Submit new inquiry for this projectInquiry #1: Is there a mandatory prebid meeting for this bid? I didn't see any information in the bid documents.
Inquiry submitted 11/27/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 11/27/2023
Response #2:This Contract does not have a mandatory Pre-Bid Meeting.
Response posted 11/27/2023
Inquiry #2: 1. Is there a required form for the bid bond, or should we use our surety's form? If there's a Caltrans required form, how can we obtain it?
Inquiry submitted 11/30/2023
Response #1:Bid security must be received by Office Engineer prior to the specified bid opening date and time. Either submit an electronic bid bond with your bid or submit a paper bid bond to Office Engineer prior to the specified bid opening date and time. Bidder's Security information can be found in the Special Provisions, Revised Standard Specifications and Standard Specifications section 2-1.34. Paper bid bond forms are included in the electronic bid file, as the last 2 pages of the print out of the electronic bid form. Bid Bond forms may also be downloaded from the Caltrans Office Engineer Electronic Bidding website at: http://ppmoe.dot.ca.gov/des/oe/electronic-bidding.html. Failure to submit bid security as specified may cause your bid to be deemed nonresponsive.
Electronic bid bonds may be submitted with your bid. Electronic bid bonds need to be verified through either Surety 2000 or Tinubu Surety. Electronic Bid Bond information is entered in the Bidder's Bond tab. Once bid bond data has been entered, select "Verify" to verify your electronic bid bond. For information regarding Surety2000, please visit http://surety2000.com. For information regarding Tinubu Surety, please visit https://www.tinubu.com/surety-for-brokers-and-agents.
Response posted 11/30/2023
Inquiry #3: The Notice to Bidders says we are to submit our bids on Bid Express. I logged into that site and could not find this solicitation. Can you please provide the specific URL we should use to find it?
Inquiry submitted 11/30/2023
Response #1:04-0Q1804 is listed in the letting for 1/9/24.
Response posted 11/30/2023
Inquiry #4: Do I understand correctly that the only forms we are to submit are:
1) Bid Bond
2) BID ITEM LIST (Do we type into the form in the bid package, or will we type into an online form?)
3) The Bid Forms package in the solicitation, as follows:
--IN-USE OFF-ROAD DIESEL-FUELED VEHICLE LIST
--DBE - COMMITMENT
--DBE CONFIRMATION
--DBE GOOD FAITH EFFORTS DOCUMENTATION
The General Conditions addendum, 2-1.33B(2)(b)(ii) Bid Form Submittal, says we are also to submit:
4) Subcontractor List
5) Small Business Status
6) Opt Out of Payment Adjustments for Price Index Fluctuations (if we choose that option)
Where do we find these three forms?
Inquiry submitted 11/30/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/04/2023
Response #2:For #1, Per the 2023 Standard Specifications, Section 2-1.34, Bidders Security. Submit the bidder's security (bid bond) equal to at least 10 percent of the bid. Submit to the Department's Office of Construction Contract Awards before the bid opening time.
For question items #2, #4, #5, and #6 forms are to be complete/submitted electronically, please review the Caltrans Electronic Bidding Guide on how to complete the electronic bid form. Find the guide at (https://ppmoe.dot.ca.gov/des/oe/docs/ElectronicBiddingGuide.pdf)
The forms listed for #3, are post bid documents to be submitted after the scheduled bid opening date for this project. Be sure to submit the forms by the respective due dates.
Response posted 12/05/2023
Inquiry #5: Inquiry 4 says a response was posted 12/4/2023, but I don't see any response.
Inquiry submitted 12/04/2023
Response #1:Please see updated response for bidder inquiry #4.
Response posted 12/05/2023
Inquiry #6: Please confirm that the concrete for the trash nets will be paid under the trash net bid items (54, 55, 56).
Inquiry submitted 12/08/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/08/2023
Response #2:Yes, the concrete for the trash nets will be paid under the trash net bid items (54, 55, 56).
Response posted 12/08/2023
Inquiry #7: Please clarify the bid item quantity for bid item #64. Plan sheet DQ-5 and other drainage sheets show a total of 13 each, but the bid items show a total fo 14 each.
Inquiry submitted 12/08/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/08/2023
Response #2:The bid item quantity for bid item #64: Plan sheet DQ-5 and other drainage sheets show a total of 13 each, the correct quantity is 13.
Response posted 12/08/2023
Inquiry #8: Please clarify the stations for drainage systems 5e and 7e shown on sheets DD-18, D-3, and DP-3. It appears the stationing is off by 100 feet. Similarly, please clarify if the bid item quantity of 140 CY is correct for bid item 63, Concrete (Ditch Lining), or if that quantity needs to be updated based on revised lineal footages for drainage systems 5e and 7e.
Inquiry submitted 12/08/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/08/2023
Response #2:Please see Addendum 2. Bid Item 63, Concrete (Ditch Lining) quantity is correct. Sheets D-3, DD-18, and DP-3 have been updated.
Response posted 01/12/2024
Inquiry #9: Midwest Guardrail is required to be anchored at both ends. Current plans (L-5) show only one End Anchor at the departure end. Please advise what kind of Terminal System Caltrans would like to be utilized at the 'W1' and 'W2' Lines
Inquiry submitted 12/18/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/18/2023
Response #2: MAX-Tension In-Line Guardrail Terminal TL-3 at approach end.
Response posted 12/18/2023
Response #3:Please see Addendum 2. The MAX-Tension TL-3 Terminal System is paid on Bid Item Alternative In-Line Terminal TL-3.
Response posted 01/12/2024
Inquiry #10: In Response to Inquiry #9, will an addendum be issued to add the MAX-Tension TL-3 Terminal System to the Bid Item List?
Inquiry submitted 12/18/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/18/2023
Response #2:Please see Addendum 2. The MAX-Tension TL-3 Terminal System is paid on Bid Item Alternative In-Line Terminal TL-3.
Response posted 01/12/2024
Inquiry #11: Please provide all lane closure charts for all of Hegenberger Road Ramp Closures and and Lane Closures required to install the new 8" WSP Conduit across the roadways.
Irrigation Conduit Chart on Sheet 87 indicates crossing on both NB & SB Hegenberger Rd, both SB and NB On-Ramp to 880, & NB 880 Off-Ramp to Edes Ave.
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/19/2023
Response #2:Please see Addendum 2. Lane Closure Charts for Hegenberger Road ramps are now provided.
Response posted 01/12/2024
Inquiry #12: Bid Item #60 Remove Culvert (LF) only indicates that 7.3 LF of 18" Pipe is required for the installation of the Capture Housing Structure in DS#10. Drainage System Profile on Sheet 31 for DS#(10) clearly shows that the new 18" CSP is to replace the existing 18" Culvert and added a second 15" CSP culvert that run parallel between the new Capture House and a new inlet structure at Sta. "M1" 1865+56.62. Please confirm that the existing 18" culvert will be removed for the total length between (N) Expanded Type G2 Inlet (also Referenced as Splitter Box) to the (N) Capture Housing Structure. This should be in excess of 29 LF.
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/19/2023
Response #2:Please see Addendum 2. Bid Item 60, Remove Culvert (LF) quantity has been revised, and drainage System 10 on plans sheet DP-5 has been revised.
Response posted 01/12/2024
Inquiry #13: Under which bid item will the new Expanded Type G2 Inlet @ Station "M1" 1865+56.62 for Drainage System #10 be paid under?
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/19/2023
Response #2:For new Expanded Type G2 Inlet will be paid under (System 10) Bid item 015429, Capture Housing Type B.
Response posted 12/19/2023
Inquiry #14: Please provide As-Builts for all pavement sections that will be removed for the installation of (N) WSP Conduit Irrigation Sleeves at the 880 & Hegenberger Road Intersection. Per Standard Specification Section 20-2.01C(2): for trenching and the removal of (E) Surfacing, information is needed on the (E) structural section at these crossing.
Please provide cross-sectional detail for the width and type of asphalt concrete and underline base materials. Is there a minimum trench width for these crossings?
What is the detail and extend of concrete curb and sidewalk removals/replacement for these locations?
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/19/2023
Response #2:For Bid Item 48, 8” Welded Steel Pipe Conduit., Install welded steel pipe by directional drilling or jack and bore, per Standard Provisions 20-2.107C(2), Welded Steel Pile Conduit.
Response posted 01/03/2024
Inquiry #15: Please confirm that the required inlet & vault frames, grates (Type 24-12X & 24-12 (Mod)) and W6x25 support beam for the Capture Structure and Splitter Box are not stainless steel materials.
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/19/2023
Response #2:Capture housing items that must be stainless steel are listed in the “Miscellaneous Metal Parts” table under the Project’s Special Provision 62-17 Capture Housing. Materials for items not listed must comply with Section 62-1 Stormwater Treatment of the Standard Specifications.
Response posted 12/20/2023
Inquiry #16: Bid Item #60 Remove Culvert (LF) only indicates that 7.3 LF of 18" Pipe is required for the installation of the Capture Housing Structure in DS#10. Drainage System Profile on Sheet 31 for DS#(10) clearly shows that the new 18" CSP is to replace the existing 18" Culvert and added a second 15" CSP culvert that run parallel between the new Capture House and a new inlet structure at Sta. "M1" 1865+56.62. Please confirm that the existing 18" culvert will be removed for the total length between (N) Expanded Type G2 Inlet (also Referenced as Splitter Box) to the (N) Capture Housing Structure. This should be in excess of 29 LF.
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/19/2023
Response #2:Please see Addendum 2. Bid Item 60, Remove Culvert (LF) quantity has been revised, and drainage System 10 on plans sheet DP-5 has been revised.
Response posted 01/12/2024
Inquiry #17: Does the Capture Housing Structure Vault 2 opening per Drainage Details on Sheet 41 (DD-8) provide a clear opening wide enough for the installation of the screen box assembly within the 3 grates (24-12 (Mod), when completely removed? Section B-B for the Capture Structure indicates a W6 x 25 steel beam spanning across the vault. Where is this located in plan view for the same detail on Sheet DD-9 (Detail "A") showing that it support two adjacent grates?
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/19/2023
Response #2:Please see Addendum 2. Detail A on sheet DD-9 has been revised.
Response posted 01/12/2024
Inquiry #18: Please clarify if detours and detour signage are only required for On-Ramps. Sheet TH-4 shows an off-ramp closure, but these is not a detour shown in the CS drawings.
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/20/2023
Response #2:The detours and detour signage are only required for On-Ramps.
Response posted 01/03/2024
Inquiry #19: Please clarify if the ramp closures are required, or if contractor has an option to not utilize them for areas with good access off the shoulder? It seems like there are multiple locations where the TH plans do not shown a closure, but a closure chart is provided in the special provisions. Maybe the intent is that closures will be needed for landscaping work, but not required for some of the drainage work?
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/20/2023
Response #2:As per Highway Operations, contractor has a liberty to use or not use lane closure charts.
Response posted 12/28/2023
Inquiry #20: Please clarify where PCMS are required, since this is a Lump Sum Bid Item. Normally PCMS is a unit price item showing a quantity with locations shown on the plans.
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/20/2023
Response #2:Please bid per PCMS shown on plans.
Response posted 12/28/2023
Inquiry #21: Please clarify the intent of the crash cushion location and temp barrier system for the drainage system 10 / location 3C. It appears it is located atop the capture housing, leaving no room to build the capture housing. Can this temp barrier and crash cushion be shifted into the roadway (potential lane closure), or will drainage system 10 need to be constructed under a complete ramp closure?
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/20/2023
Response #2:Yes, the drainage system 10 / location 3C work is next to curb. Part like removal of the work here can be done by daytime per lane closure chart and rest of the work for drainage system 10 / location 3C need to be constructed under a complete ramp closure.
Response posted 12/20/2023
Inquiry #22: Please clarify if the ramp closure chart No J7 applies to this project. Additionally, please confirm that lane closure chart no. J8 is the closure chart that applies for this area (Location 4A). The closure chart remarks state "see Detour Plan No. 4", but I believe it should say "See Detour Plan No. 3", as there is no detour plan no. 4 shown on the project plans.
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/20/2023
Response #2:Please see Addendum 2. Lane Closure Chart J8 has been revised.
Response posted 01/12/2024
Inquiry #23: Please provide a detail / information to show / describe how contractor shall install the piping (8" irrigation conduit) under the roadway at on-ramp, off-ramp, and street locations. Will any trenching / repaving be required, or is the pipe supposed to be rammed / pushed / bored... Under what bid item will the repaving and earthwork be paid?
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/20/2023
Response #2:For Bid Item 48, 8” Welded Steel Pipe Conduit, “Install welded steel pipe by directional drilling or jack and bore”, per Standard Provisions 20-2.107C(2), Welded Steel Pile Conduit.
Response posted 01/03/2024
Inquiry #24: Please clarify if plant establishment is required for this project. If so, would that duration commence at the end of the assumed 120 to 150 working days, therefore project would be substantially complete at the end of the assumed 120 to 150 working days.
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/20/2023
Response #2:This project does not require any Plant Establishment period.
Response posted 12/21/2023
Inquiry #25: The Capture Housing Screen Box and Screen Weir are illustrated in an isometric view for DS#10 Screen Box Detail 3 on Drawing DD-13, indicates that the front wall screen box is in line with the screen weir. Drawing DD-8 Plan view shows that these two items are not in line or connected. Please confirm the connection detail for these two items and provide additional details.
Please confirm that the overall height of the Screen Box is 17 1/2" tall which includes the thickness of the lid and top screen. Drawing DD-11 illustrates something different.
Inquiry submitted 12/19/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/20/2023
Response #2:Please see Addendum 2. Per Section A-A on revised sheet DD-5, the Screen Weir has an 18” OD, the screen slats are 17.5” long. See Detail C on sheet DD-7 for the connection between the Screen Weir and the Screen Box.
Response posted 01/12/2024
Inquiry #26: Under what bid item will potential striping removal and restriping be paid, where trenching through the road / on-ramps / off-ramps is required for irrigation scope of work.
Inquiry submitted 12/20/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/20/2023
Response #2:For Bid Item 48, 8” Welded Steel Pipe Conduit, “Install welded steel pipe by directional drilling or jack and bore”, per Standard Provisions 20-2.107C(2), Welded Steel Pile Conduit.
Response posted 01/03/2024
Inquiry #27: Please clarify the risk level / anticipated risk level for this project so Contractor can better understand the SWPPP requirements. Additionally, is there a draft SWPPP for this project or will Contractor have to create this from "scratch".
Inquiry submitted 12/21/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/21/2023
Response #2:The specifications for Bid Item 11, Storm Water Prevention Plan are include included in Addendum 2.
Response posted 01/12/2024
Inquiry #28: Please clarify why there is a bid item quantity of 3 EA for BI 13 "Storm Water Annual Report" when there are only 120 to 150 working days to complete the project. Are there any restrictions (i.e. limited work during certain seasons only) which would require this to be a 2 to 3 year project?
Inquiry submitted 12/26/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/27/2023
Response #2:Please see Addendum 2. The Bid Item 13, 130330, Storm Water Annual Report quantity has been revised to two.
Response posted 01/12/2024
Inquiry #29: Please provide more information regarding Bid Item 25 "Clearing and Grubbing". It appears there is not a bid item for tree removal, but there are lots of trees/large shrubs within the work area. Is there a certain maximum diameter tree/shrub that contractor should assume will need to be removed, with anything larger being left in place, or extra work? Also, should contractor assume that the hydroseeding area should determine the clear and grub area? In this case, temporary vs. permanent hydroseeding areas differ significantly in some areas, such as area 4A.
Inquiry submitted 12/26/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/27/2023
Response #2:Bid Item 25, Clearing and Grubbing, does not include tree removal. Contractor shall not assume that clear and grubbing will be applied to the whole hydroseeding area. Contractor shall clear and grub only the areas where the trash capture devices will be constructed. Existing trees and vegetation in the hydroseeding areas where the trash capture devices are not being installed shall be protected to the largest extent possible.
Response posted 01/03/2024
Inquiry #30: Please clarify is the capture housing and splitter box can be precast, or if they must be cast-in-place concrete.
Inquiry submitted 12/27/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/28/2023
Response #2: Capture housing and splitter box can be precast or cast-in place as far as it follows Caltrans 2023 Specifications Standards and Safety guideline.
Response posted 12/28/2023
Response #3:Capture housing and splitter box must be cast-in-place concrete based on the current Capture Housing Design Guidance and details.
Response posted 01/02/2024
Inquiry #31: Please clarify if the 8" Welded Steel Pipe Conduit quantities shown on sheet IQ-1 are correct. It appears that the WSP at Station "M1" 2492+2 is not required, since plan sheet IP-2 calls for using the existing 8" CSP located in that area.
Inquiry submitted 12/28/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/28/2023
Response #2:Please see Addendum 2. Sheet IP-2 has been revised.
Response posted 01/12/2024
Inquiry #32: Please provide the locations of the 10 EA temporary radar speed feedback sign systems, similar to how quantities are shown in the traffic handling quantities shown in the table on sheet THQ-1
Inquiry submitted 12/28/2023
Response #1:The inquiry has been received and submitted for consideration.
Response posted 12/29/2023
Response #2:Please see Addendum 2. The bid item for the temporary radar speed feedback sign systems has been deleted.
Response posted 01/12/2024
Inquiry #33: The irrigation plan sheets IR-1 through IR-4 and IP-1 through IP-2 show multiple locations where the irrigation is being installed / removed under existing paved roadway, or shoulder. Please clarify if Contractor will need to remove and replace existing asphalt / hardscape improvements, which will be a significant cost impact, or if these irrigation plans are diagrammatical in nature, and Contractor won't be required to remove / replace existing hardscape / asphalt. If hardscape / asphalt removal and replacement is required, please clarify under which bid item this is to be paid, or add additional bid items and quantities for asphalt removal and replacement.
Inquiry submitted 01/02/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 01/02/2024
Response #2:Contractor will not need to remove and replace existing asphalt / hardscape improvements due to installation of irrigation lines. Existing irrigation lines underneath hardscape are protected by existing irrigation conduits, which can facilitate the removal of irrigation lines without damaging existing hardscape. Welded steel pipe conduits are called out on sheets IP-1 and IP-2 to protect new irrigation lines to be installed underneath existing hardscape. Per Caltrans standards, welded steel pipe conduits shall be installed through directional boring or jack and drill, which avoids the need to remove existing hardscape.
Response posted 01/03/2024
Inquiry #34: The irrigation plans son sheet 84-85 show the installation of new mainline and some locations show the existing remove control valves being connected to new wire.
Please clarify if the existing remove control valves get a new wire. Is the constructor using the existing wire?
Inquiry submitted 01/03/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 01/03/2024
Response #2:On sheet IP-1, Contractor shall install new control wire along the new mainline to replace the portion of the existing control wire that is getting removed. New mainline and new control wire do not connect to existing remote-control valves at this location. On sheet IP-2, Contractor shall install new control wire and connect it to the existing remote-control valves. Existing wire at this location is shown as removed on sheet IR-4.
Response posted 01/03/2024
Inquiry #35: I am unable to download the bid book now that the bid date has been extended. I am receiving the following error: Could not find active letting '04-0Q1804_0123'
Please ensure that the link to the bid book is active.
Inquiry submitted 01/03/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 01/03/2024
Response #2:The link of this bid book is now active and is downloadable. Please try to use a different browser as that could be the issue sometimes.
Response posted 01/03/2024
Inquiry #36: Please provide more information on bid item 22 Noise Monitoring. What is the extent of noise monitoring requirements for this project, as there are not any significant noise generating activities on this project. Does Contractor need to monitor noise only during potential night work?
Inquiry submitted 01/03/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 01/03/2024
Response #2:Please see Addendum 2. Bid Item 22 Noise Monitoring has been deleted and bid item list has been updated.
Response posted 01/12/2024
Inquiry #37: Please confirm "W4" 10+08.80. There is an existing SFT that would need to be removed and added to treated wood waste to complete installation. Wil there be removal of existing SFT to connect new MGS?
Inquiry submitted 01/12/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 01/12/2024
Response #2:There is no removal. Bid per plan and specification.
Response posted 01/16/2024
Inquiry #38: Sheets IR-4 and IP-2 show two remote control valves labeled "C". Please provide the location of controller "C" for connecting the new wire.
Inquiry submitted 01/19/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 01/19/2024
Response #2:The location of controller "C" is out of the page on sheet IR-4 and IP-2. It is located on southbound Hegenberger Rd between Edgewater Drive and southbound I-880 offramp.
Please complete and email the Confidentiality Agreement (link below) with scanned ID/Driver's License to the Duty Senior (D4.Construction.Duty.Senior@dot.ca.gov) to obtain as-builts for reference.
LINK:
http://website.dot.ca.gov/dist4/construction/contracts/Caltrans_ConfidentialityAgreement_10-2003.pdf
Response posted 01/19/2024
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.