Inquiry #1: Traffic closure Charts K1 and K2, in Special provisions have the Letter "N" where it should say Saturday.

Does that mean no work is allowed on Saturdays? or is that a typo?

Thank you.

Inquiry submitted 06/03/2025

Response #1:Your inquiry is being reviewed. If a response is not received before bid date, bid per project documentation.
Response posted 06/04/2025




Inquiry #2: Regarding Bid Item 0013 CLEARING AND GRUBBING, is contractor responsible for clearing and grubbing the full width of 50' wide median areas or just 3' wide Class 3 areas?
Inquiry submitted 06/05/2025

Response #1:Your inquiry is being reviewed. If a response is not received before bid date, bid per project documentation.
Response posted 06/05/2025




Inquiry #3: Reference sheet L-9: "SNFRP4" 54+36.07 and 54+37.03 show "Beg Trans RAILING (TYPE AGT) (SEE STRUCTURE PLANS FOR LIMIT OF Br RAILING Trans). The structure plans do not appear to show any transition rail limits. There is no Concrete Barrier Transition quantity included in the structure plans, or in the summary of quantity sheets for these two runs. Please advise, how is this work measured and paid for?
Inquiry submitted 06/10/2025

Response #1:Bidder's inquiry withdrawal by sender, no need to respond.
Response posted 06/10/2025


Response #2:
Response posted 06/10/2025




Inquiry #4: Please disregard the prior inquiry regarding barrier transitions as it was intended for another contract.
Inquiry submitted 06/10/2025

Response #1:OK
Response posted 06/10/2025




Inquiry #5: Will the contractor be responsible for tree trimming, notably in the Encino Drive area ?
Inquiry submitted 06/10/2025

Response #1:Your inquiry is being reviewed. If a response is not received before bid date, bid per project documentation.
Response posted 06/11/2025




Inquiry #6: Is the placement of K-Rail required for work in the center divider portion of the work or will a lane closure be sufficient ?
Inquiry submitted 06/11/2025

Response #1:Your inquiry is being reviewed. If a response is not received before bid date, bid per project documentation.
Response posted 06/11/2025




Inquiry #7: Special Provisions 12-3.11B(5)(b) describes that "Provide two C50B(CA) construction project funding identification signs." However, Plan CS-1 Construction Area Signs calls for two C40(CA) with panel size 108"x42". Please clarify.
Inquiry submitted 06/19/2025

Response #1:Your inquiry is being reviewed.
Response posted 06/19/2025


Response #2:Bid per contract documents.
Response posted 06/20/2025


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.