Submit new inquiry for this projectInquiry #1: Drainage Systems 29, 30, and 31 are located in an area with existing guard rail, yet there are no provisions to reconstruct the guard rail after completion of the drainage work as shown in other areas. Please review and advise.
Inquiry submitted 01/26/2023
Response #1:Submitted for consideration
Response posted 01/30/2023
Response #2:This issue will be addressed in an upcoming addendum
Response posted 02/21/2023
Inquiry #2: Specifications state that the contractor is to provide additional flaggers (up to 63) based on the location type of the chart under Section 12-4.02C(9)(c)(i). Can you provide the exact drainage systems that fall under this?
Inquiry submitted 01/26/2023
Response #1:Submitted for consideration
Response posted 01/30/2023
Response #2:Additional flaggers would be provided by the Contractor at Drainage System No. 4, 5, 7, 10, 13, 14, 18, 19, 20, & 22.
Response posted 02/21/2023
Inquiry #3: Please reference Bid Item 7(Stationary Impact Attenuator Vehicle). The Bid Item is for 300 Days, while the contract is 150 working days. Please confirm that the contractor will be compensated for the number of attenuator vehicles present on each day of work. (Example: Contractors work dictates 2 attenuator vehicles on site for one day of work. The contractor would be compensated 2 DY?)
Inquiry submitted 01/26/2023
Response #1:Submitted for consideration
Response posted 01/30/2023
Response #2:Yes.
Response posted 02/21/2023
Inquiry #4: Please indicate where the reinforcement for the Stress Reduction Slabs get paid.
Inquiry submitted 01/26/2023
Response #1:Submitted for consideration
Response posted 01/30/2023
Response #2:The reinforcement is included in the item MINOR CONCRETE (MINOR STRUCTURE).
Response posted 02/21/2023
Inquiry #5: The cover sheet for the job specifications state to use the Standard Plans and Specifications dated 2022 for this project. The headwall dimensions and quantities (L, H, CY, Rebar LB) shown on the project plans are from the 2018 standard plans, not the 2022 standard plans. Please review and advise which is applicable.
Inquiry submitted 01/26/2023
Response #1:Submitted for consideration
Response posted 01/30/2023
Response #2:Use the 2022 Standard Plans.
Response posted 02/21/2023
Inquiry #6: Reference the profile for DS 21 (Sheet 34 of 99) and the Drainage quantity sheet (Sheet 40 of 99) for same system. The profile calls for a headwall at DS 21a (downstream), while the quantity sheet states 21a is an 18" F.E.S. Please review and advise which is correct.
Inquiry submitted 01/26/2023
Response #1:Submitted for consideration
Response posted 01/30/2023
Inquiry #7: Please clarify the thickness of the Asphalt to be replaced. The typical cross section sheet (X-1) indicates .29' thick, however, the Construction Details sheet (C-1) shows variable thickness of .25'-.50'.
Inquiry submitted 01/27/2023
Response #1:Submitted for consideration
Response posted 01/30/2023
Inquiry #8: The specifications appear incomplete and cut off after Page 46. Please review and upload the full specification document if applicable.
Inquiry submitted 01/31/2023
Response #1:Submitted for consideration
Response posted 02/02/2023
Response #2:The specifications are complete.
Response posted 02/23/2023
Inquiry #9: Will the contractor be permitted to utilize the existing turnouts to stage equipment and materials?
Inquiry submitted 01/31/2023
Response #1:Submitted for consideration
Response posted 02/02/2023
Response #2:Requests for information to utilize existing turnouts may be submitted after contract award. Please bid per current contract documents.
Response posted 02/23/2023
Inquiry #10: In Section 14-6.03D(1) of the Special Provisions there are two submittals that are missing number of days and hours. "Survey the job site for regulated species and submit a preconstruction survey report within ___ days before starting work." "Submit an initial monitoring report as an informational submittal within ___ hours after starting ground disturbing activities."
Could you provide the information?
Inquiry submitted 02/16/2023
Response #1:Submitted for consideration
Response posted 02/21/2023
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.