Inquiry #1: Please confirm depth of Gravel Mulch.
Inquiry submitted 12/27/2022

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 12/30/2022


Response #2:Please bid per plan, specs, and estimate.
Response posted 01/03/2023




Inquiry #2: Please clarify Note #2 for Chain Link Fence (Type CL-8, Modified) Details on Landscape Details LD-1. Is there reinforcement for the concrete footing? If so, please provide details. Thanks
Inquiry submitted 01/03/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/04/2023


Response #2:There is no reinforcement required for the concrete footing. Please refer back to LD-1 for concrete footing sizing requirements.
Response posted 02/07/2023




Inquiry #3: Section 20-2.14A(1) includes specifications for installing and removing temporary irrigation systems and transporting and applying water for irrigation. Should contractor pay for the water bill during three years plant establishment period?
Inquiry submitted 01/12/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 01/13/2023


Response #2:Please bid per contract documents.
Response posted 01/17/2023




Inquiry #4: Plan sheet LQ-1/ Landscape Quantities shows Temporary Fiber Roll and Temporary Inlet Protection are located on Planting Plans/ Sheets PP-1 to PP-31, but no Temporary Fiber Roll and Temporary Inlet Protection shown on these plans. Please verify.
Inquiry submitted 02/06/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/06/2023


Response #2:Please bid per contract documents.
Response posted 02/07/2023




Inquiry #5: Clarify what should be included as part of bid item no. 27, temporary irrigation system since all the irrigation system components have their own bid items.
Inquiry submitted 02/07/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2023


Response #2:Please refer to spec 20-2.14.
Response posted 02/08/2023




Inquiry #6: Clarify if temporary irrigation system components needs to be removed at the end of plant establishment period.
Inquiry submitted 02/07/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2023


Response #2:Temporary irrigation system to remain after plant establishment period.
Response posted 02/08/2023




Inquiry #7: Refer to the plan sheets PP-1, PP-2 and PP-3, symbol is shown for maintain existing planted areas. However, the callouts show roadside clearing and vice versa. Please clarify if the contractor shall bid per the callout as shown on the planting plans.
Inquiry submitted 02/07/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2023


Response #2:Please bid per callouts on planting plans.
Response posted 02/08/2023




Inquiry #8: Refer to sheet PP-22, there is no irrigation system for (7) each of Agave Americana at NB 110 off-ramp to South Grand Ave. Please advise.
Inquiry submitted 02/07/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2023


Response #2:Please bid per contract documents.
Response posted 02/08/2023




Inquiry #9: Clarify the location of existing ICC “N” on plans.
Inquiry submitted 02/07/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2023


Response #2:Please bid per contract documents.
Response posted 02/08/2023




Inquiry #10: Clarify the locations and types of irrigation equipment that needs to be salvaged (item no. 31).
Inquiry submitted 02/07/2023

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 02/07/2023


Response #2:Please bid per contract documents.
Response posted 02/08/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.