Inquiry #1: Special Provisions Section 14-6.03D(1) lists "Nesting bats". Is this intended to be "Nesting birds?"
Inquiry submitted 05/30/2023

Response #1:Please bid per current contract documents.
Response posted 06/13/2023




Inquiry #2: Special Provisions Section 14-6.03A and 14-6.03D(1) specifies the Caltrans biologist will survey for nesting birds and monitor nests. However, the Monitoring Schedule indicates Nesting Birds monitoring schedule is determined by the Contractor-Supplied biologist. Are nesting bird surveys and nest monitoring required for the Contractor-Supplied biologist or the Caltrans biologist?
Inquiry submitted 05/30/2023

Response #1:Please bid per current contract documents
Response posted 06/14/2023




Inquiry #3: Total seed mix on ECL-1 should be 27.8 Lbs/Ac, but it shows 26.6 Lbs/Ac. Please clarify
Inquiry submitted 06/07/2023

Response #1:Please bid per current contract documents
Response posted 06/14/2023




Inquiry #4: Could you please confirm the correct application rate for the seed mix, as we suspect there may have been a mistake in the summary provided. (Total should be 27.8 Lbs/Ac)
Inquiry submitted 06/08/2023

Response #1:Please bid per current contract documents
Response posted 06/14/2023




Inquiry #5: Refer to erosion control table and seed mix table on sheet erosion control legend ECL-1, seed mix is 26.6 LB/AC. However, the real quantity per seed mix table is 27.8 LB/AC. Please confirm.
Inquiry submitted 06/14/2023

Response #1:Please bid per current contract documents
Response posted 06/14/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.