Inquiry #1: Please verify the quantity for Bid Item 24, " Structural Concrete, Drainage Inlet" is correct. The drainage quantity sheets show each inlet with heights of 5' while the drainage profiles show the inlets with different heights. Please confirm the CY is based on the correct height inlet.
Inquiry submitted 10/16/2023

Response #1:Your inquiry has been submitted for review.
Response posted 10/16/2023


Response #2:Attention is directed to Addendum No. 2 dated November 1, 2023.
Response posted 11/02/2023




Inquiry #2: Based on the existing elevations shown on the profiles on the layout sheets there seems to be a significant amount of roadway excavation required for the construction of the new minor concrete improvements. The quantity of roadway excavation does not seem to be included in the roadway excavation item. Please increase the roadway excavation quantity to include the excavation needed for the minor concrete improvements.
Inquiry submitted 10/17/2023

Response #1:Your inquiry has been submitted for review.
Response posted 10/17/2023


Response #2:Compensation for existing earth, vegetation, concrete and asphalt materials removed are included per Bid Item Numbers 17, 18, 23, and 38; other items include any excavation or fill in the Bid Item. Please bid according to the advertised documents.
Response posted 10/25/2023




Inquiry #3: Note 6 on sheet C-1 specifies for all pull boxes, water valves/meters, and manholes to be adjusted to grade. Does Caltrans have a count for these items? If not, it is not reasonable to expect the contractor to identify and quantify these items prior to the bid. Will Caltrans please add a bid item to adjust existing facilities to grade?
Inquiry submitted 10/17/2023

Response #1:Your inquiry has been submitted for review.
Response posted 10/17/2023


Response #2:Attention is directed to Addendum No. 2 dated November 1, 2023.
Response posted 11/02/2023




Inquiry #4: Plan Sheet 107/148 "DP-1" shows an Existing 2" Gas Line to Be Relocated on System #1 @ DI "e".

Is this relocation done by others?

If not, please provide additional details and how does this item get paid?

Inquiry submitted 10/18/2023

Response #1:Your inquiry has been submitted for review.
Response posted 10/19/2023


Response #2:Attention is directed to Addendum No. 2 dated November 1, 2023.
Response posted 11/02/2023




Inquiry #5: For bid item # 36 Minor Concrete (Curb, Gutter, Sidewalk and Driveway) where does the bidding contractor get compensated for the net cut / fill beneath the proposed improvements.
Inquiry submitted 10/31/2023

Response #1:Your inquiry has been submitted for review.
Response posted 10/31/2023


Response #2:Compensation for existing earth, vegetation, concrete and asphalt materials removed are included per Bid Item Numbers 17, 18, 23, and 38; other items include any excavation or fill in the Bid Item. Please bid according to the advertised documents.
Response posted 11/01/2023




Inquiry #6: For bid item # 36 Minor Concrete (Curb, Gutter, Sidewalk and Driveway) where does the bidding contractor get compensated for the net cut / fill beneath the proposed improvements.
Inquiry submitted 10/31/2023

Response #1:Your inquiry has been submitted for review.
Response posted 10/31/2023


Response #2:Compensation for existing earth, vegetation, concrete and asphalt materials removed are included per Bid Item Numbers 17, 18, 23, and 38; other items include any excavation or fill in the Bid Item. Please bid according to the advertised documents.
Response posted 11/01/2023




Inquiry #7: Project was updated to contain 58 bid items after Addendum, yet the proposal files for the bidding software show a bid item list of only 55 items
Inquiry submitted 11/02/2023

Response #1:Your inquiry has been submitted for review.
Response posted 11/02/2023


Response #2:Bid item list per Addendum 2, dated November 1, 2023, indicates a total of 58 item numbers, but only 56 total items are to be bid on as item number 55 is replaced by item number 58 for MOBILIZATION bid item. Addendum 2 added two new items per bid item numbers 56 and 57.
Response posted 11/03/2023


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.