BI#26)-Please refer to section 52-2.02 of the Standard Specifications.
Response posted 10/24/2023
Inquiry #27: The information handout geotechnical report states the in-situ material contains naturally-occurring asbestos (NOA). The quantity of NOA on the project can not be ascertained from the information provided so please include a bid item to handle & dispose NOA.
Inquiry submitted 10/20/2023
Response #1:(BI#27)-Your inquiry has been received and is being reviewed.
Response posted 10/20/2023
Response #2:(BI#27)-NOA exists between PM 7.2/7.5 under the NOA subsection which is outside of project limits. Please bid per the current contract documents
Response posted 10/24/2023
Inquiry #28: What is the thickness of rock much Type 1 and Type 2 (bid items 49 and 50)?
Inquiry submitted 10/20/2023
Response #1:(BI#28)-Your inquiry has been received and is being reviewed.
Response posted 10/20/2023
Response #2:(BI#28)-Please refer to addendum 3, dated October 24, 2023.
Response posted 10/24/2023
Inquiry #29: Please provide locations and details necessary to estimate the cost for the temporary creek diversion systems.
Inquiry submitted 10/20/2023
Response #1:(BI#29)-Your inquiry has been received and is being reviewed.
Response posted 10/20/2023
Response #2:(BI#29)-Item 0039 (bid item 131201) temporary creek diversion systems is not shown on the plans. Per 401 permit requirements attached in the Information handout, Caltrans Standard Specifications should be followed.
The stormwater professional QSD for the contractor is responsible for determining location and timing for implementation of temporary creek diversion system.
Attention is directed to special provisions 13-12, which includes specifications for constructing, maintaining, reconstructing, and removing temporary creek diversion system.
Response posted 10/24/2023
Inquiry #30: North Fork Dry Bridge General plan shows 60MA barrier being placed in stage 1 behind temp barrier. This is not correct according to the staging plans, we are assuming 60MA to go in stage 7. Please confirm.
Inquiry submitted 10/24/2023
Response #1:(BI#30) Your inquiry has been received and is being reviewed.
Response posted 10/24/2023
Response #2:(BI#30) - Unless an addendum is issued, please bid per the current contract bid documents.
Response posted 10/26/2023
Response #3:(BI#30) - Please refer to addendum # 3, dated October 24, 2023. Attention is directed to SC-29 sheet, construct median barrier in stage 8.
Response posted 10/26/2023
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.