Inquiry #1: Special Provisions 20-2.06B(3) states that A single irrigation controller enclosure cabinet must be 48 inches high by 23 inches wide by 12 inches deep. However, Irrigation Plan IP-3 calls for ICC 'E' &'F'. Is the controller cabinet single or double?
Inquiry submitted 04/10/2024

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 04/11/2024


Response #2:This is a single cabinet with one 48 station controller that is consolidating the stations from IC ā€˜Eā€™ & ā€˜Fā€™ that were removed as part of IR-3.
Response posted 04/12/2024




Inquiry #2: Forms for Bid has small business enterprise commitment form and confirmation form. We are a SBE. Should SBE firms also fill out the SBE commitment form and confirmation form?
Inquiry submitted 04/15/2024

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 04/15/2024


Response #2:For information regarding Caltrans electronic bidding please contact the Office of Construction Contracting Coordination and Quality Program Branch at (916) 227-4542.
Response posted 04/16/2024




Inquiry #3: There are hundreds of existing tree stumps. Should the tree stumps be removed completely or to the depth of 12 inches below finished grade?
Inquiry submitted 04/19/2024

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 04/23/2024


Response #2:Please refer to Standard Specification 20-1.03C Roadside Clearing.
Response posted 04/23/2024




Inquiry #4: Refer to IR-2 and IP-2. There is a portion of existing mainline (346' lineal feet) shown from the proposed point of connection near existing control valve F-6 to the proposed connection point at existing control valve F-8. This same portion of mainline is proposed as new mainline on sheet IP-2, advise if this section of mainline as shown on IR-2 is to be included as part of the removals or if this is to be considered existing to remain and not included as new mainline.
Inquiry submitted 04/24/2024

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 04/26/2024


Response #2:Please bid per the contract documents.
Response posted 04/29/2024


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.