Bidder Inquiries
Caltrans Bidding Connect Account:
Sign In (Sign in is required to access Project Plans)
Create Account (Click here to create a Caltrans Bidding Connect Account)
Viewing inquiries for 04-3J2604
Submit new inquiry for this projectInquiry #1: Can the work be performed during the day
Inquiry submitted 09/25/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 09/25/2024
Response #2:Construction work can be performed during the day, as permitted by the lane closure charts and the project specifications.
Response posted 09/26/2024
Inquiry #2: Can one way traffic be set up on Bayshore Hwy between Hearst Ave and Jones day to allow for the work to be done during the day.
Inquiry submitted 09/25/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 09/25/2024
Response #2:The Contractor may need to take out an encroachment permit from the local jurisdiction defining what is being done on the local street and the time frame. Contractor need to adhere to local roadway/street closure requirement from local jurisdiction. Department have PTEC ( permit to enter and construct ) with the local City.
Response posted 10/07/2024
Inquiry #3: Typical cross sections on sheet X-5 show paving sections 3 and 4 for the new construction. These sections do not include ATPB, and they do not detail an Edge Drain at these locations. The Drainage Plans on sheets D-6 and D-7, and DQ-2 call for an Edge Drain at the Pleasant Hill location. Installing an Edge Drain within a section of deep lift asphalt is not typically done. Please confirm that an edge drain is required at the Highway 680 locations.
Inquiry submitted 10/15/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 10/15/2024
Response #2: Please bid per current contract documents.
Response posted 11/03/2024
Response #3:The Edge Drain is not required at the Highway 680 locations.
Response posted 11/03/2024
Inquiry #4: We are have a hard time sourcing the rails for the wrought iron fence. We can find
1.5" x 1.5" square having a 1/4" wall or a channeled 1.5" x 1.5" with a 1/4" wall. Would this be acceptable to use the rails listed above on the wrought fence
Inquiry submitted 10/16/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 10/17/2024
Response #2:Please bid per current contract documents.
Response posted 11/03/2024
Inquiry #5: 1. Materials on the Plan and Specials are different, and the plans have 2 different wall thickness , What are the correct sizes and wall thicknesses for the fence?
In the plans the posts and rails show as 3/8" wrought iron. The spec calls for 14 gauge rails. 14 gauge is 5/64, and is much thinner than 3/8".
Please accurately specify the thickness of the posts, rails and pickets.
Inquiry submitted 10/17/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 10/17/2024
Response #2:Please bid per the special provisions. Per 2023 Standard Specifications Section 5-1.02 CONTRACT COMPONENTS, if a discrepancy exists: Governing ranking of Contract parts in descending order is: Special provisions, Project plans, Revised standard plans, Standard plans, Supplemental project information
Response posted 11/03/2024
Inquiry #6: The quantities for items 53 and 54 cannot possibly be correct.
Item 53 -- there is literally 1 rock of 1T on the plans. This quantity should not be more that 1 CY.
Item 54 - There are 33 ea 1/2 ton rocks on the plans. This quantity should be closer to 14 cy, not 140 cy.
Inquiry submitted 10/17/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 10/17/2024
Response #2:See addendum 3.
Response posted 11/03/2024
Inquiry #7: Paving section 1 on X-1 details Subgrade Enhancement Fabric below the Class 2 AB.
There is no pay item for the subgrade fabric.
Inquiry submitted 10/17/2024
Response #1:The inquiry has been received and submitted for consideration.
Response posted 10/17/2024
Response #2:Please see addendum 3.
Response posted 11/03/2024
Inquiry #8: Bid Item #45 Slotted CSP 16ga , The plans do not show the grate type or height. If you look at the drainage profiles for DS#1D , it shows a variable height grate. Please Clarify.
Inquiry submitted 10/21/2024
Response #1:Your inquiry has been received and submitted for consideration.
Response posted 10/21/2024
Response #2:Please bid per current contract documents.
Response posted 11/03/2024
Inquiry #9: Can Caltrans please specify if the quantity for "Remove Thermoplastic Traffic Stripe" on plan page SC-1 will be included in the SCQ-1 or PDQ-1 quantities?
Inquiry submitted 10/22/2024
Response #1:Your inquiry has been received and submitted for consideration.
Response posted 10/22/2024
Response #2:Please bid per current contract documents.
Response posted 11/03/2024
Inquiry #10: Do you plan to revise Lane Requirement Chart G2 from just shoulder closures to shoulder closures and a lane closure for purposes of setting and removing K rail, paving, earth work, barrier placement, removals and other items necessary to complete CT contemplated work within CT Right of Way?
Traffic between 11 PM and 4 AM is light enough to take one lane out of the motoring publics' convenience for construction of public safety devices.
Inquiry submitted 10/22/2024
Response #1:Your inquiry has been received and submitted for consideration.
Response posted 10/22/2024
Response #2:Please bid per current contract documents.
Response posted 11/03/2024
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.