Bidder Inquiries
Caltrans Bidding Connect Account:
Sign In (Sign in is required to access Project Plans)
Create Account (Click here to create a Caltrans Bidding Connect Account)
Viewing inquiries for 07-333604
Submit new inquiry for this projectInquiry #1: Several curb ramp details do not depict slot patch required for concrete construction. Please confirm or clarify whether it is Caltrans' intent to not have contractors slot patch curb ramps where pavement section 3 is not shown.
Inquiry submitted 05/02/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/03/2024
Inquiry #2: Please confirm or clarify that slot patch and trench patch construction are to be paid for in the hot mix asphalt item.
Inquiry submitted 05/02/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/03/2024
Inquiry #3: Sheet C-53, Location No. 54 Santa Monica Boulevard & Colby Avenue – NE Corner does not appear to have a pavement section 8 drawn on the plan sheet but is shown in profile section A-A. Should this location have pavement section 8? If so, revise the plan to show the limits of pavement section 8.
Inquiry submitted 05/02/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/03/2024
Inquiry #4: Sheet C-73, Location No. 74 Santa Monica Boulevard & Beloit Avenue – NE Corner has three callouts for fence; remove chain link fence, reconstruct chain link fence and relocate chain link fence. Please clarify whether Caltrans is requiring contractors to either remove, reconstruct, or relocate that stretch of chain link fence. If it is some combination of two or three, please clarify the limits of each.
Inquiry submitted 05/03/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/03/2024
Inquiry #5: Please clarify the limits of what Caltrans defines as a minor concrete (gutter depression). Is this for the spandrel & cross gutter in front of the curb ramps?
Inquiry submitted 05/03/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/03/2024
Inquiry #6: The layout sheets show to construct Type A2 Curb and Gutter but do not specify whether it is an A2-6 or A2-8 Curb and Gutter. Please state whether Caltrans requires a 6” or 8” curb face for the curb and gutter construction.
Inquiry submitted 05/03/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/03/2024
Inquiry #7: What is the existing PCC thickness of the curb ramps & sidewalks?
Inquiry submitted 05/03/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/03/2024
Inquiry #8: What is the existing PCC thickness for the cross gutters & spandrels?
Inquiry submitted 05/03/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/03/2024
Inquiry #9: What is the existing PCC thickness for the driveways?
Inquiry submitted 05/03/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/03/2024
Inquiry #10: The quantities on the summary of quantities sheets do not match the bid item quantities.
Inquiry submitted 05/03/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/03/2024
Inquiry #11: Please clarify how the slot patch for curbs will be paid.
Inquiry submitted 05/03/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/03/2024
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.