Viewing inquiries for 07-355604
Submit new inquiry for this projectInquiry #1: Are there Liquidated Damages on this project?
Inquiry submitted 09/30/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 09/30/2024
Response #2:Please bid per contract documents.
Response posted 10/05/2024
Response #3:Please see Section 8-1.10 “Liquidated Damages” of the Standard Specifications.
Response posted 11/07/2024
Inquiry #2: Is there a Mandatory job walk?
Inquiry submitted 09/30/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 09/30/2024
Response #2:A Notice to Bidders for a Mandatory job walk has not been issued.
Response posted 10/05/2024
Inquiry #3: Is there a Mandatory job walk?
Inquiry submitted 09/30/2024
Response #1:Please see bidder's inquiry #2.
Response posted 09/30/2024
Inquiry #4: What is the Notice to Proceed date?
Inquiry submitted 09/30/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 09/30/2024
Response #2:The successful bidder will be allowed to begin construction after requirements of Section 3 “Contract Award and Execution” are met, after coordinating with Resident Engineer and after approval of required submittals.
Response posted 10/05/2024
Inquiry #5: Is this a Federal-Aid contract?
Inquiry submitted 09/30/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 09/30/2024
Response #2:No.
Response posted 10/05/2024
Inquiry #6: Is there a self-perform % requirement?
Inquiry submitted 09/30/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 09/30/2024
Response #2:Please see Small Business Enterprise Participation requirements in the Special Provisions and Standard Specifications. See also Section 5 ”Control of Work” of the Standard Specifications. This project is a building-construction non-federal-aid contract. The paragraph of Section 5-1.13A of the Standard Specifications which states “Except for a building-construction non-federal-aid contract, perform work equaling at least 30 percent of the value of the original total bid with your employees and with equipment you own or rent, with or without operators.” need not apply.
Response posted 10/05/2024
Inquiry #7: Paragraph 1.2 B. defines NRC, however the model specified does not have an NRC rating. Please clarify.
Inquiry submitted 10/01/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/01/2024
Response #2:Please see section 99-102239 Part 2.1 for the performance requirements. Please bid per the current contract documents.
Response posted 10/18/2024
Inquiry #8: Paragraph 1.7 A 1. References extra panel facing material however in an alternate paragraph it calls for the partition to be a paint finish. Please clarify or strike the “extra panel facing material” verbiage.
Inquiry submitted 10/01/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/01/2024
Response #2:Please see 99-102239 for the requirements of the Automatic Vertically Retractable Acoustic Wall Folding Panel Partitions. Please see section 99-102239 part 1.7A for the requirement to furnish extra material from the same production run to be packaged in a protective covering for storage. Please see section 99-102239 part 2.4 for the requirements of the finish facings. Please see 99-102239 part 1.4 for the action submittals. Please bid per the current contract set.
Response posted 10/18/2024
Inquiry #9: Paragraph 2.4 B. asks for the panels to be field painted. However, this is not recommended by the factory. The factory recommends a factory painted finish. Please clarify.
Inquiry submitted 10/01/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/01/2024
Response #2:Please see section 99-102239 part 1.4 for the requirements of the action submittals. Substitutions will be considered once the project has been awarded. Please bid per the current contract set.
Response posted 10/18/2024
Inquiry #10: Paragraph 2.4 C. ask for cap trimmed edges; however this is not an option on the partition. The edges will be painted. Please clarify.
Inquiry submitted 10/01/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/01/2024
Response #2:Please see section 99-102239 part 1.4 for the requirements of the action submittals. Substitutions will be considered once the project has been awarded. Please bid per the current contract set.
Response posted 10/18/2024
Inquiry #11: Is there a mandatory pre-bid conference? We want to make sure we attend any prebid meetings.
Inquiry submitted 10/02/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/05/2024
Response #2:Please see the Notice to Bidders, Division I – Section 2! No mandatory prebid meeting is shown.
Response posted 10/08/2024
Inquiry #12: Is there a Mandatory Pre-Bid Conference? We don't want to miss any required meetings.
Inquiry submitted 10/02/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/05/2024
Response #2:Please see the Notice to Bidders, Division I – Section 2! No mandatory prebid meeting is shown.
Response posted 10/08/2024
Inquiry #13: I see the floor plan on sheet A1-2 and the interiors to go along with this. But I do not see any interiors on the floor plans shown on sheet A2-1?
Inquiry submitted 10/09/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/10/2024
Response #2:Please see the scope of work on GP-2. The trailer shown on A2-1 and an existing trailer. Please bid per the current contract documents.
Response posted 10/18/2024
Inquiry #14: Regarding HVAC - the current set of drawings do not show manufacturers to be quoted for all materials, Can we get a clear schedule with manufacturer names and model numbers. Also regarding HVAC - there are no pipe sizes on the pipe diagram drawings please provide proper diagram or a pipe tree from the required manufacturers.
Inquiry submitted 10/09/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/10/2024
Response #2:Please see section 99-15500 for the HVAC requirement. Please bid per the current contract documents.
Response posted 10/18/2024
Inquiry #15: Would you have any specifications for Toilet Partitions and Toilet Accessories. Please let me know ASAP.
Inquiry submitted 10/10/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/10/2024
Response #2:Please see section 99-10162 Metal Toilet Partitions. Please see 99-10801 for toilet and shower accessories. Please bid per the current contract documents.
Response posted 10/18/2024
Inquiry #16: Does this project require a PLA or CWA?
Inquiry submitted 10/10/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/10/2024
Response #2:Please bid per contract document.
Response posted 10/25/2024
Inquiry #17: Are there any prequalifications?
Inquiry submitted 10/11/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/11/2024
Response #2:Please refer to the bid package and contract document.
Response posted 10/25/2024
Inquiry #18: Please provide bid bond form and where to send the hardcopy, it is not located in the bidders book.
Inquiry submitted 10/14/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/14/2024
Response #2:Please refer to the bid package and contract document.
Response posted 10/25/2024
Inquiry #19: What is the RFI deadline? When will the RFI responses and final Addendum be issued?
Inquiry submitted 10/15/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/15/2024
Response #2:Please refer to Sections 4-1.05 and 5-1.40-5-1.43 in the Standard Specs.
Response posted 10/25/2024
Inquiry #20: Can I please get a color and Ga for the ACM and corrugated wall panels
Inquiry submitted 10/15/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/15/2024
Response #2:Please see section 99-074213.19 for the requirements of the insulated metal wall panels. Please see sheet A0-8. All colors to be selected from the manufacturer’s standard color palettes. Please see section 99-074213.19 part 1.3 Action Submittals. Samples need to be submitted for each type of metal panel indicated with factory-applied color finishes. Please bid per the current contract documents.
Response posted 10/18/2024
Inquiry #21: Can I please get a color and Ga for insulated wall panels?
Inquiry submitted 10/15/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/15/2024
Response #2:Please see section 99-074213.19 part 2.2 for the requirements of foam insulation core metal wall panels. Please see sheet A0-8. All colors to be selected from the manufacturer’s standard color palettes. Please see section 99-074213.19 part 1.3 Action Submittals. Samples need to be submitted for each type of metal panel indicated with factory-applied color finishes. Please bid per the current contract documents.
Response posted 10/18/2024
Inquiry #22: Please clarify if the "Optional Standby Generator" is to be included as an alternate, base bid, or are we to just provide conduit to that location only.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:The Optional Standby Generator is an item of this contract. The term optional refers to another energy source. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #23: Please provide a specification and detail for the motor at the sliding gate.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see sheet EE0-7 for the requirements of the gate operator. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #24: Please provide the size and quantity of the conduits running from the existing 34.5kV vault that is shown on EEO-3 notes 12 & 14.
Please provide the conduit sizing for the DWP transformer to the new switchgear.
Please provide the pad sizes for the DWP Switchgear and Transformer at the SE corner of the site. Is this a precast pad or cast in place?
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see sheet EE0-12, General Notes, for requirements for installation of LADWP equipment. Please bid per the current contract documents.
Please see sheet EE0-12, General Notes, for requirements for installation of LADWP equipment. Please bid per the current contract documents.
Please see sheet ST5-2 for the cast in place concrete slabs. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #25: Please provide the manufacturer of the existing training trailers.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see sheets A2-1 through A2-3 for information on the existing training trailer. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #26: Please confirm that the existing training trailers may be stored on-site between the temporary removal and relocation per the bid documents.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see sheet A0-5, keynote I, for existing training trailer requirements. Please bid per the current contract documents.
Response posted 10/25/2024
Inquiry #27: Please confirm that the power used for the existing training trailers may be utilized by the contractor during construction. If so, please provide the amperage and phase of the power.(How extensive the reconstruction scope should be)
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see section 99-010000, part 1.4, Coordination with the Department, part D, and sheet EE0-10 for the existing power. Please bid per the current contract documents.
Response posted 10/25/2024
Inquiry #28: Please confirm that the water used for the existing training trailers may be utilized by the contractor during construction.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see section 99-010000, part 1.4, Coordination with the Department, part D. Please bid per the current contract documents.
Response posted 10/25/2024
Inquiry #29: Please provide the Authority Having Jurisdiction (AHJ) that will be inspecting this project.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see sections 1-1.01 and 5-1.01 for the department’s inspection requirements, all other authorities having jurisdiction will be specified in the contract documents. Please bid per the current contract documents.
Response posted 10/25/2024
Inquiry #30: Please confirm that all special inspections will be performed deputy inspector retained by Caltrans.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see sections 1-1.01 and 5-1.01 for the department’s inspection requirements, all other authorities having jurisdiction will be specified in the contract documents. Please bid per the current contract documents.
Response posted 10/25/2024
Inquiry #31: Please provide a DWP dry utility plan.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see sheet EE0-3, note 14. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #32: During construction will Caltrans personnel be operating out of or utilizing the project site?
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see section 99-010000, part 1.4. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #33: Please confirm all office furniture, computers, etc. will be Caltrans furnished and installed.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see sheet A1-1, note 3. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #34: Please confirm that the existing training trailers furniture, fixtures, and equipment will be removed, stored, and reinstalled by Caltrans.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see sheet A2-1, General Notes. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #35: Please provide the Vehicle Spray Bar spray nozzles PSI and degree.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see section 99-02750 WASH WATER SYSTEM for the system requirements. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #36: Please provide the skylight connection to structural wall below detail 2/A1-22.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see A1-23 for skylight details. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #37: As listed in Notice to Bidders and Special Provision document under section 8-1.04C, please confirm that the following submittals are not required for this project, as there is no line item for them in the bid form
a. Contractor supplied biologist
b. Biological resource information program
c. Natural resource protection plan
d. Contingency plan for opening closures to traffic
e. SSPC QP certification
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:It is confirmed that all items above (a, b, c, d, and e) are not required and will be addressed in Addendum No. 2.
Response posted 10/25/2024
Inquiry #38: Please provide a spec or allowance for the carpet.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see section 99-09680 for carpeting tile requirements. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #39: Please send spec info for F-1 polish concrete.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see Finish F-1 on A0-7 for concrete with hardener and sealer. Please see 99-03300C(7) for special treatments. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #40: Please send spec info for F-1 polish concrete.
Inquiry submitted 10/16/2024
Response #1:Please see bidder's inquiry #39
Response posted 10/16/2024
Inquiry #41: Is this a 10 year workmanship warranty requirement? Please advise if this is required?
Reference Page 165 on the specifications section 99-084113
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/16/2024
Response #2:Please see section 99-084113 part 1.7 for the warranty requirements. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #42: Recommend adding a bid item for Contaminated Soil that's referenced in the Environmental Report.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Please bid per contract document.
Response posted 10/25/2024
Inquiry #43: Please identify the over excavation and recompacton requirements for the Building Slab On Grade?
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Please see ST sheets for structure excavation and backfill limits. Please see section 99-02220 for excavation and compaction requirements. Please bid per the current contact documents.
Response posted 10/25/2024
Inquiry #44: Bid items 22 & 23 appear to be for the same work. Please confirm Bid Item 22 is for the parking lot and 23 can be omitted.
Inquiry submitted 10/16/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Item no. 23, PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), is used to pay for the labor.
Response posted 11/05/2024
Inquiry #45: Is the license from the Bureau of Security and Investigative Services still required if only bidding on the Access Control scope, not any of the Intrusion Alarm? Will State license C-7 suffice for Access Control only?
Inquiry submitted 10/17/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Please see section 99-16724A(5) for installer qualifications. Please bid per the current contact documents.
Response posted 10/25/2024
Inquiry #46: Sheet EEO-13 "Automatic Transfer Switch Characteristics" call for a 3R enclosure but also states that its "Inside the Main Switchboard". Please indicate if the ATS is stand alone or in fact Inside the Main Switchboard which will eliminate the requirement for a 3R Enclosure.
Inquiry submitted 10/17/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Please see sheet EE0-13 and section 99-16420, part B, for ATS requirements. Please bid per the current contact documents.
Response posted 10/25/2024
Inquiry #47: On sheet A0-7 interior finish schedule, the shower floor is listed as polish concrete with sealer and harder, and on sheet A1-8 / A1-9 the showers have multiple keynotes but there is no shower plan called out or indicated. Please confirm that there is no shower pan required and that the shower floor is slope to drain concrete.
Inquiry submitted 10/17/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Please see section 99-15443 WHEELCHAIR ACCESSIBLE SHOWER UNIT, part B, and sheet A0-7, Interior Finish Schedule, for the shower unit requirements. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #48: On sheet A0-7 interior finish schedule, the shower floor is listed as polish concrete with sealer and harder, and on sheet A1-8 / A1-9 the showers have multiple keynotes but there is no shower plan called out or indicated. Please confirm that there is no shower pan required and that the shower floor is slope to drain concrete.
Inquiry submitted 10/17/2024
Response #1:Please see bidder's inquiry #47
Response posted 10/17/2024
Inquiry #49: Please provide a specification for the solid surface on the both the countertops as well as the shower walls. This includes the type of surface, thickness of the material as well as color etc.
Inquiry submitted 10/17/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Please see section 99-06414B(2), Manufactured Units, and sheet A0-7, Interior Finish Schedule, and A1-29, for countertop requirements. Please bid per the current contract documents.
Please see section 99-15443 WHEELCHAIR ACCESSIBLE SHOWER UNIT, part B, and sheet A0-7, Interior Finish Schedule, for the shower unit requirements. Please bid per the current contract documents.
Response posted 10/21/2024
Response #3:
Response posted 11/07/2024
Inquiry #50: Will a waterproofing membrane be required behind the solid surface shower wall surrounds?
Inquiry submitted 10/17/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Please see section 99-15443 WHEELCHAIR ACCESSIBLE SHOWER UNIT, part B, and sheet A0-7, Interior Finish Schedule, for the shower unit requirements. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #51: Regarding the Standing Steel Shelving, is there a height and depth specification that is desired for these units. In addition is there a product model or basis of design in which to base our pricing on or use to provide an approved equal?
Inquiry submitted 10/17/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Please see the Furniture Legend on sheet A1-2 for shelving dimensions. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #52: If available, please provide a basis of design for the carpet tile, including color and possible list of approved manufacturers.
Inquiry submitted 10/17/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Please see sheet A0-7, Interior Finish Note 2, and section 99-09680 for carpet tile requirements. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #53: Is there a product / model number for the fiberglass wash rack enclosure as shown on sheet A5-1. If a basis of design is available please provide.
Inquiry submitted 10/17/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Please see section 99-13120 for the fiberglass enclosure requirements. Please bid per the current contract documents.
Response posted 10/21/2024
Inquiry #54: The Instruction to bidders directs the contractors http://www.dot.ca.gov/hq/esc/oe/contractor_info for prevailing wage determination. However, when plugging the URL into the Web browser the following web page opens. https://dot.ca.gov/programs/engineering-services/. Please provide the wage determination documents that apply to this project.
Inquiry submitted 10/17/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/17/2024
Response #2:Please see the first paragraph on page 2 (12 of 342) of the Special Provisions for the prevailing wage rates URL. Please bid per the current contract documents.
Response posted 10/21/2024
Response #3:Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.
Response posted 10/22/2024
Inquiry #55: For the encasement of the 10" VCP per plan sheet C-7 what pay item would this work be classified /paid under ?
Inquiry submitted 10/21/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/21/2024
Response #2:
Labor and materials for the encasement of the existing 10” Vitrified Clay Pipe (VCP) are paid for and included in the breakdown items such as:
• 190101 - Roadway Excavation
• 260303 - Class 3 Aggregate Base
• 280000 - Lean Concrete Base
• 390132 - Hot Mix Asphalt (Type A)
• 731502 - Minor Concrete (Miscellaneous Construction)
Response posted 10/25/2024
Inquiry #56: For bid item 0038 is there a chance that a Q sheet with a updated quantity to break out the curbs , cur & gutter , ADA Ramps and sidewalk items ? Typically the detectable warning surface has its own pay item are we to include it into bid item 38 ?
Inquiry submitted 10/21/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/22/2024
Response #2:Please bid per contract document.
Response posted 10/25/2024
Inquiry #57: Can a Mobilization bid item be added ?
Inquiry submitted 10/21/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/22/2024
Response #2:Mobilization is NOT applicable to building projects.
Response posted 10/25/2024
Inquiry #58: Please provide details (concrete thickness, type, joints, rebar size/spacing) for the Raised Concrete Pad under and around the new training trailer location.
Inquiry submitted 10/23/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/23/2024
Response #2:Please see ST2-1. The training trailer is supported by steel piers not a raised concrete pad. Please bid per the current contract documents.
Response posted 10/24/2024
Inquiry #59: Due to the quantity of RFI's that have yet to be responded to, will the bid be extended until responses are provided?
Inquiry submitted 10/23/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/23/2024
Response #2:Please see addendum no. 1 dated 10/23/2024. The bid opening date has been postposed to Thursday October 31, 2024. Please bid per the current contract documents.
Response posted 10/24/2024
Inquiry #60: Given the quantity of outstanding RFI's/Bidder Inquiries. We are requesting that the bid date be extended.
Inquiry submitted 10/23/2024
Response #1:Please see Addendum No. 1 dated 10/23/2024. The bid opening date has been postposed to Thursday October 31, 2024. Please bid per the current contract documents.
Response posted 10/24/2024
Response #2:Please see Addendum No. 2, dated 10/30/2024. The bid opening date has been postponed to Thursday, November 7, 2024. Please bid per current contract documents.
Response posted 11/05/2024
Inquiry #61: In regards to the EFIS System please confirm if the plywood sheathing can be use as substrate, the manufacture Dryvit recommends to use Rockwool Frontrock
Inquiry submitted 10/24/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/25/2024
Response #2:Please see section 99-072419 for EFIS System requirements. Please bid per the current contact documents.
Response posted 11/05/2024
Inquiry #62: Inquiry #54 response #2 regarding the URL within the first paragraph on page 2 (12 of 342), that particular URL (http://www.dot.ca.gov/hq/esc/oe/contractor_info) does NOT provide the prevailing wage determination for this project. Instead this link redirect to https://dot.ca.gov/programs/engineering-services/, which does contain the request information. Please provide the correct URL that provide the wage determination for this project.
Inquiry submitted 10/24/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/25/2024
Response #2:Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.
Response posted 11/05/2024
Inquiry #63: regarding Inquiry #58 response #2, we understand that the training trailer is set upon steel piers per ST2-1. However, the steel piers sit on top of a "RAISED CONCRETE PAD (AREA = 6,005 SQFT)" per C-4. Please provide the requested concrete information previously requested.
Inquiry submitted 10/24/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/25/2024
Response #2:Please bid per current contract documents.
Response posted 11/05/2024
Inquiry #64: Will additional plans be issued for Addendum #01? I can only see the date change at this time. If so when will the updated plans & docs be issued?
Inquiry submitted 10/25/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/25/2024
Response #2:No. Addendum No. 1 was to extend the bid opening date from 10/24/2024 to 10/31/2024 only. It was needed to respond to questions. No plan or estimate was involved. However, another addendum was issued on 10/30/2024, Addendum No. 2, to further extend the bid opening date to 11/07/2024 for the same reason and for the replacement of Section 8-1.04C.
Response posted 11/05/2024
Inquiry #65: Section 14-11-17A of the Project Specifications identifies a presence of Lead Paint at the Existing Storage Container. Please identify if this is storage container A or B that contains the Lead Paint? Will Caltrans abate and dispose of the Lead Paint or is it the contractor's responsibility? If it is the contractor's responsibility, please identify the lead paint is to removed in its entirety or can it be encapsulated?
Inquiry submitted 10/29/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/29/2024
Response #2:Please see the Asbestos and Lead Paint Survey Report in the Information Handout. The paint would be characterized as California hazardous wasted based on lead content if stripped, blasted, or otherwise separated from the substrate. Please see the scope of work on GP-2. The storage containers will be relocated. Please bid per the current contract documents.
Response posted 11/05/2024
Inquiry #66: Bid Item No. 0021 is for Lean Concrete Base. This is intended to go under the Hot Mix Asphalt parking lot. It is our understanding that the methods used to install Lean Concrete Base (i.e. and paving machine) will NOT work for the parking lot due to the physical constraints with the curves and multi-direction slope to drain requirements. We also understand the the option to use rapid set concrete base also will NOT work due to the small amount of material needed for this base section. Please provide a base option that will work under the proposed parking lot.
Inquiry submitted 10/29/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/30/2024
Response #2:Please bid per current contract documents.
Response posted 11/05/2024
Inquiry #67: Will there be an Addendum #2 addressing plan changes, remaining unanswered Bidder Inquires and pushing the bid to give adequate time for accurate pricing?
Inquiry submitted 10/30/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/30/2024
Response #2:Addendum No. 2 was issued on 10/30/2024 to further extend the bid opening date to 11/07/2024. It was for the time needed to respond to extra questions and for the replacement of Section 8-1.04C.
Response posted 11/05/2024
Inquiry #68: ST1-5 through ST1-8 All show a over excavation of the foundation noted as Structure Excavation and Backfill only for the new building the other structures do not appear to indicate this ,The bid item quantity of 17 & 18 does not appear to take this into account how will this be paid ?
Inquiry submitted 10/30/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 10/30/2024
Response #2:Please see the structures excavation and backfill limits on the ST series sheets. Please see section 99-010000 for the items covered by the bid item building work. Please see section 99-02220 for the requirements of the earthwork for building work. Please bid per the current contract documents.
Response posted 11/05/2024
Inquiry #69: On sheet A2-2, the siding for the training trailer is to be 3" Metal Panel, Typ. However, on sheet A2-1, it shows (E) Trailer Panel, where the existing siding is T1-11 per our site visit. Please confirm that the existing siding is to remain.
Inquiry submitted 10/31/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/01/2024
Response #2:Please see the scope of work shown on GP-2. The existing training trailer will be relocated. The siding will not be replaced. Please bid per the current contract documents.
Response posted 11/05/2024
Inquiry #70: Will there be an Addendum #3 addressing plan changes, remaining unanswered Bidder Inquires and pushing the bid to give adequate time for accurate pricing?
Inquiry submitted 11/05/2024
Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 11/06/2024
Response #2:No. All questions have been answered and there will be no plan changes. Please bid per current contract documents.
Response posted 11/07/2024
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.