Viewing inquiries for 03-4H76U4

Submit new inquiry for this project


Inquiry #1: Drainage System 7-D GT4 DI is described of having a height of 3.1’ in the drainage quantities (sheet 172) but in the profiles (sheet 160) the difference between the Grate FL and the outlet pipe FL is 2.51’. If the inlet is 2.51’ between Grate FL and Outlet Pipe Opening, there is a conflict due to the minimum height of the GT4 Lid described in the 2023 Standard Plan D73D Section E-E. Can Caltrans consider changing this inlet into a G6 inlet? Please advise.
Inquiry submitted 03/27/2024

Response #1:(BI#1) - Your inquiry has been received and is being reviewed.
Response posted 03/28/2024


Response #2:(BI#1) - CALTRANS H VALUE IS CALCULATED FROM THE CENTER OF THE GRATE TO THE INSIDE BOTTOM OF THE DI. THE INLET SITS 6" ABOVE THE BOTTOM OF THE DI
Response posted 03/29/2024




Inquiry #2: May Caltrans please consider providing drainage profiles for the following drainage inlets: 1A, 1C, 2B, 5A, 6A, 18A, and 18B. It is unknown based on the plan sheets if there are any pipe penetrations and if so, what elevations they are. Please advise.
Inquiry submitted 03/28/2024

Response #1:(BI#2) - Your inquiry has been received and is being reviewed.
Response posted 03/28/2024


Response #2:(BI#2) - DS1A,1C,5A,18A, AND 18B ARE ALL INFILTRAION DI WITH NO PIPE CONNECTIONS. DS2B HAS AN INLET ON THE SOUTH SIDE WITH AN ELEVATION OF 168.14 AND AN INLET ON THE WEST SIDE AT 168.24. THE GRATE ELEVATION FOR DS6a IS 170.76 AND THE OFFSET FROM “A1” ALIGNMENT IS 29.95 Lt AT STA 350+37.40
Response posted 03/29/2024


Response #3:(BI#2) - Drainage systems 1A, 1C, 5A, 18B are all infiltration DIs with no pipe connections. An addendum is being processed to address the others.
Response posted 04/29/2024




Inquiry #3: Drainage System 4B GT4 DI has a listed height of 10.0’ in the drainage quantities (sheet 172), but in the drainage profiles (sheet 159) between the grate FL and the outlet pipe FL the box has a height of 3.5’
Please advise which height is correct?

Inquiry submitted 03/28/2024

Response #1:(BI#3) - Your inquiry has been received and is being reviewed.
Response posted 03/28/2024


Response #2:(BI#3) - DS4b THE HEIGHT OF THE GT4 INLET SHOULD 4.0’ AND THE STRUCTURAL CONCRETE QUANITY SHOULD BE 3.22 CY
Response posted 03/29/2024


Response #3:(BI#3) - An addendum is being processed to address this.
Response posted 04/29/2024




Inquiry #4: The quantity for bid item 50 is 3,430 lb. but the drainage quantity on plan sheet 173 (DQ-2) is 6,775 lb. Please correct as applicable.
Inquiry submitted 04/02/2024

Response #1:(BI#4) - Your inquiry has been received and is being reviewed.
Response posted 04/02/2024


Response #2:(BI#4) - DQ-2 (6775 lbs) is correct. An addendum is being processed to address this.
Response posted 04/29/2024




Inquiry #5: Please identify the locations where the existing irrigation system is to be "relocated" as referenced in Section 20-10.02C(2). If the contractor is required to relocate irrigation systems, please provide a bid item for each irrigation system to be relocated.
Inquiry submitted 04/02/2024

Response #1:(BI#5) - Your inquiry has been received and is being reviewed.
Response posted 04/02/2024


Response #2:(BI#5) - An addendum is being processed to delete this work.
Response posted 04/29/2024




Inquiry #6: Please provide a bid item for clearing & grubbing or tree removal.
Inquiry submitted 04/02/2024

Response #1:(BI#6) - Your inquiry has been received and is being reviewed.
Response posted 04/02/2024


Response #2:(BI#6) - An addendum is being processed to add this bid item.
Response posted 04/29/2024




Inquiry #7: Please provide bid items for adjusting utility frames & covers to final grade.
Inquiry submitted 04/02/2024

Response #1:(BI#7) - Your inquiry has been received and is being reviewed.
Response posted 04/02/2024


Response #2:(BI#7) - An addendum is being processed to add this bid item.
Response posted 04/29/2024




Inquiry #8: Please provide or identify the locations of proposed pavement sections no. 5 and no. 6 on the plans.
Inquiry submitted 04/11/2024

Response #1:(BI#8) - Your inquiry has been received and is being reviewed.
Response posted 04/11/2024


Response #2:(BI#8) - An addendum is being processed to address this.
Response posted 04/29/2024




Inquiry #9: On plan sheet 7 (X-6), it shows that from STA 86+50 to 142+00 the proposed structural section being used is no. 1, which includes RHMA-O. However, on plan sheet 241 (Q-1), the summary of quantities does not show RHMA-O going passed L-8, before what the typicals are showing. Should the proposed structural section actually be no. 2? Please correct.
Inquiry submitted 04/15/2024

Response #1:(BI#9)-Your inquiry has been received and is being reviewed.
Response posted 04/15/2024


Response #2:(BI#8) - An addendum is being processed to address this.
Response posted 04/29/2024




Inquiry #10: There is a bid item for Check & test existing irrigation. Please provide irrigation as builts for the areas we need to check & test
Inquiry submitted 04/15/2024

Response #1:(BI#10)-Your inquiry has been received and is being reviewed.
Response posted 04/15/2024


Response #2:(BI#10) - An addendum is being processed to delete this item.
Response posted 04/29/2024




Inquiry #11: Please provide a bid item for mobilization.
Inquiry submitted 04/16/2024

Response #1:(BI#11)-Your inquiry has been received and is being reviewed.
Response posted 04/16/2024


Response #2:(BI#11) - Bid item for mobilization is included. Bid per contract documents.
Response posted 04/29/2024




Inquiry #12: Please provide a bid item for street sweeping.
Inquiry submitted 04/16/2024

Response #1:(BI#12)-Your inquiry has been received and is being reviewed.
Response posted 04/16/2024


Response #2:(BI#12) - Bid item for street sweeping is included. Bid per contract documents.
Response posted 04/29/2024




Inquiry #13: Please provide a bid item for locating & mapping.
Inquiry submitted 04/19/2024

Response #1:(BI#13)-Your inquiry has been received and is being reviewed.
Response posted 04/19/2024


Response #2:(BI#13) - We are not using a separate bid item for locating and mapping. This work is included in the Electrical work. Bid per contract documents.
Response posted 04/29/2024




Inquiry #14: Is the geosynthetic reinforcement for bid item 25 supposed to be subgrade enhancement geosynthetic (SEG)? Please identify the location of the geosynthetic in the plans.
Inquiry submitted 04/19/2024

Response #1:(BI#14)-Your inquiry has been received and is being reviewed.
Response posted 04/19/2024


Response #2:(BI#14) - Yes, it should be subgrade enhancement geosynthetic. An addendum is being processed to address this.
Response posted 04/29/2024




Inquiry #15: How do I acquire the required NDA sign off for this project? Thank you!
Inquiry submitted 04/23/2024

Response #1:(BI#15) - Your inquiry has been received and is being reviewed.
Response posted 04/23/2024


Response #2:(BI#15) - Please sign off NDA electronic form, which will generate automatically before downloading the project plans. For further information refer to

https://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php
Response posted 04/24/2024




Inquiry #16: Please provide the pothole information table for potholes ID # 22A thru 22Z (26 each) on plan U-17 (sheet 190).
Inquiry submitted 04/24/2024

Response #1:(BI#16) - Your inquiry has been received and is being reviewed.
Response posted 04/24/2024


Response #2:(BI#16) - See plan sheet 195 (U22). Bid per contract documents.
Response posted 04/29/2024




Inquiry #17: Please consider removing the RHMA-G & RHMA-O for approximately 30 driveways (e.g. "A1" sta 282+45 left) and using HMA-A instead.
Inquiry submitted 04/24/2024

Response #1:(BI#17) - Your inquiry has been received and is being reviewed.
Response posted 04/24/2024


Response #2:(BI#17) - See bid item 32. Bid per contract documents.
Response posted 04/29/2024




Inquiry #18: Is the Engineer going to respond to Inquiry #6?
What bid item is the clearing and grubbing/tree removal work to be bid under?

Inquiry submitted 04/28/2024

Response #1:(BI#18) - Your inquiry has been received and is being reviewed.
Response posted 04/29/2024


Response #2:(BI#18) - An addendum is being processed to add this bid item.
Response posted 04/29/2024




Inquiry #19: In reference to the response for inquiry #17, the driveways in question are shown to be cold planed and replaced with pavement section no. 1 (same as the highway pavement section), not removed and replaced per the typical driveway conform place HMA (miscellaneous) detail shown on C-1 (sheet 29) and its corresponding bid item 32.
As an example of one of the driveways in question, the driveway at station 345+66 (left) on layout plan L-6 (sheet 13) is shown to cold planed and replaced with pavement section no. 1 and is not similar to driveways such as Dwy 2 (station 345+70 right), construction detail C-1, and corresponding bid item 32.

Inquiry submitted 05/02/2024

Response #1:(BI#19) - Your inquiry has been received and is being reviewed.
Response posted 05/02/2024


Response #2:(BI#19) - Sheet Q-4 has two driveway tables.

One is driveway table is for concrete

One is driveway table is for asphalt/AC

For the AC dwys we assumed this: 0.2’ grind then place 0.2’ misc HMA

We are updating the conforms

Response posted 05/02/2024


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.